Air Entrained Concrete Markings

Caption says, "5-AL-465. Specifications No. 1179. Completed siphon transition showing air entrained concrete markings. Station 530+50, West Canal."
Date: December 19, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Altus City Auditorium

Caption says, "5-AL-40. View of the city auditorium."
Date: June 19, 1945
Creator: Finch, F. S.
System: The Gateway to Oklahoma History

Altus Dam and Reservoir

Caption say, "A-1113 View of Altus Dam and Reservoir as seen from side of small mountain downstream from dam. In foreground is the main canal leading away from the dam."
Date: November 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Altus Dam and Reservoir

Caption says, "A-1114 View of Altus Dam taken from below right abutment."
Date: November 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Altus Junior High

Caption says, "5-AL-43. View of the Altus Junior High School."
Date: June 19, 1945
Creator: Finch, F. S.
System: The Gateway to Oklahoma History

Altus Junior High

Caption says, "5-AL-38. View of the Altus Junior High School."
Date: June 19, 1945
Creator: Finch, F. S.
System: The Gateway to Oklahoma History

Byrd Mountain

Caption says, "5-AL-1331. View of heavy compacted earth lining in Main Canal at point of Byrd Mountain, looking downstream from approximately Station 171. Compacted earth is about 4.5 feet thick, with no gravel blanketing. Rock has been dumped along bank to use in ripraping to counteract erosion of bank by wave action."
Date: December 19, 1950
Creator: George, P. W.
System: The Gateway to Oklahoma History

Caterpillar Working in Main Canal

Caption says, "5-AL-13. View showing caterpillar working in Main Canal near Station 39+50. Caterpillar is tamping down blanket material prior to the lining of soil cement."
Date: June 19, 1945
Creator: Hovey, D. A.
System: The Gateway to Oklahoma History

Caterpillar Working in Main Canal

Caption says, "5-AL-12. View showing caterpillar working in Main Canal near Station 39+50. Caterpillar is tamping down blanket material prior to the lining of soil cement."
Date: June 19, 1945
Creator: Hovey, D. A.
System: The Gateway to Oklahoma History

Compaction of Backfill

Caption says, "A-1119 Specifications No. 1085. View showing compaction of backfill about culvert at Station 370 of Altus canal, using pneumatic tampers."
Date: November 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Completed Canal Bank

Caption says, "A-1001 Completed canal bank along highway between Stations 170 and 173 of Main Canal."
Date: March 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Concrete Placing

Caption says, "A-853 View of partially covered gallery forms taken from left abutment downstream. Concrete in dam at Elevation 1486.5."
Date: April 19, 1943
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History

Concrete Placing Operations

Caption says, "5-AL-464. Specifications No. 1133. Concrete placing operations for bridge deck. Station 486+88, Altus Canal."
Date: December 19, 1946
Creator: Reynolds, R. M.
System: The Gateway to Oklahoma History

Concrete Transitions for Main Canal to Bench Flume

Caption says, "A-1059 Specifications No. 1078. Completed concrete transition from Main Canal to inlet bench flume of North Fork of Red River crossing. Capacity is 1,000 c.f.s. Morrison-Knudsen Co., Inc., contractors."
Date: July 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Construction Progress

Caption says, "A-1055 View from top of Altus Dam showing progress on Main Canal construction."
Date: July 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Corn Crop on Demonstration Farm

Caption says, "A-1060 View of corn shown in photographs No. A-1036 and A-1038 seven weeks after photograph A-1036 was taken. Altus Project Demonstration Farm."
Date: July 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Corn Crop on Demonstration Farm

Caption says, "A-1061 Altus Project Demonstration Farm. View of Texas Hybrid No. 12 field corn."
Date: July 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Corn Crop on Demonstration Farm

Caption says, "A-1064 Altus Project Demonstration Farm. View of field of Plainsman Combined Maize being irrigated. Water supplied to rows from head ditch through spiles made of scrap-rubber hose."
Date: July 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Corn Crop on Demonstration Farm

Caption says, "A-1062 Altus Project Demonstration Farm. View of U. S. Hybrid No. 13 field corn. Willard Smith holding ears of corn."
Date: July 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Corn Crop on Demonstration Farm

Caption says, "A-1063 Altus Project Demonstration Farm. View of field of Golden Cross Bantam sweet corn. Note the uniform height of stalks."
Date: July 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Dam Abutment

Caption says, "5-AL-5. View taken from the left abutment showing upstream face of dam. Trash racks in foreground are under construction."
Date: June 19, 1945
Creator: Hovey, D. A.
System: The Gateway to Oklahoma History

Dam Spillway

Caption says, "A-998 View showing discharge from river outlet No. 2 of Altus Dam, opened March 17. Estimated discharge approximately 350 c.f.s. Forms are erected for final placing of concrete in controlled spillway before construction of radial gate piers."
Date: March 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Distant Picture of Altus Dam

Caption says, "A-1054 Distant view of Altus Dam with concrete and masonry work complete. North Dike is at left side and South Dike at right side of picture."
Date: July 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Drilling Rig

Caption says, "Official photograph. Drilling Rig No. 2 of the J. E. Gray Construction Company in the southeast part of the project. This well is three miles south of Altus and contract calls for a well completed at 3300 feet."
Date: May 19, 1941
Creator: Breitenstein, Frank C.
System: The Gateway to Oklahoma History