Intermediate Heat Exchanger Preliminary Design. Vol. 1, IHX Preliminary Design (open access)

Intermediate Heat Exchanger Preliminary Design. Vol. 1, IHX Preliminary Design

Preface: The intermediate heat exchanger is designed for operation in a nuclear power plant using liquid sodium as the primary and secondary coolant. Since the primary fluid coming from the reactor is radioactive, the purpose of the IHX is to transfer heat to a nonradioactive fluid which then goes to a steam generator. Because of this activity the until will be enclosed in a concrete pit and will not be accessible during periods of operation. Immediately after shut down it will be necessary to allow time for radioactive decay before the unit will be accessible to personnel. Because of inaccessibility and possible long periods allowed for decay time, it is imperative that the unit give trouble free operation. During periods of shut down, the internals should have easy access for inspection and repair if necessary so that down time is held to a minimum. The general arrangement of the heat exchanger described in this report presents a conventional design utilizing known materials and existing methods of fabrication. In further consideration of all concepts, designs and analyses developed during this period of the program, it is felt that this preliminary design will provide an intermediate sodium heat exchanger of lower cost …
Date: February 28, 1959
Creator: Alco Products (Firm)
System: The UNT Digital Library
Control and Dynamics Performance of a Sodium Cooled Reactor Power System (open access)

Control and Dynamics Performance of a Sodium Cooled Reactor Power System

Introduction: Objectives and Method of Approach. High plant efficiencies can be realized without excessively high core temperatures and high coolant pressures by the use of liquid metal coolant. In an attempt to prove the feasibility of liquid sodium as a reactor coolant ALCO Products, Inc., under sponsorship of the Atomic Energy Commission, is undertaking a design study of three vital system components: the intermediate exchanger, the boiler, and the superheater. Since, in the past programs, the nuclear reactor had been the major focus of attention, the development of the sodium cooled reactor and sodium pumps for this application are thought to need the less development than the heat exchanger equipment. Consequently, parallel design studies of the reactor, pumps, and other system components have not yet been initiated.
Date: 1960
Creator: Alco Products (Firm).
System: The UNT Digital Library
Evaluation of Kanigen, Electroless Nickel Plating for Steam Side of a Sodium Component Steam Generator (open access)

Evaluation of Kanigen, Electroless Nickel Plating for Steam Side of a Sodium Component Steam Generator

Introduction: This is a final report on the evaluation of Kanigen electroless nickel plating for surfaces in contact with water and steam i a sodium heated AISI Type 316 stainless steel steam generator. The purpose of the coasting was to afford protection from stress corrosion cracking originating on the water-steam side of the unit. It has been concluded that the kanigen coating does not afford adequate protection for the services condition intended. This work was performed as part of the research and development program for the United States Atomic Energy Commission sodium Components Design Project.
Date: February 15, 1961
Creator: Alco Products (Firm).
System: The UNT Digital Library
Intermediate Heat Exchanger and Steam Generator Final Design. Volume 1. Thermal & Mechanical Design (open access)

Intermediate Heat Exchanger and Steam Generator Final Design. Volume 1. Thermal & Mechanical Design

This technical report represents the final design for a sodium to sodium intermediate heat exchanger and a sodium to water steam generator. The intermediate heat exchanger is designed for operation in a nuclear power plant using liquid sodium as the primary and secondary coolant. Since the primary fluid coming fro the reactor is radioactive, the purpose of the IHX is to transfer heat to a nonradioactive fluid which then goes to the steam generator. Because of radioactivity the unit will be enclosed in a concrete pit and will not be accessible during periods of operation. Immediately after shutdown it will be necessary to allow time for radioactive decay before the unit will be accessible to personnel. Because of inaccessibility and possible long periods allowed for decay time, it is imperative that the unit give trouble free operation. During periods of shutdown, the internals should have easy access for inspection and repair if necessary so that down time is held to a minimum. The steam generator is designed to generate superheated steam using liquid sodium from the intermediate heat exchanger as the heat source. Its basic design is a shell and tube unit made up of three difference sections: (1) a …
Date: September 30, 1960
Creator: Alco Products (Firm).
System: The UNT Digital Library
Intermediate Heat Exchanger and Steam Generator Final Design. Volume 2. Chemical & Stress Analysis (open access)

