2,806 Matching Results

Results open in a new window/tab.

1-GWh diurnal load-leveling Superconducting Magnetic Energy Storage system reference design (open access)

1-GWh diurnal load-leveling Superconducting Magnetic Energy Storage system reference design

A point reference design has been completed for a 1-GWh Superconducting Magnetic Energy Storage system. The system is for electric utility diurnal load-leveling but can also function to meet much faster power demands including dynamic stabilization. This study explores several concepts of design not previously considered in the same detail as treated here. Because the study is for a point design, optimization in all respects is not complete. This report examines aspects of the coil, the superconductor supported off of the dewar shell, the dewar shell, and its configuration and stresses, the underground excavation and construction for holding the superconducting coil and its dewar, the helium refrigeration system, the electrical converter system, the vacuum system, the guard coil, and the costs. This report is divided into two major portions. The first is a general treatment of the work and the second is seven detailed technical appendices issued as separate reports. The information presented on the aluminum stabilizer for the conductor, on the excavation, and on the converter is based upon industrial studies contracted for this work.
Date: September 1, 1979
Creator: Rogers, J. D.; Hassenzahl, W. V. & Schermer, R. I. (comps.)
Object Type: Report
System: The UNT Digital Library
1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix A: energy storage coil and superconductor (open access)

1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix A: energy storage coil and superconductor

The technical aspects of a 1-GWh Superconducting Magnetic Energy Storage (SMES) coil for use as a diurnal load-leveling device in an electric utility system are presented. The superconductor for the coil is analyzed, and costs for the entire coil are developed.
Date: September 1, 1979
Creator: Schermer, R.I.
Object Type: Report
System: The UNT Digital Library
1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix B: cost study, high-purity aluminum production (open access)

1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix B: cost study, high-purity aluminum production

Cost information is supplied for aluminum with purities of 200, 2000, and 5000 residual resistivity ratio. Two production situations were used for each purity: (1) 1 x 10/sup 6/ kg/yr production rate with a 30-yr sustaining market and (2) 1 x 10/sup 6/ kg/yr production rate for 2 yrs only. These productions and purities are of interest for manufacturing devices for Superconducting Magnetic Energy Storage. The cost study results are presented as a range and include (1) the selling price of the aluminum for each case, (2) the cost of facilities including construction, engineering, and related costs, (3) the cost of money and depreciation (interest/amortization), and (4) the energy costs - the total of power and fuel. The range is affected by possible production variations and other uncertainties. Information is also given on plant location options and the preferred feed to the purification facility (with ore source effects).
Date: September 1, 1979
Creator: Cochran, C. N.; Dawless, R. K. & Whitchurch, J. B.
Object Type: Report
System: The UNT Digital Library
1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix C: dewar and structural support (open access)

1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix C: dewar and structural support

The mechanical aspects of the dewar to contain a 1-GWh superconducting coil in a 1.8 K helium bath and the means for supporting the coil and dewar against the rock of an underground excavation created for just that purpose are presented.
Date: September 1, 1979
Creator: Bennett, J. G. & Ju, F. D.
Object Type: Report
System: The UNT Digital Library
1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix D: superconductive magnetic energy storage cavern construction methods and costs (open access)

1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix D: superconductive magnetic energy storage cavern construction methods and costs

The excavation and preparation of an underground cavern to contain a 1-GWh diurnal load-leveling Superconducting Magnetic Energy Storage (SMES) unit is examined. The cavern's principal function is to provide a rock structure for supporting the magnetic forces from the charged storage coil. Certain economic considerations indicate the refrigerator cold box for the helium system should also be underground. The study includes such a provision and considers, among other things, rock bolting, water seepage, concrete lining of the walls, steel bearing pads, a system to prevent freezing of the walls, a mining schedule, and costs.
Date: September 1, 1979
Creator: unknown
Object Type: Report
System: The UNT Digital Library
1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix F. 1-GWh electrical system design (open access)

1-GWh diurnal load-leveling superconducting magnetic energy storage system reference design. Appendix F. 1-GWh electrical system design

