States

Edwards Underground Water District Annual Report 1995 (open access)

Edwards Underground Water District Annual Report 1995

Annual report of the Edwards Underground Water District describing goals, activities, and accomplishments during fiscal year {{{year}}}. -- add specifics as appropriate
Date: September 30, 1995
Creator: Edwards Underground Water District (Tex.)
Object Type: Report
System: The Portal to Texas History
Public participation at Fernald: FERMCO`s evolving role (open access)

Public participation at Fernald: FERMCO`s evolving role

In an effort to improve public involvement in the site restoration decision making process, the DOE has established site specific advisory boards, of which the Fernald Citizens Task Force is one. The Fernald Task Force is focused on making recommendations in four areas: (1) What should be the future use of the site? (2) Determinations of cleanup levels (how clean is clean?) (3) Where should the wastes be disposed of? (4) What should be the cleanup priorities? Because these questions are being asked very early in the decision-making process, the answers are necessarily qualified, and are based on a combination of preliminary data, assumptions, and professional judgment. The requirement to make progress in the absence of accurate data has necessitated FERMCO and the Task Force to employ an approach similar to sensitivity analysis, in which a range of possible data values are evaluated and the relative importance of the various factors is assessed. Because of its charter to provide recommendations of future site use, the Task Force has developed a sitewide perspective, compared to the more common operable unit specific focus of public participation under CERCLA. The relationship between FERMCO and the Task Force is evolving toward one of partnership …
Date: January 30, 1995
Creator: Williams, J. B.; Fellman, R. W. & Brettschneider, D. J.
Object Type: Article
System: The UNT Digital Library
Fernald waste management and disposition (open access)

Fernald waste management and disposition

Historically waste management within the Department of Energy complex has evolved around the operating principle of packaging waste generated and storing until a later date. In many cases wastes were delivered to onsite waste management organizations with little or no traceability to origin of generation. Sites then stored their waste for later disposition offsite or onsite burial. While the wastes were stored, sites incurred additional labor costs for maintaining, inspecting and repackaging containers and capital costs for storage warehouses. Increased costs, combined with the inherent safety hazards associated with storage of hazardous material make these practices less attractive. This paper will describe the methods used at the Department of Energy`s Fernald site by the Waste Programs Management Division to integrate with other site divisions to plan in situ waste characterization prior to removal. This information was utilized to evaluate and select disposal options and then to package and ship removed wastes without storage.
Date: January 30, 1995
Creator: West, M. L.; Fisher, L. A.; Frost, M. L. & Rast, D. M.
Object Type: Article
System: The UNT Digital Library
Status report: Fernald site remediation (open access)

Status report: Fernald site remediation

The Fernald site is rapidly transitioning from a Remedial Investigation/ Feasibility Study (RI/FS) site to one where design and construction of the remedies dominates. Fernald is one of the first sites in the Department of Energy (DOE) complex to accomplish this task and real physical progress is being made in moving the five operable units through the CERCLA process. Two of the required Records of Decision (ROD) are in hand and all five operable units will have received their RODs (IROD for OU3) by the end of 1995. Pre-design investigations, design work or construction are now in progress on the operable units. The lessons learned from the work done to date include implementing innovations in the RI and FS process as well as effective use of Removal Actions to begin the actual site remediation. Also, forging close working relationships with the Federal and State Regulators, citizens action groups and the Fernald Citizens Task Force has helped move the program forward. The Fernald successes have been achieved by close coordination and cooperation among all groups working on the projects and by application of innovative technologies within the decision making process.
Date: January 30, 1995
Creator: Craig, J. R. Jr.; Saric, J. A.; Schneider, T. & Yates, M. K.
Object Type: Report
System: The UNT Digital Library
Project W-236A, work plan for preparation of a design requirements document (open access)

