1993 Site Environmental Report Tonopah Test Range, Tonopah, Nevada (open access)

1993 Site Environmental Report Tonopah Test Range, Tonopah, Nevada

This report summarizes the environmental surveillance activities conducted by Sandia National Laboratories, the US Environmental Protection Agency, and Reynolds Electrical and Engineering Company for the Tonopah Test Range operated by Sandia National Laboratories. Sandia National Laboratories` responsibility for environmental monitoring results extend to those activities performed by Sandia National Laboratories or under its direction. Results from other environmental monitoring activities are included to provide a measure of completeness in reporting. Other environmental compliance programs such as the National Environmental Policy Act of 1969, environmental permits, and environmental restoration and waste management programs are also included in this report, prepared for the US Department of Energy in compliance with DOE Order 5400.1.
Date: November 1994
Creator: Culp, T.; Howard, D. & McClellan, Y.
System: The UNT Digital Library
Aerodynamic, structural, and trajectory analysis of ASTRID-1 vehicle (open access)

Aerodynamic, structural, and trajectory analysis of ASTRID-1 vehicle

The Johns Hopkins University/Applied Physics Laboratory, JHU/API, in support of Lawrence Livermore National Laboratory, LLNL, is conducting aerodynamic, trajectory, and structural analysis of the Advanced Single Stage Technology Rapid Insertion Demonstration (ASTRID) vehicle, being launched out of Vandenberg Air Force Base (VAFB) in February 1994. The launch is designated ASTRID-1 and is the first in a series of three that will be launched out of VAFB. Launch dates for the next two flights have not been identified, but they are scheduled for the 1994-1995 time frame. The primary goal of the ASTRID-1 flight is to test the LLNL light weight thrust on demand bi-propellant pumped divert propulsion system. The system is employed as the main thrusters for the ASTRID-1 vehicle and uses hydrazine as the mono-propellant. The major conclusions are: (1) The vehicle is very stable throughout flight (stability margin = 17 to 24 inches); (2) The aerodynamic frequency and the roll rate are such that pitch-roll interactions will be small; (3) The high stability margin combined with the high launcher elevation angle makes the vehicle flight path highly sensitive to perturbations during the initial phase of flight, i.e., during the first second of flight after leaving the rail; (4) …
Date: February 10, 1994
Creator: Glover, L. S.; Iwaskiw, A. P.; Oursler, M. A.; Perini, L. L. & Schaefer, E. D.
System: The UNT Digital Library
Baseline Risk Assessment of Ground Water Contamination at the Inactive Uraniferous Lignite Ashing Site Near Bowman, North Dakota (open access)

Baseline Risk Assessment of Ground Water Contamination at the Inactive Uraniferous Lignite Ashing Site Near Bowman, North Dakota

This baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Bowman, North Dakota, evaluates the potential impacts to public health or the environment from contaminated ground water at this site. This contamination is a result of the uraniferous lignite ashing process, when coal containing uranium was burned to produce uranium. Potential risk is quantified only for constituents introduced by the processing activities and not for the constituents naturally occurring in background ground water in the site vicinity. Background ground water, separate from any site-related contamination, imposes a percentage of the overall risk from ground water ingestion in the Bowman site vicinity. The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is developing plans to address soil and ground water contamination at the site. The UMTRA Surface Project involves the determination of the extent of soil contamination and design of an engineered disposal cell for long-term storage of contaminated materials. The UMTRA Ground Water Project evaluates ground water contamination. Based on results from future site monitoring activities as defined in the site observational work plan and results from this risk assessment, the DOE will propose an approach for managing contaminated ground …
Date: November 1994
Creator: unknown
System: The UNT Digital Library
Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Near Canonsburg, Pennsylvania (open access)

Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Near Canonsburg, Pennsylvania

