100 Areas Technical Activities Report - Engineering, April 1947 (open access)

100 Areas Technical Activities Report - Engineering, April 1947

This is the first of a series of monthly reports covering details of the work of the Engineering Group of the Pile Technology Section of the Technical Department. The monthly Slug Inspection Report is being discontinued as a separate document and is being incorporated in this group report. Included is work on corrosion and blistering; graphite expansion; and irradiation studies.
Date: May 21, 1947
Creator: Woods, W. K.
System: The UNT Digital Library
Interim report No. 6 production test No. 106-52-P, graphite expansion: Gun barrel clearance (open access)

Interim report No. 6 production test No. 106-52-P, graphite expansion: Gun barrel clearance

The face to face expansion of the graphite packing of the pile reduces the gun barrel sum-clearance and if continued will strain the aluminum tubes with ultimate rupture of the Van Stone joints. The graphite expansion may be determined while an aluminum process tube is out of the unit. The distance from the graphite at the inner end of one gun barrel to the corresponding point at the opposite face is measured and compared to a similar measurement that was made during construction of the pile. The replacement of the two scored aluminum tubes at F Pile provided an opportunity to make these measurements. A corresponding measurements made during construction indicates an expansion of 28/32in. at Tube 2174-F and 23/32in. at 2284-F on November 5, 1946, after a total pile exposure of 132,896 MWD. Measurements of gun barrel sum-clearance and aluminum tube length before replacement indicated a graphite expansion of 25/32in. at Tube 2174-F and 24/32in. at 2284-F, which is in reasonable agreement with the above graphite measurements.
Date: January 21, 1947
Creator: Lewis, W. R. & Rohrbacher, R. A.