100 Areas technical activities report -- Physics, October 1946 (open access)

100 Areas technical activities report -- Physics, October 1946

The D Pile was down five times for scheduled shutdowns. The fifth shutdown was of short duration for the purpose of discharging temporary ``P`` columns. Details of the shutdowns are given. Three new bismuth columns were established, Special Requests were charged into seven tubes and three Special Requests were discharged. Three tubes were charged with four-inch slugs. The power level of the F Pile has been corrected for the discrepancy noted last month. Material for irradiation under the Special Request program was charged into six tubes and the B experimental hole during the month. The effect of poison columns and rods on the temperature distribution of the pile was checked for the overall content of the pile. The F Pile gained two in hours in cold, clean reactivity during the month if allowance is made for xenon poison values corresponding to 190 MW for the beginning of the month and 200 MW at the end of the month. The graphite stringer removed from the ``D`` test hole of the D Pile on 3-12-46 was studied physical radiation effects.
Date: November 6, 1946
Creator: Gast, P. F.
System: The UNT Digital Library
Summary of Blistering Inspections (open access)

Summary of Blistering Inspections

A table summarizes all the information on blistered slugs from March 1946 to Oct. 12, 1946, as recorded in weekly technical progress letters.
Date: November 27, 1946
Creator: Woods, W. K.
System: The UNT Digital Library
PROGRESS (A-1) REPORT FOR THE MONTH OF OCTOBER 1946 (open access)

PROGRESS (A-1) REPORT FOR THE MONTH OF OCTOBER 1946

None
Date: November 14, 1946
Creator: unknown
System: The UNT Digital Library