This baseline risk assessment evaluates potential impacts to public health and the environment resulting from ground water contamination from past activities at the former uranium processing site in Canonsburg, Pennsylvania. The US Department of Energy Uranium Mill Tailings Remedial Action (UMTRA) Project has placed contaminated material from this site in an on-site disposal cell. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the UMTRA Ground Water Project. Currently, no domestic or drinking water well tap into contaminated ground water of the two distinct ground water units: the unconsolidated materials and the bedrock. Because there is no access, no current health or environmental risks are associated with the direct use of the contaminated ground water. However, humans and ecological organisms could be exposed to contaminated ground water if a domestic well were to be installed in the unconsolidated materials in that part of the site being considered for public use (Area C). The first step is evaluating ground water data collected from monitor wells at the site. For the Canonsburg site, this evaluation showed the contaminants in ground water exceeding background in the unconsolidated materials in Area C …
Date: September 1994
Creator: unknown
System: The UNT Digital Library
Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Near Falls City, Texas: Revision 1 (open access)

Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Near Falls City, Texas: Revision 1

This baseline risk assessment of ground water contamination of the uranium mill tailings site near Falls City, Texas, evaluates potential impact to public health and the environment resulting from ground water contamination at the former Susquehanna Western, Inc. (SWI), uranium mill processing site. This document fulfills the following objectives: determine if the site presents immediate or potential future health risks, determine the need for interim institutional controls, serve as a key input to project planning and prioritization, and recommend future data collection efforts to more fully characterize risk. The Uranium Mill Tailings Remedial Action (UMTRA) Project has begun its evaluation of ground water contamination at the Falls City site. This risk assessment is one of the first documents specific to this site for the Ground Water Project. The first step is to evaluate ground water data collected from monitor wells at or near the site. Evaluation of these data show the main contaminants in the Dilworth ground water are cadmium, cobalt, fluoride, iron, nickel, sulfate, and uranium. The data also show high levels of arsenic and manganese occur naturally in some areas.
Date: September 1994
Creator: unknown
System: The UNT Digital Library
Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Near Green River, Utah (open access)

Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Near Green River, Utah

This document evaluates potential impacts to public health and the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in a disposal cell on the site in 1989 by the US DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, UMTRA Project is evaluating ground water contamination in this risk assessment.
Date: September 1994
Creator: unknown
System: The UNT Digital Library
Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Near Shiprock, New Mexico. Revision 1 (open access)

Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Near Shiprock, New Mexico. Revision 1

This baseline risk assessment at the former uranium mill tailings site near Shiprock, New Mexico, evaluates the potential impact to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an on-site disposal cell in 1986 through the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project. There are no domestic or drinking water wells in the contaminated ground water of the two distinct ground water units: the contaminated ground water in the San Juan River floodplain alluvium below the site and the contaminated ground water in the terrace alluvium area where the disposal cell is located. Because no one is drinking the affected ground water, there are currently no health or environmental risks directly associated with the contaminated ground water. However, there is a potential for humans, domestic animals, and wildlife to the exposed to surface expressions of ground water in the seeps and pools in the area of the San Juan …
Date: April 1, 1994
Creator: unknown
System: The UNT Digital Library
Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Salt Lake City, Utah (open access)

Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Salt Lake City, Utah

This baseline risk assessment of groundwater contamination at the uranium mill tailings site near Salt Lake City, Utah, evaluates potential public health or environmental impacts resulting from ground water contamination at the former uranium ore processing site. The tailings and other contaminated material at this site were placed in a disposal cell located at Clive, Utah, in 1987 by the US Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The second phase of the UMTRA Project is to evaluate residual ground water contamination at the former uranium processing site, known as the Vitro processing site. This risk assessment is the first site-specific document under the Ground Water Project. It will help determine the appropriate remedial action for contaminated ground water at the site.
Date: September 1994
Creator: unknown
System: The UNT Digital Library
Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Sites Near Slick Rock, Colorado (open access)

Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Sites Near Slick Rock, Colorado

This baseline risk assessment of ground water contamination at the uranium mill tailings sites near Slick Rock, Colorado, evaluates potential public health and environmental impacts resulting from ground water contamination at the former North Continent (NC) and Union Carbide (UC) uranium mill processing sites. The tailings at these sites will be placed in a disposal cell at the proposed Burro Canyon, Colorado, site. The US Department of Energy (DOE) anticipates the start of the first phase remedial action by the spring of 1995 under the direction of the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The second phase of the UMTRA Project will evaluate ground water contamination. This baseline risk assessment is the first site-specific document for these sites under the Ground Water Project. It will help determine the compliance strategy for contaminated ground water at the site. In addition, surface water and sediment are qualitatively evaluated in this report.
Date: November 1994
Creator: unknown
System: The UNT Digital Library
Baseline Risk Assessment of Groundwater Contamination at the Uranium Mill Tailings Site Near Gunnison, Colorado. Revision 1 (open access)

