Production of Uranium Metal (open access)

Production of Uranium Metal

Experiments were carried out for the purpose of increasing production, efficiency, and purity of uranium metal. The electrolytic method as described by Driggs and Lilliendahl for the preparation of uranium metal was followed with but little deviation. The yield of metal at the very best was only 50%. The metal powder produced, at times, was very pyrophoric. Methods were found whereby the metal, at least in part, can be made from the oxides with an average yield of about 90%. The small amounts of sludge and slag accumulated in this modified process can readily be re-used in the electrolysis pot and, therefore, an overall yield of 96% can be obtained. Information accumulated from these experiments has been compiled in such a manner as to be readily available for factory use, for patent purposes and for future publication.
Date: February 17, 1943
Creator: Nagy, R.
System: The UNT Digital Library
Concentration of C-2 Slag (open access)

Concentration of C-2 Slag

The bomb reaction slag produced at the ElectroMetallurgical X metal plant is at present divided into rich C-1 slag and lean C-2 slag by merely screening through a 4 mesh wire screen, the "on 4 mesh" material becomes the C-1 slag and the "thru 4 mesh" material becomes the C-2 slag. In the experiments covered by this report it was found that the concentration of the lean C-2 slag could be facilitated by the use of a 20 mesh screen for the slang separation in place of the 4 mesh screen, as the 20 mesh screen removed troublesome, small, hard lumps which passed the 4 mesh screen. Furthermore, it was found that the additional small lumps removed by the 20 mesh screen were just as rich in X metal as the larger lumps which make up the bulk of C-1 slag.
Date: February 17, 1944
Creator: Thomas, W.G.
System: The UNT Digital Library