Two circuit configurations for reducing the installed converter power and cost of high-power converter systems that operate in a constant-power mode over a wide current and voltage range are suggested and analyzed.
Date: September 1, 1979
Creator: Boenig, H. J.
Object Type: Report
System: The UNT Digital Library
500 kW direct contact pilot plant for East Mesa (open access)

500 kW direct contact pilot plant for East Mesa

A 500 kW powerplant utilizing a direct contact heat exchanger (DCHX) between the geothermal brine and the isobutane working fluid is nearing completion at the East Mesa Component Test Facility. The primary purpose of the plant is to evaluate the performance potential of the direct contact system in a size much larger than the small exploratory units that have been tested to date. Thermodynamic performance of DCHX binary power systems has been demonstrated in small 10 kW research test rigs (Refs. 1, 2, and 3), however, characteristics that affect the economics and practicality of long term operation need to be evaluated. Three factors influencing plant performance and cost are: (1) the control of noncondensables that contaminate the power cycle condenser, (2) the equipment required to limit working fluid losses, and (3) the control of scaling or performance robbing deposits in critical components. These factors are not unrelated and control of one often impacts control of the other two. Operating data and research with the 500 kW pilot plant should demonstrate a solution to all three of these factors and provide design guidelines for larger plants.
Date: September 1, 1979
Creator: Nichols, K.E.
Object Type: Article
System: The UNT Digital Library
E-537 MWPC amplifier (open access)

E-537 MWPC amplifier

The design of a fast MWPC amplifier for the beam chambers and the absorber chamber is completed and all parts are on order. A prototype 16 channel board has been built and satisfactorily tested. Artwork is completed for the board and out to be photographed. The board fabrication contract has been let. Listed below is a summary of the amplifier characteristics as well as test results obtained with the prototype.
Date: September 17, 1979
Creator: Kephart, R. & Kerns, C.
Object Type: Report
System: The UNT Digital Library
15th Street News (Midwest City, Okla.), Vol. 9, No. 1, Ed. 1 Thursday, September 6, 1979 (open access)

15th Street News (Midwest City, Okla.), Vol. 9, No. 1, Ed. 1 Thursday, September 6, 1979

Newspaper from Oscar Rose Junior College in Midwest City, Oklahoma that includes national, local, and campus news along with advertising.
Date: September 6, 1979
Creator: Stanley, Marylyn
Object Type: Newspaper
System: The Gateway to Oklahoma History
15th Street News (Midwest City, Okla.), Vol. 9, No. 2, Ed. 1 Thursday, September 20, 1979 (open access)

15th Street News (Midwest City, Okla.), Vol. 9, No. 2, Ed. 1 Thursday, September 20, 1979

Newspaper from Oscar Rose Junior College in Midwest City, Oklahoma that includes national, local, and campus news along with advertising.
Date: September 20, 1979
Creator: Stanley, Marylyn
Object Type: Newspaper
System: The Gateway to Oklahoma History
Abilene Philharmonic Playbill: September 25-October 30, 1979 (open access)

Abilene Philharmonic Playbill: September 25-October 30, 1979

Program for an Abilene Philharmonic concert that ran from September 25th to October 30th (first pop and first symphony concert) during the 30th season. It includes information about the pieces performed, artists and musicians, and advertising from local companies.
Date: September 1979
Creator: Abilene Philharmonic
Object Type: Pamphlet
System: The Portal to Texas History
Actinide recovery from combustible waste: the Ce(IV)-NHO/sub 3/ system. Final report (open access)

Actinide recovery from combustible waste: the Ce(IV)-NHO/sub 3/ system. Final report