Intermediate Heat Exchanger and Steam Generator Final Design. Volume 2. Chemical & Stress Analysis

Introduction: This volume deals principally with the chemical analysis and the stress analysis for a sodium to sodium intermediate heat exchanger and a sodium to water steam generator. The work presented is an extension and modification of the analysis presented in the preliminary design report. The chemical analysis covers the sodium cover gas system and the effects of sodium-water reactions in the event of a leak in the steam generator. Considerable design work was done in an effort to maintain the integrity of the steam generator vessel under maximum leak conditions. The method of sizing relief valves for each unit under varying leak rates is presented in this text and operation of the unit for the various leak rates is resented in the Operation and Maintenance volume. The stress analysis section covers those thermal transients which would be physically possible with this intermediate heat exchanger and steam generator design. Attention has been given to methods of operation which would minimize the magnitude and frequency of thermal shocks. Certain areas have been studied in detail where thermal stresses appear high. This report also includes a structural design basis for handling stress analysis of combined mechanical, hydrostatic and thermal stresses and conditions …
Date: September 30, 1960
Creator: Alco Products (Firm).
System: The UNT Digital Library
Intermediate Heat Exchanger and Steam Generator Final Design. Volume 3. Specifications (open access)

Intermediate Heat Exchanger and Steam Generator Final Design. Volume 3. Specifications

Introduction: Sodium Components Material Specifications. Twenty-three material, inspection and welding specification are presented for the various parts of both the intermediate heat exchanger and steam generator. Tables indicate the applicable parts and assemblies to which these specifications shall apply. For other parts, where the material requirements are not severe, the ASTM or other indicated specifications shall apply.
Date: September 30, 1960
Creator: Alco Products (Firm).
System: The UNT Digital Library
Intermediate Heat Exchanger and Steam Generator Final Design. Volume 4. Operation & Maintenance (open access)

Intermediate Heat Exchanger and Steam Generator Final Design. Volume 4. Operation & Maintenance

This technical report contains the operation and maintenance specifications for the intermediate heat exchanger and the steam generator. The report contains eight sections: (1) General Information, (2) Shipping and Installation, (3) Operation Procedures, (4) Scram and Casualty Shutdowns, (5) Leaks, (6) Instrumentation and Control, (7) Maintenance, and (8) four Appendixes (a) Boiler Water Chemistry Recommendations, (b) Final Concept Drawings, (c) Industrial Nucleonics Literature on Liquid Level Detector, and (d) Sodium Purity Control Recommendations.
Date: September 30, 1960
Creator: Alco Products (Firm).
System: The UNT Digital Library
Scale "Up or Down" Analysis for Prototype Test (open access)

Scale "Up or Down" Analysis for Prototype Test

Introduction: In conjunction with the final design and development of a 70 MW sodium intermediate heat exchanger and a sodium steam generator, an analysis is required which can be used as a basis for a determination to scale up or scale down the designs. Included in this analysis are those considerations leading to the recommendation of the best prototype test unit and to some of the limits imposed on scaling up or down when considering future applications of designs other than those actually tested. In addition, these considerations include aspects required to accurately predict the performance, operation, mechanical reliability, and feasibility of fabrication of the 70 MW design.
Date: May 1, 1960
Creator: Alco Products (Firm).
System: The UNT Digital Library
Test Program for 30 Megawatt Prototype Sodium Intermediate Heat Exchanger and Steam Generator (open access)

Test Program for 30 Megawatt Prototype Sodium Intermediate Heat Exchanger and Steam Generator