Project W-236A, work plan for preparation of a design requirements document

This work plan outlines the tasks necessary, and defines the organizational responsibilities for preparing a Design Requirements Document (DRD) for project W-236A, Multi-Function Waste Tank Facility (MWTF). A DRD is a Systems Engineering document which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This system element is usually assigned to a specific project, in this case the MWTF. The DRD is the document that connects the TWRS program requirements with the highest level projects requirements and provides the project`s link to the overall TWRS mission. The MWTF DRD effort is somewhat unique in that the project is already in detailed design, whereas a DRO is normally prepared prior to preliminary design. The MWTF design effort was initiated with a Functional Design Criteria (FDC) and a Supplemental Design Requirements Document (SDRD) bounding the high level requirements. Another unique aspect of this effort is that some of the TWRS program requirements are still in development. Because of these unique aspects of the MWTF DRD development, the MWTF will be developed from existing TWRS Program requirements and project specific requirements contained in the FDC and SDRD. The following list describes the …
Date: January 30, 1995
Creator: Groth, B. D.
Object Type: Report
System: The UNT Digital Library
Celebrating success at Fernald (open access)

Celebrating success at Fernald

Restoration of the Fernald Environmental Management Project is now moving from the environmental investigation stage to real, tangible remediation progress. Using a variety of programmatic innovations, DOE and FERMCO continue to strengthen an effective partnership that supports a mutually-developed mission of safe, least-cost, earliest final remediation of the Fernald Site while complying with all applicable DOE Orders, regulatory requirements and commitments and addressing the concerns of the many stakeholders who have an interest in how remediation at Fernald progresses. The progress that is occurring at Fernald is testimony to a productive DOE/FERMCO partnership that will continue to be an essential part of the difficult environmental restoration task at this site.
Date: January 30, 1995
Creator: Ofte, D.; Baublitz, J. E.; Chaney, K. & Hansen, R.
Object Type: Article
System: The UNT Digital Library
Interface control document between Analytical Services and Solid Waste Disposal Division (open access)

Interface control document between Analytical Services and Solid Waste Disposal Division

This interface control document (ICD) between Analytical Services and Solid Waste Disposal (SWD) establishes a baseline description of the support needed and the wastes that will require management as part of the interface between the two divisions. It is important that each division has a clear understanding of the other division`s expectations regarding levels and type of support needed. This ICD deals with the waste sampling support needed by SWD and the waste generated by the specified analytical laboratories. The baseline description of wastes includes waste volumes, characteristics and shipping schedules, which will be used to plan the proper support requirements. The laboratories included in this document are 222-S Laboratory Facility, the Waste Sampling and Characterization Facility (WSCF) and the Chemical Engineering Laboratory. These three facilities provide support to the entire site and are not associated with one major program/facility. The laboratories associated with major facilities or programs such as Engineering/Environmental Development Laboratory at K Basins Operation are not within the scope of this document.
Date: January 30, 1995
Creator: Venetz, T. J.
Object Type: Report
System: The UNT Digital Library
Enraf Series 854 advanced technology gauge (ATG) acceptance test procedure. Revision 2 (open access)

Enraf Series 854 advanced technology gauge (ATG) acceptance test procedure. Revision 2

This procedure checks that the shipment of the gauge to Hanford did not cause a failure. This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer`s instructions and specifications and is properly setup prior to being delivered to the tank farm area. Enraf-Nonius Series 854 level gauges are certified by Factory Mutual (FM) for National Fire Protectional Association (NFPA 70) hazardous Class 1, Division 1, Groups B, C, and D Locations. Its measuring principle is based on the detection of variations in the weight of a displacer suspended in the process fluid. The displacer is connected to a wire wounded on a precision measuring drum. A level change causes a change in the weight of the displacer which will be detected by the force transducer. Electronics within the gauge cause a servo motor to adjust the position of the displacer and compute the tank level based on the new position of the displacer drum. The gauge displays the level in decimal inches. An analog output signal transmits the level data for remote data processing.
Date: January 30, 1995
Creator: Barnes, G. A.
Object Type: Report
System: The UNT Digital Library
Conceptual Decontamination and Decommissioning Plan for the Waste Isolation Pilot Plant (open access)

Conceptual Decontamination and Decommissioning Plan for the Waste Isolation Pilot Plant

