BEVATRON OPERATION AND DEVELOPMENT. XXXIII. Period Covered February- April 1962 (open access)

BEVATRON OPERATION AND DEVELOPMENT. XXXIII. Period Covered February- April 1962

Experimental work consisted of one new run started and completed this quarter, and the completion of one of the three continuing runs. Of the scheduled operating time, the beam was on for 69.4% of the time, 2.3% of the time was used for experimental setup, and equipment outage took 29.3% of the time. There were two scheduled and two impromptu shutdowns. During one of the scheduled shutdowns the external-beam extraction magnets were installed in the east and south tangent tanks. The other scheduled shutdown was to readjust the Bevatron magnet elevation to correct for foundation subsidence. Internal magnets were also installed. In the new linac development program the ion source was run at 480 kv with a beam current of 100 ma. The linac tank was partially deplated to provide a clean copper surface, and welds and holes were plated with copper. The r-f losses were thereby reduced 20%. (auth)
Date: February 12, 1963
Creator: Crebbin, K.C.; Wenzel, W.A.; Lothrop, F.H.G. & Johnson, R.M.
System: The UNT Digital Library
Production reactor process tube film composition and radionuclide inventory studies. Status report (open access)

Production reactor process tube film composition and radionuclide inventory studies. Status report

The discharge of radioactivity from Hanford production reactors to the Columbia River has been studied for a number of years. The primary purposes of these studied have been to learn of the factors influencing production reactor effluent radioactivity concentrations and to develop methods for lowering the discharge concentrations of these radionuclides. In 1962 the Coolant Systems Development Operation (CSDO) began work on this program to determine the in-reactor film compositions and the inventory of radionuclides held in these films with the long-term objective of learning more about the complex in-reactor retention reactions that influence radionuclide effluent concentrations.
Date: February 12, 1963
Creator: Perrigo, L. D.
System: The UNT Digital Library
Pathfinder Atomic Power Plant. Clustered Pin Superheater Lattice Experiments (open access)

Pathfinder Atomic Power Plant. Clustered Pin Superheater Lattice Experiments

Experiments to obtain detailed thermal flux distribution measurements within a unit fuel cell and measurements of sub-cadmium and epi-cadmium U/sup 238/ absorption in the fuel rods are described. These quantities are required for determination of the thermal utilization and resonance escape probability of the fuel loading. (auth)
Date: February 12, 1963
Creator: Selep, A.
System: The UNT Digital Library