History of the reactivation of 100-B pile (open access)

History of the reactivation of 100-B pile

This report summarizes the preparations made for reactivation of the 100-B pile and the operational activities associated with the reactivation and subsequent operation up to the time of reaching desired power level. The period covered is from approximately June 1, 1948 until July 16, 1948.
Date: October 29, 1948
Creator: Filip, E. J.
System: The UNT Digital Library
Report of measurement of radiation through Hanford Shield Production Test No. 105-213-P (open access)

Report of measurement of radiation through Hanford Shield Production Test No. 105-213-P

The intensities of radiations transmitted though a Hanford Pile Shield have been measured with the results discussed in this report.
Date: September 29, 1948
Creator: Whipple, G. H. Jr.
System: The UNT Digital Library
TECHNICAL INFORMATION ON SOME RARER METALS OF HIGH MELTING POINT (open access)

TECHNICAL INFORMATION ON SOME RARER METALS OF HIGH MELTING POINT

None
Date: November 29, 1948
Creator: Barrett, Pauline & Seybolt, Alan U.
System: The UNT Digital Library