The Conceptual Decontamination and Decommissioning Plan (D&D) was developed as a concept for progressing from the final actions of the Disposal Phase, through the Decontamination and Decommissioning Phase, and into the initiation of the Long-Term Monitoring Phase. This plan was written in a manner that coincides with many of the requirements specified in DOE Order 5820.2A. Radioactive Waste Management; ASTM El 167 87, Standard Guide for Radiation Protection Program for Decommissioning Operations; and other documents listed in Attachment 3 of the D&D Plan. However, this conceptual plan does not meet all of the requirements necessary for a Decontamination and Decommissioning plan necessary for submission to the U.S. Congress in accordance with the Land Withdrawal Act (P.L. 102-579). A complete D&D plan that will meet the requirements of all of these documents and of the Land Withdrawal Act will be prepared and submitted to Congress by October 1997.
Date: January 30, 1995
Creator: Westinghouse Electric Corporation Waste Isolation Division, now Washington TRU Solutions LLC
Object Type: Report
System: The UNT Digital Library
Forest Service Timber Sale Practices and Procedures: Analysis of Alternative Systems (open access)

Forest Service Timber Sale Practices and Procedures: Analysis of Alternative Systems

None
Date: October 30, 1995
Creator: Gorte, Ross W.
Object Type: Report
System: The UNT Digital Library
Technical Data Catalog: Yucca Mountain Site Characterization Project. Quarterly supplement (open access)

Technical Data Catalog: Yucca Mountain Site Characterization Project. Quarterly supplement

This report presents reference information contained in the Yucca Mountain Project Automated Technical Data Tracking System. The Department of Energy is seeking to design and maintain a geologic repository for the disposal of high-level radioactive wastes. However, before this repository can be built, the DOE must first do a comprehensive site evaluation. This evaluation is subject to many regulations. This report fulfills the reporting requirements of the Site-Specific Procedural Agreement for Geologic Repository to develop and maintain a catalog of data which will be updated and provided to the Nuclear Regulatory Commission on a quarterly basis. This catalog contains: description of data; time, place, and method of acquisition; and where data may be examined.
Date: June 30, 1995
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Degradation mode survey of titanium-base alloys (open access)

Degradation mode survey of titanium-base alloys

Of the materials reviewed, commercially pure titanium, Ti Gr 2, is the most susceptible to crevice corrosion. Ti Gr 7, 12, and 16 are likely to be resistant to crevice corrosion under the current expected Yucca Mountain repository conditions. Although Grade 7 has the greatest resistance to crevice corrosion it is also the most expensive. Although the possibility of sustained loads cracking exists, it has not yet been observed in a Ti alloys. For hydride precipitation to occur 100{degrees}C, the hydrogen concentration would need to be relatively high, much higher than the maximum amount of hydrogen allowed during the manufacture of ({alpha} Ti alloys (0.0 15 wt%). A large amount of (SCC) stress corrosion cracking data accumulated at SNL and BNL for the WIPP program and by the Canadian Waste Management Program on titanium grades 2 and 12 indicates that there is no SCC at naturally occurring potentials in various brines. Hydride-induced cracking of titanium is a possibility and therefore, further investigation of this phenomenon under credible repository conditions is warranted. One disadvantage of titanium and its alloys is that their strengths decrease rather rapidly with temperature. This is due to the strong temperature dependence of interstitial solute strengthening mechanisms. …
Date: January 30, 1995
Creator: Gdowski, G. E. & Ahluwalia, H. S.
Object Type: Report
System: The UNT Digital Library
Acceptance Test Procedure: SY101 air pallet system (open access)

Acceptance Test Procedure: SY101 air pallet system

The purpose of this test procedure is to verify that the system(s) procured to load the SY-101 Mitigation Test Pump package fulfills its functional requirements. It will also help determine the man dose expected due to handling of the package during the actual event. The scope of this procedure focuses on the ability of the air pallets and container saddles to carry the container package from the new 100 foot concrete pad into 2403-WD where it will be stored awaiting final disposition. This test attempts to simulate the actual event of depositing the SY-101 hydrogen mitigation test pump into the 2403-WD building. However, at the time of testing road modifications required to drive the 100 ton trailer into CWC were not performed. Therefore a flatbed trailer will be use to transport the container to CWC. The time required to off load the container from the 100 ton trailer will be recorded for man dose evaluation on location. The cranes used for this test will also be different than the actual event. This is not considered to be an issue due to minimal effects on man dose.
Date: May 30, 1995
Creator: Koons, B.M.
Object Type: Report
System: The UNT Digital Library
Tank 241-C-106 process test report (open access)

