Douglas United Nuclear, Inc. and the National Defense Program (open access)

Douglas United Nuclear, Inc. and the National Defense Program

This report presents the results of an updated study to determine the preparation, schedules and cost for restart of KE Reactor and the subsequent plutonium production and incremental conversion cost of sustained plant operation. The restart of Hanford`s KE Reactor features short startup time, large capacity, low cost, and high purity product. The study shows that KE Reactor can be restarted and achieve full power 7 months after authorization. Prestartup costs are $4,416,000 for labor and material with only $375,000 for facility repair and replacement. Over 375 kg of plutonium are produced in the first years and equilibrium operation is achieved near the end of the second year.
Date: April 21, 1972
Creator: Harrington, C. D.
System: The UNT Digital Library
A Study of Catalytic Oxidation and Oxide Adsorption for the Removal of Tritium from Air (open access)

A Study of Catalytic Oxidation and Oxide Adsorption for the Removal of Tritium from Air

An apparatus and procedure were developed for studying the containment of tritium using catalytic conversion to the oxide followed by oxide adsorption. Data were obtained on the catalytic oxidation of elemental tritium and tritiated volatile hydrocarbons from pump oils between 23 and 538 degrees C. Oxidation efficiencies as high as 99.99997% (decontamination factor = 3.3 million) were obtained for total tritium levels of 1 ppm and a tritiated hydrocarbon level of approximately 0.2 ppb. In addition, a mathematical study was made to derive equations for the conceptual design of an "Emergency Containment System" for containment of tritium following an accidental release to room air.
Date: December 21, 1972
Creator: Bixel, John C. & Kershner, Carl J.
System: The UNT Digital Library
Trip report to ALCOA Extrusion Plant, Lafayette, Indiana (open access)

Trip report to ALCOA Extrusion Plant, Lafayette, Indiana

None
Date: January 21, 1972
Creator: McAndrew, J.B.
System: The UNT Digital Library
Muon Trident Direct Pair Production and Other Probes of the Muon-Muon Interaction (open access)

Muon Trident Direct Pair Production and Other Probes of the Muon-Muon Interaction

None
Date: September 21, 1972
Creator: Tannenbaum, Michael J.
System: The UNT Digital Library