Tritium inventory of a target factor in an ICF power plant (open access)

Tritium inventory of a target factor in an ICF power plant

A preliminary parametric study has been performed to estimate the tritium inventory of a conjectured Target Factory. The inventory of a proposed tritiated fuel processing system was determined as a function of production efficiency, storage factor, and time interval for the slowest processing step. Results indicated that a study of this type will be beneficial in evaluating possible processing schemes for the production of tritiated laser fusion targets.
Date: May 7, 1981
Creator: Sherohman, J.W.
System: The UNT Digital Library