3 Matching Results

Results open in a new window/tab.

LMFR Progress Letter for February 1954 (open access)

LMFR Progress Letter for February 1954

In a third run with the fluorine torch, the settling chamber wells were kept hotter than before (≥ 625°C); the flame was cooled by diluting the fluorine with helium. In the analysis of the products, 99% of the thorium fluoride fed in was accounted for, but only 64% of the protactinium activity. Part of this was carried in the exhaust gases past the cold trap and into the soda line disposal column, where it was detected by survey meters. The stripping of protactinium from the solid was somewhat more efficient than before; 77% of the feed which was recovered from the settling chamber had lost 72% of its original specific activity. About 15% of the input activity was trapped on the cold fingers with very little thorium fluoride.
Date: March 10, 1954
Creator: Miles, F. T.
System: The UNT Digital Library
Radial Vibrations in Short, Hollow Cylinders of Barium Titanate (open access)

Radial Vibrations in Short, Hollow Cylinders of Barium Titanate

The mathematics has been developed for the determination of the radial coupling coefficient for a hollow cylinder of electro-strictive material whose length is small compared to its outside diameter.
Date: December 10, 1954
Creator: Stephenson , C. V.
System: The UNT Digital Library
A Human Engineering Guide to the Arrangement of Elements on a Control Panel (open access)

A Human Engineering Guide to the Arrangement of Elements on a Control Panel

This memorandum is a compilation of general information concerned with the arrangement of elements on a control panel. Arrangement considerations that lead to to improved ease and accuracy of operation are presented to assist the engineer in designing new control panels.
Date: December 10, 1954
Creator: Williams, H. L.
System: The UNT Digital Library