Field Demonstration of Two Pneumatic Backfilling Technologies (open access)

Field Demonstration of Two Pneumatic Backfilling Technologies

Abstract: This U.S. Bureau of Mines (USBM) report summarizes a field demonstration of pneumatic backfiling technologies conducted at the abandoned Hillside Coal and Iron Slope in Vandling, PA. Researchers demonstrated tro pneumatic backfilling technologies recently developed under the USBM's Abandoned Mine Reclamation Research Program, the Pneumatic Pipefeeder and the High-Efficiency Ejector. Both systems had previously been evaluated at the USBM's subsidence abatement investigation laboratory near Fairchance, PA. The objective of the demonstration was to fill 100% of the abandoned tunnel with backfill stone to prevent further subsidence. The Pneumatic Pipefeeder was used for 21 days, at a rate of 63 to 124 t/d (69 to 136 st/d), to fill 88% of the tunnel. The High-Efficiency Ejector was used for 2 days, at a rate of 125 to 132 t/d (138 to 146 st/d) to fill the remaining 12% of the tunnel. The backfill placed by both systems was tightly compacted. The major problem encountered was wear on the polyethylene pipeline from the abrasion of the high-velocity backfill. The use of heavier steel pipe minimized the problem. A cost analysis for the entire project is given.
Date: 1995
Creator: Dyni, Robert C.; Burnett, Mackenzie & Philbin, David
System: The UNT Digital Library