5 Matching Results
Results open in a new window/tab.
Results:
1 - 5 of
5
River water sampling, Columbia River: Determination of necessity of cross sectional sampling
This document contains raw laboratory data concerning the testing done at the Columbia River at the Hanford Site.
Date:
September 15, 1947
Creator:
Butler, B. F.
System:
The UNT Digital Library
Waste disposal: Failure of T Plant underground metal waste line from Section 9
On June 23, 1947, a hole was discovered in the earthen fill near the T Plant R-19 stairwell directly above the path followed by the underground waste lines from the canyon. Jetting of all canyon wastes to the 241 Buildings was stopped and the canyon process shut down. This report discusses repair and characterization procedures for the soils and waste line pipe.
Date:
July 15, 1947
Creator:
Chapman, V. R.
System:
The UNT Digital Library
234-5 Project, Specification Letter 234-9, 235-9, Analytical Control Laboratory
This document presents the details of the design of the analytical control laboratory for the 234-5 project at the Hanford site.
Date:
December 15, 1947
Creator:
Curtis, R.E.
System:
The UNT Digital Library
CHEMICAL PROCESS TO RECOVER URANIUM FROM PHOSPHATE ROCK
None
Date:
November 15, 1947
Creator:
Igelsrud, I.
System:
The UNT Digital Library
SUMMARY REPORT ON DESIGN AND DEVELOPMENT OF HIGH TEMPERATURE GAS-COOLED POWER PILE
None
Date:
September 15, 1947
Creator:
McCullough, C.R.
System:
The UNT Digital Library