Conceptual engineering design study of thermionic topping of fossil power plants (open access)

Conceptual engineering design study of thermionic topping of fossil power plants

Primary objectives of this study are to investigate alternative design concepts of thermal coupling of thermionic energy converters (TECs) to the steam cycle and the mechanical and electrical aspects of integrating TEC design into the steam power station. The specific tasks include: (1) evaluate design concepts of TEC topping of solvent refined liquified coal-fired steam power plants, with main emphasis devoted to thermal, mechanical, and electrical design aspects. (2) Develop preliminary conceptual design of a modular TEC assembly. (3) Develop preliminary cost estimates of the design modification to a liquified coal-fired steam power plant with TEC topping. (4) Provide support to Thermo Electron Corporation in planning TEC hardware testing. Results are presented in detail.
Date: February 15, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Electric power supply and demand 1978--1987 for the continuous United States as projected by the Regional Electric Reliability Councils in their April 1, 1978 long-range coordinated planning reports to the Department of Energy (open access)

Electric power supply and demand 1978--1987 for the continuous United States as projected by the Regional Electric Reliability Councils in their April 1, 1978 long-range coordinated planning reports to the Department of Energy

The Regional Reliability Council projections of peak demand, generating capability, and electric energy requirements for the contiguous U.S. have declined for the fourth consecutive year. On the basis of these projections, it appears that the electric utility industry believes the U.S. will experience smaller annual increases in power use than have occurred in the past. The summer peak demand growth rates of the Councils range from 3.52 percent annually, as projected by the Northeast Power Coordinating Council, to the 6.21 percent projected by the Southwest Power Pool. Subregional growth covers a wider range, from the 2.77 percent of the New York Power Pool to the 6.51 percent of the Southern Company area. Total reserve margins at the time of summer peak demands are projected to decline from an estimated 30.16 percent in 1978 to about 23.81 percent in 1987. If projected loads are not exceeded, if projected capability levels are actually attained, if fuel requirements are satisfied, and if no contingencies worse than those normally met with are experienced, electric power supply should be adequate for the next decade. However, it is possible that the projected reserve margins will not be attained, and that adequate primary energy supply (fuel and …
Date: June 15, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Electrodril system field test program. Phase II, task B: deep drilling system demonstration. Final report (open access)

Electrodril system field test program. Phase II, task B: deep drilling system demonstration. Final report

The effort included the design, fabrication and Systems Verification Testing of the Deep Drilling System. The Systems Verification Test was conducted during October 1978 in a test well located on the premises of Brown Oil Tools Inc., Houston, Texas. In general, the Systems Verification test program was an unqualified success. All of the system elements of the Deep Drilling System were exercised and evaluated and in every instance the system can be declared ready for operational well demonstration. The motor/bit shaft combination operated very well and seal performance exceeds the design goals. The rig floor system performed better than expected. The power cable flexural characteristics are much better than anticipated and longitudinal stability is excellent. The prototype production connectors have functioned without failure. The cable reels and drive skid have also worked very well during the test program. The redesigned and expanded instrumentation subsystem also functioned very well. Some electronic component malfunctions were experienced during the early test stages, but they were isolated quickly and repaired. Subsequent downhole instrumentation deployments were successfully executed and downhole data was displayed both in the Electrodril instrumentation trailer and on the remote control and display unit.
Date: December 15, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Executive summary: Brayton isotope power system (open access)

Executive summary: Brayton isotope power system

The status and program plans for the DOE program to design and develop a long-life, safe Brayton isotope power system for space power are described. (WHK)
Date: March 15, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Financing geothermal resource development in the Pacific Region states (open access)

Financing geothermal resource development in the Pacific Region states

State and federal tax treatment as an incentive to development and non-tax financial incentives such as: the federal geothermal loan guarantee program, the federal geothermal reservoir insurance, and state financial incentives are discussed. (MHR)
Date: August 15, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Free-Piston Stirling Engine demonstrator test plan (open access)