Tank 241-C-106 process test report

This report evaluates the thermal hydraulic behavior of tank C-106 during and following the process test conducted from March 10, 1994 to June 15, 1994. During and following the process test the thermocouples on the thermocouple tree in riser No. 14 began to indicate significantly higher temperatures in the sludge than the low temperatures typically observed at this location. The thermocouples on the thermocouple tree in riser No. 8 during this same time period indicated temperature variations consistent with normal seasonal effects. This report summarizes the analyses conducted to understand the phenomena that caused the temperature history at riser No. 14.
Date: May 30, 1995
Creator: Bander, T. J.
Object Type: Report
System: The UNT Digital Library
Toward improving the representation of anvil cirrus effects in GCMs (open access)

Toward improving the representation of anvil cirrus effects in GCMs

None
Date: April 30, 1995
Creator: Chin, H. N. S. & Bradley, M. M.
Object Type: Report
System: The UNT Digital Library
Novel carbon-ion fuel cells. Second quarter 1995 technical progress report, April 1995--June 1995 (open access)

Novel carbon-ion fuel cells. Second quarter 1995 technical progress report, April 1995--June 1995

Research continued on carbon-ion fuel cells. This period, the project is proceeding with the construction of an apparatus to create a solid electrolyte in the form of castings, or highly pressed and sintered pellets of CeC{sub 2} and LaC{sub 2} and to test the castings or pellets for the ionic conduction of carbon-ions across the electrolyte.
Date: June 30, 1995
Creator: LaViers, H.
Object Type: Report
System: The UNT Digital Library
60-day safety screen results and final report for tank 241-C-111, auger samples 95-Aug-002, 95-Aug-003, 95-Aug-016, and 95-Aug-017 (open access)

60-day safety screen results and final report for tank 241-C-111, auger samples 95-Aug-002, 95-Aug-003, 95-Aug-016, and 95-Aug-017

This report presents the details of the auger sampling events for underground waste tank C-111. The samples were shipped to the 222-S laboratories were they underwent safety screening analysis and primary ferricyanide analysis. The samples were analyzed for alpha total, total organic carbon, cyanide, Ni, moisture, and temperature differentials. The results of this analysis are presented in this document.
Date: May 30, 1995
Creator: Rice, A.D.
Object Type: Report
System: The UNT Digital Library
Environmental Hazards Assessment Program quarterly report, January--March 1995 (open access)

Environmental Hazards Assessment Program quarterly report, January--March 1995

The objectives of the Environmental Hazards Assessment Program (EHAP) stated in the proposal to DOE are to: develop a holistic, national basis for risk assessment, risk management, and risk communication that recognizes the direct impact of environmental hazards on the health and well-being of all; develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects; and identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes activities and reports on progress for the third quarter (January--March) of the third year of the grant. It reports progress against these grant objectives and the Program Implementation Plan published at the end of the first year of the grant. Questions, comments, or requests for further information concerning the activities under this grant can be forwarded to Jack Davis in the EHAP office of the Medical University of South Carolina at (803) 727-6450.
Date: April 30, 1995
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Acceptance test procedure for High Pressure Water Jet System (open access)

Acceptance test procedure for High Pressure Water Jet System

The overall objective of the acceptance test is to demonstrate a combined system. This includes associated tools and equipment necessary to perform cleaning in the 105 K East Basin (KE) for achieving optimum reduction in the level of contamination/dose rate on canisters prior to removal from the KE Basin and subsequent packaging for disposal. Acceptance tests shall include necessary hardware to achieve acceptance of the cleaning phase of canisters. This acceptance test procedure will define the acceptance testing criteria of the high pressure water jet cleaning fixture. The focus of this procedure will be to provide guidelines and instructions to control, evaluate and document the acceptance testing for cleaning effectiveness and method(s) of removing the contaminated surface layer from the canister presently identified in KE Basin. Additionally, the desired result of the acceptance test will be to deliver to K Basins a thoroughly tested and proven system for underwater decontamination and dose reduction. This report discusses the acceptance test procedure for the High Pressure Water Jet.
Date: May 30, 1995
Creator: Crystal, J.B.
Object Type: Report
System: The UNT Digital Library
Radical cutting torch. Technical progress report, January 1, 1995-May 31, 1995 (open access)

Radical cutting torch. Technical progress report, January 1, 1995-May 31, 1995

This report describes the design of a pyrotechnic cutter for use in downhole operations in the petroleum industry. The redesign and pressure tests of nozzle seals are specifically addressed.
Date: June 30, 1995
Creator: Robertson, M.C.
Object Type: Report
System: The UNT Digital Library
U.S. Department of Energy Office of Inspector General report on audit of Department of Energy support service contracting (open access)

