Waste Preparation and Transport Chemistry: Results of the FY 2000 Studies (open access)

Waste Preparation and Transport Chemistry: Results of the FY 2000 Studies

Problems with pipeline plugs at Hanford have occurred throughout its tank farm system. Most cross-site transfer lines at Hanford are no longer functional due to these plugs. Waste transfers frequently led to partial line plugs, resulting in substantial amounts of water being added to the tank system in an attempt to free the lines. In response to these plugs, the Hanford tank farm developed waste acceptance criteria that a waste must pass before it can be transferred (Shekarriz et al., 1997). The criteria, which include physical properties such as viscosity, specific gravity, and percent solids, are based primarily on past operational experience. Unfortunately, the chemistry of the waste solutions was not included in the criteria even though the tank farm operators are fully aware of its importance. Pipeline plugs have also occurred during relatively short waste transfers at Hanford. In FY 2000, the effort to saltwell pump 50,000 gal of filtered waste from tank U-103 to tank SY-102 was delayed for several weeks due to a plugged pipeline. Attempts to locate the plug(s) determined that it had occurred in the 02-A flex and that other plugs were possible in each of the SY-farm flexes. Modifications such as larger flex jumpers …
Date: February 6, 2001
Creator: Hunt, R.D.
System: The UNT Digital Library