Serial/Series Title
Year
Day
40 Matching Results
Results open in a new window/tab.
prev
Results:
25 - 40 of
40
Performance/design and qualification requirements for nozzle skirt extension
None
Date:
December 15, 1969
Creator:
unknown
System:
The UNT Digital Library
Performance/design and qualification requirements for pressure vessel and closure subsystem
None
Date:
December 15, 1969
Creator:
unknown
System:
The UNT Digital Library
Performance/design and qualification requirements for propellant feed subsystem
None
Date:
December 15, 1969
Creator:
unknown
System:
The UNT Digital Library
Performance/design and qualification requirements for propellant shutoff valve and actuator
None
Date:
December 15, 1969
Creator:
unknown
System:
The UNT Digital Library
Performance/design and qualification requirements for pump discharge check valve and actuator
None
Date:
December 15, 1969
Creator:
unknown
System:
The UNT Digital Library
Performance/design and qualification requirements for pump discharge line
None
Date:
December 15, 1969
Creator:
unknown
System:
The UNT Digital Library
Performance/design and qualification requirements for shield spacer
None
Date:
December 15, 1969
Creator:
unknown
System:
The UNT Digital Library
Performance/design and qualification requirements for structural support coolant lines
None
Date:
December 15, 1969
Creator:
unknown
System:
The UNT Digital Library
Performance/design and qualification requirements for thrust structure subsystem
None
Date:
December 15, 1969
Creator:
unknown
System:
The UNT Digital Library
Performance/design and qualification requirements for turbine inlet line
None
Date:
December 15, 1969
Creator:
unknown
System:
The UNT Digital Library
Performance/design and qualification requirements for turbine inlet line
None
Date:
December 15, 1969
Creator:
unknown
System:
The UNT Digital Library
Performance/design and qualification requirements for upper thrust structure
None
Date:
December 15, 1969
Creator:
unknown
System:
The UNT Digital Library
Performance/design and qualification requirements for wiring harness
None
Date:
December 15, 1969
Creator:
unknown
System:
The UNT Digital Library
Presentation material for long-range program plan
None
Date:
December 15, 1969
Creator:
unknown
System:
The UNT Digital Library
SNAP-23A Program. Phase I. Thermoelectric Converter Development Program. Monthly report, April 1969
The following activities were conducted during the month of April 1969: continued effort toward completion of the detailed design of the PMC-2 converter, conducted technical liaison with Westinghouse with respect to the power cable specification, conducted potting test for evaluation of material suitable for SNAP-23A converter PMC-2 leak specification, and completed design of parts for the Weld Development Program. Test data evaluation and analysis were performed on the following long-term test devices during February 1969: experimental mockup converter No. 2 (EMC-2), experimental mockup converter No. 3 (EMC-3), prototype mockup converter No. 1B (PMC-1B), 10-couple modules 1 and 3, 10-couple modules 5 through 12 on design-of-experiments tests, 6-couple module 23A3, and converter 23 P-2.
Date:
May 15, 1969
Creator:
unknown
System:
The UNT Digital Library
SNAP-23A Program, Phase I. Thermoelectric Converter Development Program. Monthly Report, February 1969.
None
Date:
March 15, 1969
Creator:
unknown
System:
The UNT Digital Library