233 Matching Results

Results open in a new window/tab.

Altus Canal

Caption says, "5-AL-458. Specification No. 1374. View of the Altus Canal, looking downstream from Station 926+50."
Date: December 4, 1945
Creator: Parker, D. B.
System: The Gateway to Oklahoma History

Dam Spillway

Caption says, "A-992 General view of Altus Dam spillways showing construction progress on controlled section. Concrete being hoisted in bucket is placed in dump truck on spillway."
Date: March 2, 1945
Creator: Bryne, W. S.
System: The Gateway to Oklahoma History

Dam Spillway

Caption says, "A-993 Close-up view of concrete placing on controlled spillway at El. 1538.7. Dump truck transports concrete from bucket and places it on spillway."
Date: March 2, 1945
Creator: Bryne, W. S.
System: The Gateway to Oklahoma History

Dam Spillway

Caption says, "A-998 View showing discharge from river outlet No. 2 of Altus Dam, opened March 17. Estimated discharge approximately 350 c.f.s. Forms are erected for final placing of concrete in controlled spillway before construction of radial gate piers."
Date: March 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Dam Progress

Caption says, "A-991 Altus Dam, showing status of completion at end of calendar year 1944."
Date: February 15, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Masonry

Caption says, "A-985 View showing placing of masonry for canal outlet gate house, and progress on concrete stilling basin, Altus Dam."
Date: February 15, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Concrete Placing

Caption says, "A-976 Erecting forms and placing concrete in canal outletworks stilling basin at Altus Dam."
Date: January 23, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Concrete Placing

Caption says, "A-975 Placing concrete in Altus Dam at Elevation 1548, above canal Outletworks."
Date: January 22, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Masonry

Caption says, "A-1000 View showing progress on masonry walls of canal outlet gatehouse and placing of concrete in Main Canal check."
Date: March 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Steel Framing

Caption says, "A-1041 Steel framing for support of emergency gate hoist at canal outletworks of Altus Dam."
Date: June 20, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Stilling Basin

Caption says, "A-1015 Operation of stilling basin at Altus Dam with approximately 400 second feet of water being released through center gate of canal outlet works."
Date: April 25, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Canal Outlet

Caption says, "A-1016 Water plunging down wasteway from canal outlet works stilling basin at Altus Dam. Flow estimated at 400 second feet."
Date: April 25, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Barge used for Materials

Caption says, "A-1004 Barge used to move forms from pier to pier during construction of controlled spillway section of Altus Dam."
Date: April 21, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Main Canal Progress

Caption says, "A-999 View showing progress on forming Main Canal check and wasteway at end of canal outlet stilling basin, Altus Dam."
Date: March 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Dam Spillway

Caption says, "A-1040 Altus Dam spillways after completion of concrete placing in controlled spillway piers."
Date: June 20, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Dam Spillway

Caption says, "A-1028 View of Altus Dam spillways showing progress in construction of radial gate piers on controlled spillway."
Date: May 18, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Dam Gatehouse

Caption says, "A-1003 View from top of Altus Dam looking down on completed gatehouse roof, and along canal outlet stilling basin toward check and wasteway. Taken with wide-angle lens."
Date: April 21, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Construction Progress

Caption says, "A-1014 View showing progress on construction of piers on controlled spillway section of Altus Dam."
Date: April 25, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Steel Framing

Caption says, "A-1106 View of canal outlet works from upstream side of dam, showing completed trashrack structure and fixed wheel emergency gate."
Date: October 22, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Distant Picture of Altus Dam

Caption says, "A-1054 Distant view of Altus Dam with concrete and masonry work complete. North Dike is at left side and South Dike at right side of picture."
Date: July 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Altus Dam and Reservoir

Caption say, "A-1113 View of Altus Dam and Reservoir as seen from side of small mountain downstream from dam. In foreground is the main canal leading away from the dam."
Date: November 19, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Temporary Spillway Bridge

Caption says, "A-1049 View of temporary spillway bridge on Altus Dam after lumber in span between piers 10 and 11 was blown away by a high wind on July 5. Lumber had been bolted to pipe supports which remained in place."
Date: July 6, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Completion of Major Construction

Caption says, "A-1100 Altus Dam, with all major construction work of present program completed."
Date: September 18, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History

Completion of Major Construction

Caption says, "A-1099 Altus Dam, with all major construction work of present program completed."
Date: September 18, 1945
Creator: George, P. W.
System: The Gateway to Oklahoma History