Hanford Atomic Products Operation monthly report for April 1955 (open access)

Hanford Atomic Products Operation monthly report for April 1955

This document presents a summary of work and progress at the Hanford Engineer Works for April 1955. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summarizes work for the Technical, Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.
Date: May 23, 1955
Creator: unknown
System: The UNT Digital Library
PRINCIPLES AND TECHNIQUES OF ULTRASONIC INSPECTION (open access)

PRINCIPLES AND TECHNIQUES OF ULTRASONIC INSPECTION

None
Date: May 23, 1955
Creator: Psillas, H.C.
System: The UNT Digital Library
RATIO OF U-232 TO U-233 PRODUCED IN THE TBR (open access)

RATIO OF U-232 TO U-233 PRODUCED IN THE TBR

The production of U/sup 232/ in the cost optimized TBR and oneregion thorlum oxide-uranium oxide slurry reactor has been estimated to be, respectively, 40 and 260 parts per million parts of U/sup 233/ produced. These production rates are compared with corresponding production rates in irradiated thorium rods and found to be comparable. Recommendations are made for increasing the purity of the U/sup 233/ product. (auth)
Date: May 23, 1955
Creator: Dresner, L
System: The UNT Digital Library
25 Process Assistance. For Period of May 2, 1955 to May 13, 1955 (open access)

25 Process Assistance. For Period of May 2, 1955 to May 13, 1955

None
Date: May 23, 1955
Creator: Culler, F L
System: The UNT Digital Library
Operating conditions of the ORR cooling system at 20 Mw (open access)

Operating conditions of the ORR cooling system at 20 Mw

None
Date: May 23, 1955
Creator: Sanders, J P
System: The UNT Digital Library