Baseline Risk Assessment of Groundwater Contamination at the Uranium Mill Tailings Site Near Gunnison, Colorado. Revision 1

This report evaluates potential impacts to public health or the environment resulting from groundwater contamination at the former uranium mill processing site. The tailings and other contaminated material at this site are being placed in an off-site disposal cell by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating groundwater contamination. This is the second risk assessment of groundwater contamination at this site. The first risk assessment was performed primarily to evaluate existing domestic wells to determine the potential for immediate human health and environmental impacts. This risk assessment evaluates the most contaminated groundwater that flows beneath the processing site towards the Gunnison River. The monitor wells that have consistently shown the highest concentration of most contaminants are used in this risk assessment. This risk assessment will be used in conjunction with additional activities and documents to assist in determining what remedial action is needed for contaminated groundwater at the site after the tailings are relocated. This risk assessment follows an approach outlined by the US Environmental Protection Agency (EPA). The first step is to evaluate groundwater data collected from monitor wells at the site. Evaluation of these data showed …
Date: April 1, 1994
Creator: unknown
System: The UNT Digital Library
Comment and Response Document for the Long-Term Surveillance Plan and the Completion Report for the Lowman, Idaho, Disposal Site (open access)

Comment and Response Document for the Long-Term Surveillance Plan and the Completion Report for the Lowman, Idaho, Disposal Site

This document contains comments, maps, ground water monitoring data, deeding information for remedial action on mill tailings at the Lowman, Idaho UMTRA site.
Date: September 1994
Creator: unknown
System: The UNT Digital Library
Depleted Uranium Human Health Risk Assessment, Jefferson Proving Ground, Indiana (open access)

Depleted Uranium Human Health Risk Assessment, Jefferson Proving Ground, Indiana

The risk to human health from fragments of depleted uranium (DU) at Jefferson Proving Ground (JPG) was estimated using two types of ecosystem pathway models. A steady-state, model of the JPG area was developed to examine the effects of DU in soils, water, and vegetation on deer that were hunted and consumed by humans. The RESRAD code was also used to estimate the effects of farming the impact area and consuming the products derived from the farm. The steady-state model showed that minimal doses to humans are expected from consumption of deer that inhabit the impact area. Median values for doses to humans range from about 1 mrem ({plus_minus}2.4) to 0.04 mrem ({plus_minus}0.13) and translate to less than 1 {times} 10{sup {minus}6} detriments (excess cancers) in the population. Monte Carlo simulation of the steady-state model was used to derive the probability distributions from which the median values were drawn. Sensitivity analyses of the steady-state model showed that the amount of DU in airborne dust and, therefore, the amount of DU on the vegetation surface, controlled the amount of DU ingested by deer and by humans. Human doses from the RESRAD estimates ranged from less than 1 mrem/y to about 6.5 …
Date: April 29, 1994
Creator: Ebinger, Michael H. & Hansen, Wayne R.
System: The UNT Digital Library
Detection of blockages in process piping Los Alamos National Laboratory. Final report (open access)

Detection of blockages in process piping Los Alamos National Laboratory. Final report

The attached reports and proposal summarize the work to date for the revised Ultrasonic Resonance Interferometry system. The most recent set of experiments, to determine the accuracy of the implementation of a new calibration curve to account for the variation of the wave speed with temperature, were never completed due to lack of funding. The general focus of the ongoing work, outlined in the weekly reports, had been improvements in accuracy of the measurement system using software modifications. The future focus of the project, as outlined in the attached proposal, was to incorporate a thermal conductivity probe with the ultrasonic measurement system to allow measurement of fluids which have a bimodal wavespeed vs. molarity relation.
Date: October 1, 1994
Creator: Histand, M.B.
System: The UNT Digital Library
Diosmacycloalkanes as models for the formation of hydrocarbons from surface methylenes. Final report (open access)

