Yakima River Species Interactions Studies Annual Report: 1992 (open access)

Yakima River Species Interactions Studies Annual Report: 1992

The Yakima Species Interactions Study (YSIS) was begun in September of 1989 to investigate species interactions among fish in response to proposed supplementation of salmon and steelhead in the Yakima Basin. Supplementation is defined as ''the use of artificial propagation in the attempt to maintain or increase natural production while maintaining the long term fitness of the target population, and keeping the ecological and genetic impacts on non-target populations within specified biological limits'' (BPA summary report series, 1992). Target populations are the populations of fish that will be supplemented and non-target populations are all other populations of fish. One of the goals of the proposed Yakima Fisheries Project (YFP) is to test the strategy of supplementation in the Yakima Basin. In a review of published literature and unpublished projects about supplementation, Miller et al. (1990) concluded ''Adverse impacts to wild stocks have been shown or postulated for about every type of hatchery fish introduction where the intent was to rebuild runs''. In Steward and Bjornn's (1990) review of the published literature, they stated that ''Genetic and ecological effects, and changes in productivity of the native stocks that can result from supplementation remain largely unmeasured''. Uncertainties about the effects supplementation in …
Date: August 1993
Creator: Pearsons, Todd N.
System: The UNT Digital Library
Savannah River Site`S Site Specific Plan. Environmental Restoration and Waste Management, Fiscal Year 1992 (open access)

Savannah River Site`S Site Specific Plan. Environmental Restoration and Waste Management, Fiscal Year 1992

This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.
Date: August 1, 1991
Creator: unknown
System: The UNT Digital Library
Fiscal Year 1992 Annual Operating Plan for the Geopressured-Geothermal Research Program ($4.3 Million Budget) (open access)

Fiscal Year 1992 Annual Operating Plan for the Geopressured-Geothermal Research Program ($4.3 Million Budget)

This plan describes the Geopressured-Geothermal Research Program. A Geopressured well in Texas (Pleasant Bayou) will undergo a slow test and a pressure buildup test. A geopressured well in Louisiana (Gladys McCall) will be flow tested for a short period, logged, plugged and abandoned or turned over to industry early in FY 92. A second deep geopressured well in Louisiana, the Hulin Well, is being kept on standby. Related university research in geology, numerical reservoir modeling, subsidence, microseismicity, and water quality will continue, with program data reviews initiated in appropriate areas. Increased emphasis on integrated reservoir engineering will be implemented. The well activities coupled with the related university research are designed to improve the ability to forecast reservoir productive capacity, to verify the reliability of the resource as a long-term energy resource, and to determine the environmental effects of long-term production. By these means, the Geopressured-Geothermal Research Program is developing a solid technology base that private industry can use to evaluate the geopressured-geothermal resource. The Industrial Consortium for utilization of the resource will be continued. Use projects in Louisiana and Texas will be evaluated. A geopressured reservoir review will be managed by INEL. The DOE Field Office, Idaho will make preparations …
Date: August 1, 1991
Creator: unknown
System: The UNT Digital Library
Railroad Commission of Texas Oil and Gas Division Annual Report: 1992, Volume 2 (open access)

Railroad Commission of Texas Oil and Gas Division Annual Report: 1992, Volume 2

Second part of an annual report from the Texas Railroad Commission's Oil and Gas Division providing information and data, organized by district, related to gas well gas production and hydrocarbon liquids recovered on leases.
Date: August 1993
Creator: Railroad Commission of Texas. Oil and Gas Division.
System: The Portal to Texas History
Railroad Commission of Texas Oil and Gas Division Annual Report: 1992, Volume 1 (open access)

Railroad Commission of Texas Oil and Gas Division Annual Report: 1992, Volume 1

First part of an annual report of the Texas Railroad Commission's Oil and Gas Division providing background on the industry and the agency's activities, information related to the production of oil and gas, and data regarding production by field.
Date: August 31, 1993
Creator: Railroad Commission of Texas. Oil and Gas Division.
System: The Portal to Texas History