1 Matching Results
Results open in a new window/tab.
Results:
1 - 1 of
1
183 B-C cross tie justification and scope
After the present solid slugs are replaced with the new I&E elements` in the 105-B reactor, the friction loss for the reactor cooling water will be decreased with a resulting opportunity for increase in flow through the reactor. The amount that this flow could be increased is limited by the capacity of the B water plant as well as the reactor itself. It is possible that there will be a shortage of filtered water at 183-B during the critical periods of each year. To overcome this possible shortage of water it has been proposed to construct a thirty inch tie line from the 183-C reservoir to the 183-B clear-well to supply filtered water to 183-B by gravity flow from 183-C. This report presents justification and the scope of this project.
Date:
December 2, 1957
Creator:
Brinkman, L. B.
System:
The UNT Digital Library