The designer's concept of a test program for the 30-Mw prototype intermediate heat exchanger and steam generator designed and fabricated as part of the Sodium Components Development Program is presented. The performance data will serve to verify the thermal design, or allow application of improved techniques to future designs, give an improved basis for stress analysis in design of future units, and demonstrate the capability and limitations of the units in relation to the performance specifications for which they were designed. Welding techniques for type 316 stainless steel are described. The specifications and operating conditions of the units are given along with instrumentation drawings showing test equipment design and arrangement.
Date: September 14, 1962
Creator: Alco Products (Firm).
System: The UNT Digital Library
Tube-To-Tubesheet Welding Development Programs to 30 Megawatt Prototype Sodium Intermediate heat Exchanger and Steam Generator (open access)

Tube-To-Tubesheet Welding Development Programs to 30 Megawatt Prototype Sodium Intermediate heat Exchanger and Steam Generator

Special welding techniques for joining Inconel weld overlays on type 316 stainless steel tubesheets and channels are described. The program for the development of the required welding procedures are divided into three specific programs: overlaying Inconel filler Metal 82 on type 316 stainless steel, welding type 316 stainless steel tubes to a type 316 stainless steel tubesheet, and welding Inconel-type 316 stainless steel composite tubes to Inconel weld overlaid type 316 tubesheets. Shock tests are described which attempt to assimilate the most drastic thermal transient that could occur in both units and to evaluate the effect of the resulting stresses on the Inconel overlay and the tube-to-tubesheet welds. (N.W.R.)
Date: 1963
Creator: Alco Products (Firm).
System: The UNT Digital Library
SM-1 Research and Development Program: Long-lived Induced Activity Buildup During SM-1 Core I Lifetime. Task XVIII, Phase I (open access)

SM-1 Research and Development Program: Long-lived Induced Activity Buildup During SM-1 Core I Lifetime. Task XVIII, Phase I

Abstract: The results of activity buildup studies in the SM-1 performed during Core I lifetime (June 3, 1957 to April 28, 1960) are reported. Data are presented on the extent, nature, and mechanism of the buildup of long-lived gamma emitting nuclides in the reactor primary system. Radiation levels after reactor shutdown are presented, as well as mathematical equations used to account for the observed activity levels. The data have shown that Co60 is the major contributor to radiation levels in the SM-1. Co60 activity arises from the cobalt in Haynes 25 alloy flux suppressors, and the cobalt impurity in stainless steel. After 35 months operation at an average power level of 55%, deposited Co60 activity accounted for approximately 83% of the total radiation level (mr/hr) contributed by the long-lived gamma emitting nuclides. The contribution of the primary coolant activity to the total radiation level is insignificant when compared to the contribution of the activity deposited on the walls of the system. The radiation level on the super-heater side of the steam generator was about 1400 mr/hr after 35 months of reactor operation. The percentages of Co60 activity in the coolant and in the deposits were not the same. This indicates …
Date: November 30, 1960
Creator: Bergmann, C. A.; Bergen, C.; Cox, J. F.; Chupak, J. & Grant, L. G.
System: The UNT Digital Library
Interim Report of Nuclear Analysis Performed on SM-2 Core and Vessel : September 1, 1958 to December 31, 1959. (open access)

Interim Report of Nuclear Analysis Performed on SM-2 Core and Vessel : September 1, 1958 to December 31, 1959.

Abstract: This technical report contains a description of the nuclear analysis performed upon the SM-2 core and vessel for the period September 1, 1958 to December 31, 1959. Calculations are given for core reactivity, power distributions, lifetime, reactor control, kinetics, radiation problems, fuel and poison burn-ups, and the nuclear effects of poisons, temperature, and geometry. Wherever possible, experimental data is included in order to test the validity of the analytical models. The SM-2 nuclear analysis was performed by Alco Products, in. under Tasks 1, 8, and 10 of Contract No. AT(30-2)-326 for the Atomic Energy Commission.
Date: May 27, 1960
Creator: Bobe, P. E.; Birken, S. H.; Byrne, B. J.; Clancy, E. F. & Fried, B. E.
System: The UNT Digital Library
Investigation of Local Boiling of SM-1 (open access)

