Meeting of laboratory and medical directors, October 21 and 22, 1949, Donner Laboratory, University of California, Berkeley, California (open access)

Meeting of laboratory and medical directors, October 21 and 22, 1949, Donner Laboratory, University of California, Berkeley, California

The meetings divided into two parts, with reviews of work being done in radiobiology at the University of California by various members of their staff as part one, and, as part two, a meeting conducted by Dr. Shields Warren for Laboratory Directors and their representatives. For the most part papers which were reviewed were summarized material which has appeared in the literature and gave progress to date. Since the purpose of the meeting itself was more for the informal directors meetings, results of the latter are here abstracted.
Date: November 15, 1949
Creator: Kornberg, H. A.
System: The UNT Digital Library
Requirements for heater test element (open access)

Requirements for heater test element

The test unit is to simulate the conditions existing in the ``active``section of a pile process tube. This section is loaded with 64 slugs each of length equal to 4.3767 inches, giving an overall active length of 23.34 feet. The figure of 4.3767 inches is the overall length of the aluminum can, rather than that of the slug proper. The calculations tabulated on the accompanying data sheet are representative of the conditions of operation of the ``maximum performance tube`` in the pile. The resistance of a heater element with the specified wall thickness is such as to give a total heating of 552 Kw (corresponding to an 800 mw operating level) with a current of 13,000 amperes flowing through the tube. The heating distribution is a sine curve with a maximum heating of 33.56 Kw/ft. at the center. No attempt will be made to simulate the heating distribution in the aluminum end cap.
Date: November 15, 1949
Creator: Roy, G. M.
System: The UNT Digital Library
PROGRESS REPORT IN METALLURGY, APRIL 1, 1949 TO SEPTEMBER 30, 1949 (open access)

PROGRESS REPORT IN METALLURGY, APRIL 1, 1949 TO SEPTEMBER 30, 1949

None
Date: November 15, 1949
Creator: unknown
System: The UNT Digital Library