4 Matching Results
Results open in a new window/tab.
Results:
1 - 4 of
4
Final report -- PT-105-514-A, Installation of thermocouples in process channels
This document discusses a production test which was written when the piles were operating under a graphite temperature limit of 410 C. Operation was controlled by as-read temperatures of the originally installed G thermocouples, by thermocouples installed on vertical safety rod thimbles, and by thermocouples in graphite cylinders installed in the C test holes. Since the thimble thermocouples were to be removed under the Ball 3X program, it was planned to install thermocouples in some of the process tube channels to help monitor the graphite temperatures. In order to ensure maximum production levels based on graphite temperatures, the proper temperature relationships between the channel thermocouples and the G and/or C test hole thermocouples were needed. The expected maximum allowable channel thermocouple temperature reading would be higher than the burnout temperature limit of the graphite in the-pile.
Date:
August 8, 1955
Creator:
Greenfield, H. H.
System:
The UNT Digital Library
B-2076 -- Metal loader for ``C`` Elevator 100-B, D, DR, F, and H Areas
This report provides justification for a metal loader for ``C`` elevator for the 100-B,D,DR,F, and H Areas. This proposed work is justified on the basis of increased irradiation capacity for plutonium production and miscellaneous improvements in efficiency of reactor front face work.
Date:
December 8, 1955
Creator:
Lyons, T. H.
System:
The UNT Digital Library
Weekly report December 2-8, 1955 300-M area - Savannah River Plant
None
Date:
December 8, 1955
Creator:
unknown
System:
The UNT Digital Library