Investigation of Local Boiling of SM-1

Abstract; SM-1 Reactor Core I Rearranged and Spiked, and Core II with Special Components were analyzed under various off-design conditions to induce nucleate boiling. The steady state code, STDY-3, written for the thermal analysis of pressurized water cores, was employed for the analysis. The code performs a complete steady state parallel channel thermal analysis for both nominal and hot channels. Thermal characteristics of individual elements were investigated while changing the parameters of primary pressure or inlet temperature to introduce the phenomenon of nucleate boiling in the the core. Reduction of system pressures to 1000, 800, and 600 psia and increasing core inlet temperatures to 465 and 500 degree F were studied as the means to induce boiling in the core. This analysis indicates that SM-1 Core I Rearranged and Spiked can be safely operated at the reduced pressure of 910 psia without introducing extensive boiling in the core. SM-1 Core II with Special Components can be operated at 800 psia or at an inlet temperature of 500 degree F at 1200 psia.
Date: June 20, 1961
Creator: Bradley, P. L.
System: The UNT Digital Library
Hazards Report for SM-1 Core Temperature and Flow Instrumentation (Task XIV) Covering Special Test Procedures. (open access)

Hazards Report for SM-1 Core Temperature and Flow Instrumentation (Task XIV) Covering Special Test Procedures.

Abstract: Test procedures for special tests involving in-core SM-1 temperature and flow instrumentation are described (Task XIV Package Tests). These tests involve in-core steady state flow and temperature measurements, loss of flow transients, load transients, reduced primary system pressure operations and reduced element flow. The thermal and hydraulic conditions prevailing in these tests, including steady state and transient burnout rations, are developed. The effects of reduced system pressure and flow on the burnout ratios are determined as are the expected stuck rod conditions when Task XIV test elements are installed. The effect on the maximum credible accident is included and a recommendation to conduct these Task XIV package tests is made.
Date: February 28, 1962
Creator: Bradley, P. L. & Coombe, J. R.
System: The UNT Digital Library
Plant Transient Analysis of the APPR-1 by Analog Computer Methods ; Task No. IV (open access)

Plant Transient Analysis of the APPR-1 by Analog Computer Methods ; Task No. IV

Phase I - Plant Transient Analysis. Behavior of the basic and refined kinetic models differs only slightly. It is therefore suggested that the basic model be used in any studies where the improvement in fidelity attainable fro the refined model is not warranted by the complexities introduced by the addition of function generator to the analog circuitry and derivation of the function to be programmed. The parameter responses of both kinetic models appear to be essentially similar to those of the plant with the exception of the primary pressure. In the pressurizer analysis it was noted that the primary system pressure surges of the model should be higher than those of the plant because of the adiabatic steam compression assumed in the model derivation. the fact that the mode surge is very much greater indicates that the compression process is far from adiabatic. A more detailed and complex model of the pressurizer, one that evaluates heat transfer in the steam pocket boundaries, would therefore reduce the costly conservatism otherwise necessary in the specification of pressurizer vessel size. Phase II - Xenon Reactivity Transients. On the basis of this study an analog computer circuit has been presented which accurately represents bank …
Date: October 1, 1958
Creator: Brondel, J. O. & Tomonto, J. R.
System: The UNT Digital Library
SM-1 (APPR-1) Research and Development Program : Final Report on Short-Lived and Fission Product Activity in the SM-1 Primary Coolant, Task III (open access)

SM-1 (APPR-1) Research and Development Program : Final Report on Short-Lived and Fission Product Activity in the SM-1 Primary Coolant, Task III

Abstract: The primary coolant of the SM-1 (APPR-1) was analyzed for short-lived and fission product activities. Manganese-56 was found to be the predominant non-fission product nuclide contributing to the short lived activity. Fission products were found in the coolant. It is concluded these fission products originate from a defects in the cladding and from surface contamination of the fuel elements.
Date: March 10, 1959
Creator: Brown, William S. & Hasse, Robert A.
System: The UNT Digital Library
SM-1 Research and Development Program, Activity Buildup Program Task 1 : final report February 1958 to June 1959 (open access)

