The B Pile operated 25 MW below rated power level without interruption during the week. The D Pile was shut down on January 29. During the shutdown 103 tubes were discharged. The shut down lasted for 15 hours. During operation after the shut down power was reduced to meet graphite temperature restrictions. The F Pile was run steadily throughout the week at 25 MW below rated level. Iron content in the process water averaged 0.015, 0.011 and 0.010 ppm at B, D, and F Areas, respectively. Examination of the slugs discharged from four corrosion tubes at F has been completed. A summary of conditions found in the vertical and horizontal aluminium thimbles at D and F during a recent inspection are given. Results are given on the graphite expansion problem.