1 Matching Results
Results open in a new window/tab.
Results:
1 - 1 of
1
Adjustment of total control parameters for C Reactor
The three alterations discussed in this report have an effect on the parameters used in Total Control Calculations for C Reactor: Conversion to smaller diameter and shorter vertical safety rods in six outer control channels; installation of forty-four overbored tubes with short fuel charges in the flat zone and an associated increase in spike enrichment; and centralization of the enrichment ring into a three-lattice unit width in place of three and one-half lattice units previously in use. New parameters are derived in this document for future total control calculations.
Date:
May 22, 1962
Creator:
Vaughn, A. D.
System:
The UNT Digital Library