Actinides in ash can be leached effectively by refluxing with Ce(IV) in HNO/sub 3/; solubilization of actinide in ash was greater than or equal to 95% at ash concentrations to 30 g/l in stirred leachant. Plutonium and americium were the actinides present in the ash. Solubilized plutonium and americium were recovered from Ce(IV)-HNO/sub 3/ solution by solvent extraction. Extraction of plutonium into 30% tributyl phosphate in n-dodecane gave 99.99% recovery. The plutonium-depleted solution was then extracted with 30% dihexyl-N,N-diethylcarbamolylmethylenephosphonate (DHDECMP). Americium recovery was 99.64%. The Ce(IV)-HNO/sub 3/ system was compared with the HF-HNO/sub 3/ system now in common use. Advantages of the former included less equipment corrosion, no volatilization of silica, safe oxidation of carbon residues, minimal secondary waste (Ce is recycled), and better solubilization of actinide in the initial contact. However, additional contacts do not significantly improve solubilization, and a small fraction of actinide is not solubilized with Ce(IV)-HNO/sub 3/ that can be solubilized by HF-HNO/sub 3/. The effect of the fission product ruthenium on the dissolution of actinides in the Ce(IV)-HNO/sub 3/ system was investigated briefly, and a method for removing the ruthenium electrolytically was developed. Several process flowsheets were also considered. Actinide recovery requirements will suggest which …
Date: September 14, 1979
Creator: Thompson, G. H.; Childs, E. L.; Kochen, R. L.; Schmunk, R. H. & Smith, C. M.
Object Type: Report
System: The UNT Digital Library
Actions of the Congress and the Federal Government on Smoking and Health (open access)

Actions of the Congress and the Federal Government on Smoking and Health

This paper is a history of actions taken by the U.S. Congress and by the various departments and regulatory agencies of the Federal Government on the subject of smoking and health for the period from the mid-1950s to the end of the 95th Congress in 1978.
Date: September 26, 1979
Creator: Klebe, Edward R.
Object Type: Report
System: The UNT Digital Library
ACTVE News, Volume [10], Number 8, September 1979 (open access)

ACTVE News, Volume [10], Number 8, September 1979

Newsletter issued by the Advisory Council for Technical-Vocational Education in Texas discussing news, events, and other relevant information related to technical and vocational education for adults in Texas.
Date: September 1979
Creator: Advisory Council for Technical-Vocational Education in Texas
Object Type: Journal/Magazine/Newsletter
System: The Portal to Texas History

[Adam Burtschell House, Hodge-Podge Restaurant and Antiques, (Southwest oblique)]

Photograph of the Adam Burtschell House, Hodge-Podge Restaurant and Antiques (located at 1103 Front) in Columbus, Texas.
Date: September 20, 1979
Creator: London, Kathy
Object Type: Photograph
System: The Portal to Texas History
Advanced Fuel Cell Development Progress Report: January-March 1979 (open access)

Advanced Fuel Cell Development Progress Report: January-March 1979

Quarterly report discussing fuel cell research and development work at Argonne National Laboratory (ANL). This report describes efforts directed toward understanding and improving the components of molten-carbonate-electrolyte fuel cells operated at temperatures near 925 K. The primary focus of this work has been the development of electrolyte structures that have good electrolyte retention and mechanical properties as well as long-term stability, and on developing methods of synthesis amendable to mass production.
Date: September 1979
Creator: Pierce, R. D.; Nelson, P. A. & Arons, R. M.
Object Type: Report
System: The UNT Digital Library
Aerial Gamma Ray and Magnetic Survey, Volume 1. Final Report: Hailey, Idaho Falls, Elk City Quadrangles of Idaho/Montana and Boise Quadrangle, Oregon/Idaho (open access)

Aerial Gamma Ray and Magnetic Survey, Volume 1. Final Report: Hailey, Idaho Falls, Elk City Quadrangles of Idaho/Montana and Boise Quadrangle, Oregon/Idaho

Final report documenting a high-sensitivity airborne radiometric and magnetic survey of the Boise, Hailey, Idaho Falls, and Elk City quadrangles including the survey description, specifications, data processing methods, interpretation methods, and regional geologic review.
Date: September 1979
Creator: EG & G GeoMetrics
Object Type: Report
System: The UNT Digital Library

Aerial Gamma Ray and Magnetic Survey, Volume 1. Final Report: Hailey, Idaho Falls, Elk City Quadrangles of Idaho/Montana and Boise Quadrangle, Oregon/Idaho, Idaho Survey - Boise NTMS NK 11-2

