Application of structural-mechanics methods to the design of large tandem-mirror fusion devices (MFTF-B). Revision 1 (open access)

Application of structural-mechanics methods to the design of large tandem-mirror fusion devices (MFTF-B). Revision 1

The Mirror Fusion Test Facility (MFTF-B) at Lawrence Livermore National Laboratory requires state-of-the-art structural-mechanics methods to deal with access constraints for plasma heating and diagnostics, alignment requirements, and load complexity and variety. Large interactive structures required an integrated analytical approach to achieve a reasonable level of overall system optimization. The Tandem Magnet Generator (TMG) creates a magnet configuration for the EFFI calculation of electromagnetic-field forces that, coupled with other loads, form the input loading to magnet and vessel finite-element models. The analytical results provide the data base for detailed design of magnet, vessel, foundation, and interaction effects. 13 refs.
Date: August 15, 1985
Creator: Karpenko, V.N. & Ng, D.S.
Object Type: Article
System: The UNT Digital Library
Cost comparisons for SSC magnet dependent systems (open access)

Cost comparisons for SSC magnet dependent systems

An SSC Cost Estimating Task Force was appointed by the SSC Director in May, 1985. The charge to the task force was to perform a detailed review of costs for all superconducting magnet design styles that are under consideration for the SSC. Cost information on five magnet styles was reviewed in detail by the task force members. The basic cost information was developed by participating laboratories and by industry. Details of the procedure and analysis are presented in Chapter III. The purpose of this report is to provide a comparison of all SSC construction project cost information that is dependent on the various magnet styles. It is emphasized that the costs displayed in the tables of this report are not the total costs for an SSC construction project. Only those systems for which costs vary with magnet style are included. In Appendix E, current results are compared with the relevant parts of the 1984 SSC Reference Designs Study (RDS) cost estimate. Following the method used in the RDS, the costs that are developed here are non-site specific. The labor rates utilized are based on a national average for the various labor categories. The Conventional Systems costs for underground structures are …
Date: August 15, 1985
Creator: unknown
Object Type: Report
System: The UNT Digital Library