U.S. Department of Energy Office of Inspector General report on audit of Department of Energy support service contracting

The purpose of this audit was to review the Department`s acquisition and use of support service contractors and subcontractors. The audit objectives were to determine if the Department (1) paid fees to both support service contractors and subcontractors for services exclusively performed by subcontractors, (2) used support service contractors to perform inherent government functions, and (3) rolled over unearned award fees to subsequent evaluation periods and had adequate management controls to ensure that contractor performance would be evaluated. The Department did not always obtain support services in the most economical and effective manner. The Department negotiated and paid four of six support service contractors an estimated $5.1 million in fees for services exclusively provided by subcontractors because the Department did not have a policy which addressed the inclusion, at the pre-award phase, of subcontract labor in the support service contractors` fee determinations. Furthermore, while the authors found no instances where support service contractors performed inherent government functions, they did note that the Department maintained minimal administration over major portions of contracted-for services on three of six support service contracts. This occurred because contractors subcontracted extensively for support services. Consequently, the Department may have decreased their ability to control cost growth …
Date: June 30, 1995
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Multi-Function Waste Tank Facility Quality Assurance Program Plan, Project W-236A. Revision 2 (open access)

Multi-Function Waste Tank Facility Quality Assurance Program Plan, Project W-236A. Revision 2

This document describes the Quality Assurance (QA) program for the Multi-Function Waste Tank Facility (MWTF) Project. The purpose of this QA program is to control project activities in such a manner as to achieve the mission of the MWTF Project in a safe and reliable manner. The QA program for the MWTF Project is founded on DOE Order 5700.6C, Quality Assurance, and implemented through the use of ASME NQA-1, Quality Assurance Program Requirements for Nuclear Facilities (ASME 1989 with addenda la-1989, lb-1991 and lc-1992). This document describes the program and planned actions which the Westinghouse Hanford Company (WHC) will implement to demonstrate and ensure that the project meets the requirements of DOE Order 5700.6C through the interpretive guidance of ASME NQA-1.
Date: May 30, 1995
Creator: Hall, L. R.
Object Type: Report
System: The UNT Digital Library
Role of char during reburning of nitrogen oxides. Sixth quarterly report, January 1, 1995--March 31, 1995 (open access)

Role of char during reburning of nitrogen oxides. Sixth quarterly report, January 1, 1995--March 31, 1995

The regulations established by the Clean Air Act Amendments of 1990 in the United States mean that a single NO{sub x} control technology is not likely to be sufficient for boilers in the ozone non-attainment areas. Reburning is an emerging three-stage combustion technology designed for the reduction of NO by introducing a small amount of reburning fuel above the primary flame where the majority of NO is chemically reduced to nitrogen. While coal, in general, has not been considered an effective reburning fuel, our recent research suggested that lignite has a reburning efficiency even higher than that of methane. The objectives of this research are to investigate (1) the relative importance of heterogeneous and homogeneous phase reactions, and (2) the role of CaO in the catalysis of char gasification by NO in reburning environment. Experiments have been performed with a flow reactor with a simulated flue gas at a stoichiometric ratio (SR). Reburning fuels in this study include methane, Pittsburgh No. 8 bituminous coal, Mississippi lignite, North Dakota lignite, chars derived from the coal and lignites, and the bituminous coal char impregnated with Can. Chars were produced in N{sub 2} by suspending a sample basket in a 3{double_prime} tube furnace. …
Date: April 30, 1995
Creator: Chen, W. Y.; Ma, L. & Fan, L. T.
Object Type: Report
System: The UNT Digital Library
SCOPING EVALUATION TO EXPLORE-ROCK FALL FINITE-ELEMENT ANALYSIS AND ANALYTICAL EVALUATONS ON INTERLOCKING BASKET WASTE PACKAGES (open access)

SCOPING EVALUATION TO EXPLORE-ROCK FALL FINITE-ELEMENT ANALYSIS AND ANALYTICAL EVALUATONS ON INTERLOCKING BASKET WASTE PACKAGES

None
Date: November 30, 1995
Creator: Ceylan, Z.
Object Type: Report
System: The UNT Digital Library