An introduction to performance debugging for parallel computers (open access)

An introduction to performance debugging for parallel computers

Programming parallel computers for performance is a difficult task that requires careful attention to both single-node performance and data exchange between processors. This paper discusses some of the sources of poor performance, ways to identify them in an application, and a few ways to address these issues.
Date: February 7, 1995
Creator: Gropp, W.
Object Type: Article
System: The UNT Digital Library
Functional design criteria, Project W-211, Initial Tank Retrieval Systems. Revision 1 (open access)

Functional design criteria, Project W-211, Initial Tank Retrieval Systems. Revision 1

This document provides the technical baseline for retrieval of waste from ten double-shell tanks in the SY, AN, AP, AW, AY, and AZ tank farms. In order to retrieve waste from these tanks, systems are needed to mix the sludge with the supernate and pump the waste mixture from the tank. For 101-SY, the existing mitigation pump will be used to mix the waste and Project W-211 will provide for waste removal. The retrieval scope for the other nine tanks includes both the waste mixing and removal functions.
Date: February 7, 1995
Creator: Rieck, C.A.
Object Type: Report
System: The UNT Digital Library
Engineering task plan for BX/BY compressor upgrade (open access)

Engineering task plan for BX/BY compressor upgrade

This Engineering Task Plan outlines the remaining work to be completed for the BX/BY Instrument Air upgrade. Initial work efforts were guided by Engineering Work Plan, ``BX-BY Compressor Upgrade`` dated 1-25-93 (see Attachment A) which is provided for information. The overall engineering task is to provide a permanent replacement for the instrument air supply system for the 241-BX/BY Tank Farms. The existing system consists of a 25 horsepower Worthington non-lube compressor and an Oriad air dryer. The existing equipment is dated, requires high maintenance and is located in a contaminated zone making it unusable. The BX/BY instrument air replacement unit will be one of the 100 SCFM generic air stations. This station will be permanently sited with the addition of drawing changes to provide a concrete foundation, air piping to existing lines and electrical power supply tie-ins.
Date: February 7, 1995
Creator: Strand, R.G.
Object Type: Report
System: The UNT Digital Library