SM-1 Research and Development Program, Activity Buildup Program Task 1 : final report February 1958 to June 1959

Abstract: The results of activity buildup studies in the SM-1 (APPR-1) performed from February 1958 to January 1959 are reported. Data are presented on the extent, nature, and mechanism of the buildup of long-lived gamma emitting nuclides in the reactor primary system. Mathematical equations to describe the activity buildup are derived. Radiation levels after reactor shutdown are presented, as well as the predicted radiation levels at the end of core life.
Date: August 10, 1959
Creator: Brown, William S.; Bergen, C. Richard.; Bergmann, Carl A.; Chupak, Julius.; Fitzsimmons, Susanne R. & Grant, Louis G.
System: The UNT Digital Library
Analysis of Extended Zero Power Experiments on the Army Package Power Reactor : ZPE-2 (open access)

Analysis of Extended Zero Power Experiments on the Army Package Power Reactor : ZPE-2

Introduction: This report is principally concerned with analysis of measurements taken on the APPR-1 core during the course of the extended Zero Power Experiments (ZPE-2). The bulk of these measurements are reported in APAE No. 21. There are some additional measurements reported in APAE Memo 115. In addition to the analysis of the ZPE-2 data some re-evaluation has been made of a few of the results obtained from the first set of Zero Power Experiments (ZPE-1). The ZPE-1 measurements are reported in APAE No. 8. During the course of analysis work it became apparent that a considerable amount of basic experimental data had been taken on the APPR-1 core. It seemed worthwhile to organize this report in such a fashion that other investigators could make maximum use of this data. It provides excellent opportunity for individuals and groups interested in basic reactor reactor analysis problems to check calculational techniques. An attempt has been made to include all of the fundamental information concerning the material content and geometry of the APPR-1. This material is in included in the Appendices. In addition, cross-section files and group constants have been listed rather extensively in order that other investigators could compare results presented in …
Date: May 7, 1958
Creator: Byrne, B. J. & Oby, P. V.
System: The UNT Digital Library
SM-2 Full Scale Flow Studies Termination Report (open access)

SM-2 Full Scale Flow Studies Termination Report

Abstract: Hydrodynamic flow studies were conducted on a full scale model of the SM-2 reactor vessel and core. Test fluid was water at 200 psi and 200 degree F. Test facilities, model, and instrumentation design are discussed. Flow distribution in the stationary fuel elements, lattices, and control rods of the second pass was investigated. Pressure losses through the various core components were measured and are compared with calculated values. Observed over-all pressure drop was 71 feet of water at 200 degree F, 31% higher than predicted, part of which was due to presence of instrument leads. Element to element flow distribution varied approximately +-8% from pass average. Channel-to-channel stationary element flow distribution varied approximately +-10% from element average and control rod flow distribution varied from +-8.9% to +-6.4 and -11.6% depending upon rod locations. These variations exceed the original goals of a +-10% and +-12% combined deviation for stationary and control rod elements respectively, but are satisfactory in relation to thermal design. There was no indication of unsatisfactory structural performance of any components under hydrodynamic loadings up to 130% of design values. The test program was terminated after determining flow distribution in the reference core design, omitting any work on …
Date: July 30, 1961
Creator: Christenson, J. A.; Richards, W. M. S. & Davidson, S. L.
System: The UNT Digital Library
Hazards Summary Report for the SM-1 Core Temperature and Flow Instrumentation: Task XIV (open access)

Hazards Summary Report for the SM-1 Core Temperature and Flow Instrumentation: Task XIV

