Minimum pressure requirements at top of riser -- RDA DC-6, cooling water studies (open access)

Minimum pressure requirements at top of riser -- RDA DC-6, cooling water studies

This report consists of a graph which plots the minimum requirements for the pressure at the top of riser after an electrical power failure verses time after the electrical power failure. Pressure is expressed in pounds per square inch. Points for shutdown of maximum operation and normal operation are given.
Date: February 11, 1952
Creator: Nixon, V. D.
System: The UNT Digital Library