Advancement of flash hydrogasification. Quarterly technical progress report, January-March 1984 (open access)

Advancement of flash hydrogasification. Quarterly technical progress report, January-March 1984

This first quarterly report documents technical progress during the period 31 December 1983 through 30 March 1984. The technical effort is 17 months in duration and is divided into two major technical tasks: Task VII, Hardware Fabrication and PDU Modifications, and Task VIII, Performance Testing. The design of test hardware and process development unit modifications had been previously completed as part of Task VI of the current contract. Task VII involves the fabrication of test hardware and modification of an existing 1-ton/h hydroliquefaction PDU at Rockwell's facilities for use as a hydrogasifier test facility. During this report period, fabrication of the test hardware and modifications to the PDU were initiated. Test hardware fabrication is now approximately 80% complete and should be completed by the end of May 1984. PDU modifications are progressing well and should be completed by the end of June 1984. The completed test hardware fabrication and PDU modifications will allow the conduct of short duration (1 to 2 h) hydrogasification tests along with preburner assembly performance evaluation tests in order to fulfill the test program objectives. Separate supplies of hydrogen, oxygen, methane, carbon monoxide, and water (for steam generation) are provided for this purpose. The modified facility …
Date: June 25, 1984
Creator: Falk, A. Y.
System: The UNT Digital Library
SLC intergirder quad vibrations (open access)

SLC intergirder quad vibrations

This report concerns recent measurements of the x, y and z vibrational motion of the quadrupole focusing magnets mounted between 40' girder assemblies in Sector 5. The amplitudes of their vibration were of particular concern, and these were measured in the presence of several different disturbances.
Date: June 25, 1984
Creator: McLagan, K.
System: The UNT Digital Library
Survey of initial experiments on ATA beam dynamics (open access)

Survey of initial experiments on ATA beam dynamics

The Advanced Test Accelerator (ATA) is a linear induction electron accelerator whose design parameters are 50 MeV, 10 kA and 70 ns pulse duration. The key physics issues affecting performance of the accelerator involve beam dynamics during transport through the accelerator structure. In this report, we present experimental results describing the initial operating phases of ATA. These results illustrate the complexity of the beam transport phenomena but also indicate the means to stabilize beam dynamics. Improvements in beam transport, which result from deploying various stabilization techniques, are also presented.
Date: June 25, 1984
Creator: Prono, D. S.; Caporaso, G. J.; Chong, Y. P.; Fessenden, T. J.; Hester, R. E.; Lauer, E. J. et al.
System: The UNT Digital Library