2 Matching Results
Results open in a new window/tab.
Results:
1 - 2 of
2
Rear crossheader expansion joints
The purpose of this report is to describe the results of prototypic tests of piping alterations designed to alleviate the above described conditions and to outline a program for full-scale implementation of these alterations.
Date:
February 8, 1962
Creator:
Hutton, P. H.
System:
The UNT Digital Library
Graphite distortion ``C`` Reactor. Final report
This report covers the efforts of the Laboratory in an investigation of the graphite distortion in the ``C`` reactor at Hanford. The particular aspects of the problem to be covered by the Laboratory were possible ``fixes`` to the control rod sticking problem caused by VSR channel distortion.
Date:
February 8, 1962
Creator:
Wood, N. H.
System:
The UNT Digital Library