Abstract; This technical report describes the changes in the SM-1 incurred by the experiment, Core Temperature and Flow Instrumentation (Task XIV), and evaluates the possible hazard involved in these changes. Temperature and flow measurements will be taken on a Task XIV instrumented stationary fuel element, instrumented control rod fuel element and other selected points in the SM-1 core to provide data on the core steady state and transient performance. The hazards evaluation consists of a nuclear evaluation, thermal and hydraulic analysis, description of tests to be performed, and discussion of containment integrity and maximum accident considerations.
Date: March 30, 1961
Creator: Coombe, J. R.; Brondel, J. O.; Lee, D. H. & Matthews, F. T.
System: The UNT Digital Library
Hazards Evaluation of the SM-1 Penetrated Gasket (open access)

Hazards Evaluation of the SM-1 Penetrated Gasket

Abstract: This technical report describes the as-constructed SM-1 penetrated gasket designed for SM-1 Core and Flow Instrumentation (Task XIV). This report supplements APAE No. 79, The Summary Hazards Report for Task XIV, and evaluates the effects of a postulated failure of this gasket. The effects of failure on the Maximum Credible Accident are determined and conclusions and recommendations for the use of this gasket are made.
Date: September 8, 1961
Creator: Coombe, J. R.; Gebhardt, F. G. & James, B.
System: The UNT Digital Library
Hazards Report for SM-1 Core II Without the SM-1 Core I High Burnup Elements and With the PM-1-M-2 Element (open access)

Hazards Report for SM-1 Core II Without the SM-1 Core I High Burnup Elements and With the PM-1-M-2 Element

Abstract: The removal of both SM-1 Core I high burnup elements from SM-1 Core II and the insertion of the PM-1-M-2 element and the SM-1 Core I spare element in SM-1 Core II is discussed. Nuclear and thermal characteristics of Core II with these changes are presented and conclusions related to the changes in the hazard potential are made. If the core change indicated by this report is made, local peaking factors will be decreased and burnout ratios will be increased. This, of course, in itself leads to a more conservative estimate of core safety. There is no conceivable reason why the perturbation may not be safely made in the SM-1 Core II.
Date: October 7, 1961
Creator: Coombe, J. R.; Lee, D. H. & Mathews, F. T.
System: The UNT Digital Library
Hazards Report for SM-1 Core II With the SM-1 Core II High Burnup Elements Replaced with SM-1 Core I Spare Elements (open access)

Hazards Report for SM-1 Core II With the SM-1 Core II High Burnup Elements Replaced with SM-1 Core I Spare Elements

Abstract: The removal of both SM-1 Core I high burnup elements from the SM-1 Core II and the insertion of two SM-1 Core I spare elements i their places are discussed. Nuclear and thermal characteristics of Core II with the change are presented and conclusion related to the change in hazard potential are made. If the core change indicated by this report is made, local peaking factors will be decreased and burnout ratios will be increased. This, of course, in itself leads to a more conservative estimate of core safety. There is no conceivable reason why this perturbation may not be safely made in the SM-1 Core II.
Date: October 9, 1961
Creator: Coombe, J. R.; Lee, D. H. & Matthews, F. T.
System: The UNT Digital Library
Hazards Report for Insertion of the PM-1-M-2 Element in the SM-1 Core II (open access)

Hazards Report for Insertion of the PM-1-M-2 Element in the SM-1 Core II

Abstract: This technical report describes the Martin Co. PM-1-M-2 test element and analyzes the potential hazard incurred by its inclusion in the SM-1 Core II. A nuclear analysis develops power distributions and reactivity effects. Hydraulic and thermal analyses develop anticipated burnout heat flux ratios. An evaluation of the risk involved with the inclusion of this element is presented. In view of the narrow margin by which the PM-1-M-2 test element meets the minimum burnout ratios as defined by Alco Products, Inc., it is recommended that if time permits that critical facility design verification be accomplished. The PM-1-M-2 test element meets the minimum requirements for insertion in SM-1 Core II and in view of the importance of this element to the PM-1 and PM-3A program, should be considered for insertion.
Date: September 1, 1961
Creator: Coombe, J. R.; Scoles, J. F.; Brondel, J. O. & Lee, D. H.
System: The UNT Digital Library