Appendix containing average geological survey data of the Boise quadrangle to accompany an aerial gamma ray and magnetic survey of the Hailey, Idaho Falls, Elk City quadrangles in Idaho and Montana and the Boise Quadrangle in Oregon and Idaho.
Date: September 1979
Creator: EG & G GeoMetrics
Object Type: Dataset
System: The UNT Digital Library

Aerial Gamma Ray and Magnetic Survey, Volume 1. Final Report: Hailey, Idaho Falls, Elk City Quadrangles of Idaho/Montana and Boise Quadrangle, Oregon/Idaho, Idaho Survey - Boise NTMS NK 11-2

Appendix containing single record geological survey data of the Boise quadrangle to accompany an aerial gamma ray and magnetic survey of the Hailey, Idaho Falls, Elk City quadrangles in Idaho and Montana and the Boise Quadrangle in Oregon and Idaho.
Date: September 1979
Creator: EG & G GeoMetrics
Object Type: Dataset
System: The UNT Digital Library

Aerial Gamma Ray and Magnetic Survey, Volume 1. Final Report: Hailey, Idaho Falls, Elk City Quadrangles of Idaho/Montana and Boise Quadrangle, Oregon/Idaho, Idaho Survey - Elk City NTMS NL 11-9

Appendix containing geological survey averages data to accompany an aerial gamma ray and magnetic survey of the Hailey, Idaho Falls, Elk City quadrangles of Idaho and Montana, and the Boise quadrangle in Oregon and Idaho.
Date: September 1979
Creator: EG & G GeoMetrics
Object Type: Dataset
System: The UNT Digital Library

Aerial Gamma Ray and Magnetic Survey, Volume 1. Final Report: Hailey, Idaho Falls, Elk City Quadrangles of Idaho/Montana and Boise Quadrangle, Oregon/Idaho, Idaho Survey - Elk City NTMS NL 11-9

Appendix containing single record geological survey data of the Elk City quadrangle to accompany am aerial gamma ray and magnetic survey of the Hailey, Idaho Falls, Elk City quadrangles in Idaho and Montana, and the Boise quadrangle in Oregon and Idaho.
Date: September 1979
Creator: EG & G GeoMetrics
Object Type: Dataset
System: The UNT Digital Library

Aerial Gamma Ray and Magnetic Survey, Volume 1. Final Report: Hailey, Idaho Falls, Elk City Quadrangles of Idaho/Montana and Boise Quadrangle, Oregon/Idaho, Idaho Survey - Hailey NTMS NK 11-3

Appendix containing single record geological survey data of the Hailey quadrangle to accompany an aerial gamma ray and magnetic survey of the Hailey, Idaho Falls, Elk City quadrangles of Idaho and Montana, and the Boise quadrangle of Oregon and Idaho.
Date: September 1979
Creator: EG & G GeoMetrics
Object Type: Dataset
System: The UNT Digital Library

Aerial Gamma Ray and Magnetic Survey, Volume 1. Final Report: Hailey, Idaho Falls, Elk City Quadrangles of Idaho/Montana and Boise Quadrangle, Oregon/Idaho, Idaho Survey - Hailey NTMS NK 11-3

Appendix containing averages of geological survey data gathered at the Hailey quadrangle to accompany an aerial gamma ray and magnetic survey of the Hailey, Idaho Falls, Elk City quadrangles of Idaho and Montana, and the Boise quadrangle of Oregon and Idaho.
Date: September 1979
Creator: EG & G GeoMetrics
Object Type: Dataset
System: The UNT Digital Library

Aerial Gamma Ray and Magnetic Survey, Volume 1. Final Report: Hailey, Idaho Falls, Elk City Quadrangles of Idaho/Montana and Boise Quadrangle, Oregon/Idaho, Idaho Survey - Idaho Falls NTMS NK 12-1

Appendix containing single record geological survey data of the Idaho Falls quadrangle to accompany an aerial gamma ray and magnetic survey of the Hailey, Idaho Falls, Elk City quadrangles of Idaho and Montana, and the Boise quadrangle of Oregon and Idaho.
Date: September 1979
Creator: EG & G GeoMetrics
Object Type: Dataset
System: The UNT Digital Library