Diosmacycloalkanes as models for the formation of hydrocarbons from surface methylenes. Final report

Assignment of the vibrational modes Of Os{sub 2}(CO){sub 8}(CHCH{sub 3}) and Os(CO){sub 4}(C{sub 2}H{sub 4)} has given fingerprint vibrational spectra for the following species when chemisorbed on metal catalyst surfaces: ethylidene and ethylene bound in a metallacyclopropane mode. The formation and fragmentation of diosmacyclobutanes have been shown to involve slippage of the outgoing olefin onto a single osmium, and associative exchange of the olefin from that site. The incorporation of vinylcyclopropane without rearrangement has confirmed the absence of a diradical intermediate. The anomalous stability of the diosmacyclobutane derived from trans-2-butene has proven due to greater destabilization (by the substituent methyls) of the slipped intermediate than of the ground state. Reaction of an osmacyclobutane with 1,3- or 1,2-dienes (allenes) gives 1,2 rather than 1,4 addition to the diosmium unit. Treatment of Os(CO){sub 4}(C{sub 2}H{sub 4}) with triflic acid results in the formation of Os(CO){sub 4}(C{sub 2}H{sub 5})OTf. The authors have found that the reaction of an aryl iodine(III) reagent with propargyl stannanes or silanes results in o-iodo propargyl arenes.
Date: April 25, 1994
Creator: Norton, J. R.
System: The UNT Digital Library
Direct Methane Conversion to Methanol. Quarterly Project Status Report, January 1, 1994--March 31, 1994 (open access)

Direct Methane Conversion to Methanol. Quarterly Project Status Report, January 1, 1994--March 31, 1994

We proposed to demonstrate the effectiveness of a catalytic membrane reactor (a ceramic membrane combined with a catalyst) to solely produce methanol by partial oxidation of methane. Methanol is used as a chemical feedstock, gasoline additive, and turbine fuel. Methane partial oxidation using a catalytic membrane reactor has been determined as one of the promising approaches for methanol synthesis from methane. In the original proposal the membrane was used to selectively remove methanol from the reaction zone before carbon oxides form, thus increasing the methanol yield. Methanol synthesis and separation in one step would also make methane more valuable for producing chemicals and fuels. The cooling tube inserted inside the membrane reactor has created a low temperature zone that rapidly quenches the product stream. Both ceramic and metal membranes were tested in this study and similar results were obtained. This membrane reactor system has proved effective for increasing methanol selectivity during CH{sub 4} oxidation. We are currently using this non-isothermal non-permselective membrane reactor, and evaluating modifications to further improve performance. Metal membrane was used to avoid the membrane breakage problem. A series of experiments were carried out in order to optimize the operation of the process. A methanol yield of …
Date: September 1, 1994
Creator: Noble, R. D. & Falconer, J. L.
System: The UNT Digital Library
Economic Impact Study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State Fiscal Year 1994 (open access)

Economic Impact Study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State Fiscal Year 1994

The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994. To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized. This study assesses benefits associated with the Grand Junction, Gunnison, Naturita, and Rifle UMTRA Projects sites for the 1-year period under study. Work at the Naturita site was initiated in April 1994 and involved demolition of buildings at the processing site. Actual start-up of remediation of Naturita is planned to begin in the spring of 1995. Work at the Slick Rock and Maybell sites is expected to begin in 1995. The only current economic benefits associated with these sites are related to UMTRA Project support work.
Date: November 1994
Creator: unknown
System: The UNT Digital Library
Economic Impact Study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State Fiscal Year 1994. Revision 1 (open access)

Economic Impact Study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State Fiscal Year 1994. Revision 1

The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994 (1 July 1993 through 30 June 1994). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. Information on wages, taxes, and subcontract expenditures in combination with estimates and economic multipliers is used to estimate the dollar economic benefits to Colorado during the state fiscal year. Finally, the fiscal year 1994 estimates are compared to fiscal year 1993 employment and economic information.
Date: December 1994
Creator: unknown
System: The UNT Digital Library
Environmental Assessment of Remedial Action at the Maybell Uranium Mill Tailings Site Near Maybell, Colorado: Revision 2 (open access)