Free-Piston Stirling Engine demonstrator test plan

Mechanical Technology Incorporated is developing a 1 KWe Free-Piston Stirling ENgine (FPSE) Power System. The plan for testing the demonstrator power system is presented. The test hardware is a Free-Piston Stirling Engine prime mover driving a linear alternator. The demonstrator system is basically a modular assembly. The modules are the reciprocating alternator section, engine section, heater head insulation package assembly, and the pressure vessel. The test objective is to demonstrate a system with greater than 30% overall efficiency at 1 KW, 45 hz operating conditions, and to identify and isolate engine losses to provide a basis for future engine improvements.
Date: December 15, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
High temperature facility for atomic physics studies. Final report (open access)

High temperature facility for atomic physics studies. Final report

The results of a program designed to develop a laser heated plasma sample for atomic physics studies in the 30 to 100 eV range of electron temperature and the 3 x 10/sup 17/ to 10/sup 18/ cm/sup -3/ range in electron density are presented. The approach used was discussed in detail in Mathematical Sciences Northwest, Inc., (MSNW) Proposal 1660, that is, the laser breakdown mode of heating in a slow solenoid. An extensive rework of the plasma sample facility was done in order to use this mode of heating. Specifically, a new solenoid magnet was constructed to allow higher field operation and the plasma chamber was modified to allow the use of puff filling orifices and small bore tube liners. The vacuum system and focussing optics were changed to allow the use of an on-axis Cassagranian system capable of focussing the laser radiation to a nearly diffraction limited spot as is necessary when heating through a small aperture. The 10 liter CO/sub 2/ laser optics were charged to an unstable oscillator configuration and additional windows were provided into the optical cavity for alignment purposes.
Date: December 15, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
High-temperature fuel cell research and development. Final technical status report, June 1977-September 1978 (open access)

High-temperature fuel cell research and development. Final technical status report, June 1977-September 1978

An initial survey of the literature produced a list of ceramic materials with properties which made them potential candidates for use in molten-carbonate fuel cell tiles or electrodes. Seven of the materials in the original list were dropped from consideration because of unfavorable thermodynamic properties; four materials were set aside because of high cost, lack of availability, or fabrication difficulties. Thirteen compositions were tested statically at 1000 K in a Li/sub 2/CO/sub 3/-K/sub 2/CO/sub 3/ bath under a dry CO/sub 2/ atmosphere. Only four of the materials tested showed severe degradation reactions in the molten carbonate. A low-temperature process for forming small diameter, high-aspect ratio ceramic fibers for fuel cell use has been developed. A short-term program to initiate a computer study on the thermodynamic analysis of fuel cell materials was initiated at Montana State University. The report on this program is included as Appendix B. The MHD and high-temperature fuel cell literature was surveyed, and material properties were evaluated to identify MHD materials with potential use for fuel cell applications. A technology transfer report of these findings was prepared. This report is included as Appendix A. Laboratory facilities were established to conduct research on interfacial diffusion processes which could …
Date: October 15, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Kilowatt isotope power system. Phase II plan. Volume I. Phase II program plan (open access)

Kilowatt isotope power system. Phase II plan. Volume I. Phase II program plan

The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a /sup 238/PuO/sub 2/-fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Phase II of the overall 3-phase KIPS program is described. This volume presents a program plan for qualifying the organic Rankine power system for flight test in 1982. The program plan calls for the design and fabrication of the proposed flight power system; conducting a development and a qualification program including both environmental and endurance testing, using an electrical and a radioisotope heat source; planning for flight test and spacecraft integration; and continuing ground demonstration system testing to act as a flight system breadboard and to accumulate life data. (LCL)
Date: March 15, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Kilowatt Isotope Power System, Phase II Plan. Volume IV. Teledyne FSCD vs GDS (open access)

