FAST FLUX TEST FACILITY MONTHLY INFORMAL TECHNICAL PROGRESS REPORT NOVEMBER 1969 (open access)

FAST FLUX TEST FACILITY MONTHLY INFORMAL TECHNICAL PROGRESS REPORT NOVEMBER 1969

This r e p o r t was prepared by Battelle-Northwest under Contract No. AT(45-1)-1830 f o r the Atomic Energy Commission, Division of Reactor Development and Technology, to summarize technical progress made in the Fast Flux Test Facility Program during November 1969.
Date: December 8, 1969
Creator: Astely, E. R. & Cabell, C. P.
System: The UNT Digital Library
Thermal Cycling of Uranium Dioxide - Tungsten Cermet Fuel Specimens (open access)

Thermal Cycling of Uranium Dioxide - Tungsten Cermet Fuel Specimens

In phase I tungsten clad cermet fuel specimens were thermal cycled, to study the effects of fuel loading, fuel particle size, stablized fuel, duplex coatings, and fabrication techniques on dimensional stability during thermal cycling. In phase II the best combination of the factors studies in phase I were combined in one specimen for evaluation.
Date: December 8, 1969
Creator: Gripshover, P.J. & Peterson, J.H.
System: The UNT Digital Library
Plant Process Surveillance System for N Reactor systems study. Rev.1 (open access)

Plant Process Surveillance System for N Reactor systems study. Rev.1

This Systems Study is submitted in accordance with the requirements of AEC Manual Chapter 1801, and proposes the procurement and implementation of a Plant Process Surveillance System for N Reactor. The envisioned system consists of instrumentation, data acquisition equipment, a digital computer, and input/output equipment. It is intended that the system will be a tool for reliable administration of safety limits and standards, simplification of plant operation, and reduction of operating costs by replacing the tasks of shift operations personnel, an instrument technician and a process engineer.
Date: November 8, 1969
Creator: unknown
System: The UNT Digital Library
FAST FLUX TEST FACILITY MONTHLY INFORMAL TECHNICAL PROGRESS REPORT AUGUST 1969 (open access)

FAST FLUX TEST FACILITY MONTHLY INFORMAL TECHNICAL PROGRESS REPORT AUGUST 1969

This report was prepared by Battelle-Northwest under Contract No. AT(45-1)-1830 for the Atomic·Energy Commission, Division of Reactor Development and Technology, to summarize technical progress made in the Fast Flux Test Facility Program during August 1969 .
Date: September 8, 1969
Creator: Astley, E. R. & Cabell, C. P.
System: The UNT Digital Library
FAST FLUX TEST FACILITY MONTHLY INFORMAL TECHNICAL PROGRESS REPORT DECEMBER 1969 (open access)

FAST FLUX TEST FACILITY MONTHLY INFORMAL TECHNICAL PROGRESS REPORT DECEMBER 1969

This report was prepared by Battelle-Northwest under Contract No. AT(45-1)-1830 for the Atomic Energy Commission, Division of Reactor Development and Technology, to summarize technical progress made in the Fast Flux Test Facility Program during December 1969.
Date: January 8, 1969
Creator: Astley, E. R. & Cabell, C. P.
System: The UNT Digital Library
Irradiation history of the structural steel specimens for the NRL (open access)

Irradiation history of the structural steel specimens for the NRL

None
Date: January 8, 1969
Creator: Zimmerman, P. J.
System: The UNT Digital Library