Environmental Assessment of Remedial Action at the Maybell Uranium Mill Tailings Site Near Maybell, Colorado: Revision 2

The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment and a floodplain/wetlands assessment are included as part of this EA. This report and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).
Date: November 1994
Creator: unknown
System: The UNT Digital Library
Environmental Assessment of Remedial Action at the Naturita Uranium Processing Site Near Naturita, Colorado. Revision 2 (open access)

Environmental Assessment of Remedial Action at the Naturita Uranium Processing Site Near Naturita, Colorado. Revision 2

The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal sits, 6 road miles (mi) [10 kilometers (km)) to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal sits would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup …
Date: January 1, 1994
Creator: unknown
System: The UNT Digital Library
Environmental Assessment of Remedial Action at the Naturita Uranium Processing Site Near Naturita, Colorado. Revision 3 (open access)

Environmental Assessment of Remedial Action at the Naturita Uranium Processing Site Near Naturita, Colorado. Revision 3

The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup …
Date: February 1, 1994
Creator: unknown
System: The UNT Digital Library
Environmental Assessment of Remedial Action at the Naturita Uranium Processing Site Near Naturita, Colorado: Revision 5 (open access)

Environmental Assessment of Remedial Action at the Naturita Uranium Processing Site Near Naturita, Colorado: Revision 5

Title 1 of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the inactive Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. Title 2 of the UMTRCA authorized the US Nuclear Regulatory Commission (NRC) or agreement state to regulate the operation and eventual reclamation of active uranium processing sites. The uranium mill tailings at the site were removed and reprocessed from 1977 to 1979. The contaminated areas include the former tailings area, the mill yard, the former ore storage area, and adjacent areas that were contaminated by uranium processing activities and wind and water erosion. The Naturita remedial action would result in the loss of 133 acres (ac) of contaminated soils at the processing site. If supplemental standards are approved by the NRC and the state of Colorado, approximately 112 ac of steeply sloped contaminated soils adjacent to the processing site would not be cleaned up. Cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers.
Date: October 1994
Creator: unknown
System: The UNT Digital Library
Environmental Assessment of Remedial Action at the Slick Rock Uranium Mill Tailings Sites, Slick Rock, Colorado. Revision 1 (open access)

Environmental Assessment of Remedial Action at the Slick Rock Uranium Mill Tailings Sites, Slick Rock, Colorado. Revision 1

The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC {section}7901 et seq.), hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miquel County. Contaminated materials cover an estimated 63 acres of the Union Carbide (UC) processing site and 15 ac of the North Continent (NC) processing site. The sites are within 1 mile of each other and are adjacent to the Dolores River. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown and waterborne radioactive tailings materials. The total estimated volume of contaminated materials is approximately 621,300 cubic yards (yd{sup 3}). In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designing site boundaries or …
Date: September 1, 1994
Creator: unknown
System: The UNT Digital Library
Final report for the geothermal well site restoration and plug and abandonment of wells: DOE Pleasant Bayou test site, Brazoria County, Texas (open access)

Final report for the geothermal well site restoration and plug and abandonment of wells: DOE Pleasant Bayou test site, Brazoria County, Texas

For a variety of reasons, thousands of oil and gas wells have been abandoned in the Gulf Coast Region of the United States. Many of these wells penetrated geopressured zones whose resource potential for power generation was undervalued or ignored. The U.S. Department of Energy (DOE) Geopressured-Geothermal Research Program was chartered to improve geothermal technology to the point where electricity could be commercially produced from a substantial number of geopressured resource sites. This research program focused on relatively narrow technical issues that are unique to geopressured resources such as the ability to predict reservoir production capacity based on preliminary flow tests. Three well sites were selected for the research program. These are the Willis Hulin and Gladys McCall sites in Louisiana, and the Pleasant Bayou site in Texas. The final phase of this research project consists of plug and abandonment (P&A) of the wells and site restoration.
Date: March 13, 1994
Creator: Rinehart, Ben N. & Seigel, Ben H.
System: The UNT Digital Library