Kilowatt Isotope Power System, Phase II Plan. Volume IV. Teledyne FSCD vs GDS

This Volume contains Teledyne's input to the Kilowatt Isotope Power System Phase II Plan. Included is a description of the Flight System Heat Generation System, Flight System Radiator, Thermal Insulation Stability, GDS Heat Generation System and GDS Radiator.
Date: March 15, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Kilowatt isotope power system. Phase II plan. Volume V. Safety, quality assurance and reliability (open access)

Kilowatt isotope power system. Phase II plan. Volume V. Safety, quality assurance and reliability

The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a /sup 238/PuO/sub 2/-fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Included in this volume are: launch and flight safety considerations; quality assurance techniques and procedures to be followed through system fabrication, assembly and inspection; and the reliability program made up of reliability prediction analysis, failure mode analysis and criticality analysis. (LCL)
Date: March 15, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Large Area Silicon Sheet by EFG. Quarterly Report No. 1, January 1, 1978--March 31, 1978. (open access)

Large Area Silicon Sheet by EFG. Quarterly Report No. 1, January 1, 1978--March 31, 1978.

None
Date: April 15, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Organic Rankine Kilowatt Isotope Power System. Final phase I report (open access)

Organic Rankine Kilowatt Isotope Power System. Final phase I report

On 1 August 1975 under Department of Energy Contract EN-77-C-02-4299, Sundstrand Energy Systems commenced development of a Kilowatt Isotope Power System (KIPS) directed toward satisfying the higher power requirements of satellites of the 1980s and beyond. The KIPS is a /sup 238/PuO/sub 2/ fueled organic Rankine cycle turbine power system which will provide design output power in the range of 500 to 2000 W/sub (e)/ with a minimum of system changes. The principal objectives of the Phase 1 development effort were to: conceptually design a flight system; design a Ground Demonstration System (GDS) that is prototypic of the flight system in order to prove the feasibility of the flight system design; fabricate and assemble the GDS; and performance and endurance test the GDS using electric heaters in lieu of the isotope heat source. Results of the work performed under the Phase 1 contract to 1 July 1978 are presented.
Date: July 15, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Proposed format and content of license applications for deep geologic terminal repositories for radioactive material (open access)

Proposed format and content of license applications for deep geologic terminal repositories for radioactive material

Chapters are devoted to the following: introduction and general description; summary safety analysis; site characteristics; principal design criteria; repository design; operations systems; management of onsite generated waste; radiation protection; accident safety analysis; conduct of operations; operating controls and limits; and quality assurance.
Date: September 15, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Standardized Technical Specifications for Westinghouse PWRs (open access)

Standardized Technical Specifications for Westinghouse PWRs

This Standard Technical Specification (STS) has been structured for the broadest possible use on Westinghouse plants currently being reviewed for an Operating License. Accordingly, the document contains specifications applicable to plants (1) with either 3 or 4 loops and (2) with and without loop stop valves. In addition, four separate and discrete containment specification sections are provided for each of the following containment types: Atmospheric, Ice Condenser, Sub-Atmospheric, and Dual. Optional specifications are provided for those features and systems which may be included in individual plant designs but are not generic in their scope of application. Alternate specifications are provided in a limited number of cases to cover situations where alternate specification requirements are necessary on a generic basis because of design differences. The format of the STS addresses the categories required by 10 CFR 50 and consists of six sections covering the areas of: Definitions, Safety Limits and Limiting Safety System Settings, Limiting Conditions for Operation, Surveillance Requirements, Design Features, and Administrative Controls.
Date: June 15, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Workshop on perspectives in energy: 1978. Final report (open access)

Workshop on perspectives in energy: 1978. Final report

A report on the Workshop on Perspectives in Energy is presented. The workshop, conducted from July 31 to August 10, 1978, included field trips, new energy topics of particular interest to the area around Kansas, and outside speakers. The response of the participants to the workshop are summarized.
Date: August 15, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library