FY 1992 task plans for the Hanford Environmental Dose Reconstruction Project (open access)

FY 1992 task plans for the Hanford Environmental Dose Reconstruction Project

Phase 1 of the HEDR Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations from limited radionuclides, in a limited geographical area and time period. Phase 1 ended in FY 1990. In February 1991, the TSP decided to shift the project planning approach away from phases--which were centered around completion of major portions of technical activities--to individual fiscal years (FYs), which span October of one year through September of the next. Therefore, activities that were previously designated to occur in phases are now designated in an integrated schedule to occur in one or more of the next fiscal years into FY 1995. Task plans are updated every 6 months. In FY 1992, scientists will continue to improve Phase 1 data and models to calculate more accurate and precise dose estimates. The plan for FY 1992 has been prepared based …
Date: October 1, 1991
Creator: unknown
System: The UNT Digital Library
Savannah River Site`S Site Specific Plan. Environmental Restoration and Waste Management, Fiscal Year 1992 (open access)

Savannah River Site`S Site Specific Plan. Environmental Restoration and Waste Management, Fiscal Year 1992

This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.
Date: August 1, 1991
Creator: unknown
System: The UNT Digital Library
Fiscal Year 1992 Annual Operating Plan for the Geopressured-Geothermal Research Program ($4.3 Million Budget) (open access)

Fiscal Year 1992 Annual Operating Plan for the Geopressured-Geothermal Research Program ($4.3 Million Budget)

This plan describes the Geopressured-Geothermal Research Program. A Geopressured well in Texas (Pleasant Bayou) will undergo a slow test and a pressure buildup test. A geopressured well in Louisiana (Gladys McCall) will be flow tested for a short period, logged, plugged and abandoned or turned over to industry early in FY 92. A second deep geopressured well in Louisiana, the Hulin Well, is being kept on standby. Related university research in geology, numerical reservoir modeling, subsidence, microseismicity, and water quality will continue, with program data reviews initiated in appropriate areas. Increased emphasis on integrated reservoir engineering will be implemented. The well activities coupled with the related university research are designed to improve the ability to forecast reservoir productive capacity, to verify the reliability of the resource as a long-term energy resource, and to determine the environmental effects of long-term production. By these means, the Geopressured-Geothermal Research Program is developing a solid technology base that private industry can use to evaluate the geopressured-geothermal resource. The Industrial Consortium for utilization of the resource will be continued. Use projects in Louisiana and Texas will be evaluated. A geopressured reservoir review will be managed by INEL. The DOE Field Office, Idaho will make preparations …
Date: August 1, 1991
Creator: unknown
System: The UNT Digital Library
Geothermal Energy Program: Multiyear Plan, FY 1992-1997 (open access)

Geothermal Energy Program: Multiyear Plan, FY 1992-1997

None
Date: June 27, 1991
Creator: unknown
System: The UNT Digital Library