Serial/Series Title
2 Matching Results
Results open in a new window/tab.
Results:
1 - 2 of
2
Project Rulison: Summary of Results and Analyses.
None
Date:
October 31, 1972
Creator:
Reynolds, Miles, Jr.
System:
The UNT Digital Library
Project Rulison: Post-Shot Plans and Evaluations
Project Rulison post-shot plans and evaluations are discussed and include physical characteristics of the Rulison cavity; pressure and temperature expected in the cavity; amount, nature, and distribution of radioactivity in the cavity; reentry plan; radioactive species which may be encountered during reentry; public safety considerations arising from release of radioactivity; procedures to assure public safety; and the radiological safety plan. Maximum hypothetical accidents and ecological considerations are discussed in the appendices.
Date:
December 1, 1969
Creator:
unknown
System:
The UNT Digital Library