2 Matching Results
Results open in a new window/tab.
Results:
1 - 2 of
2
Building 313 operations
On June 3 the writer was detailed to the 300 Area to study operations in Bldg, 313. Seven days were spent with C shift in the caning and dipping area. In this period, a system of coordinating press cycles was developed to utilize machine time most effectively. Subsequently, a brief amount of time was spent working in a design of the can cleaning area so as to incorporate the aluminum can etching operation and facilitate the handling and flow of materials. The next stage of perhaps a week was devoted to a study of inspection and testing methods. The final period of one week was utilized mainly to develop a method of storing finished material so as to provide the maximum amount of piece-classification flexibility without incurring enormous burdens in the movement of material to later stages of the operation.
Date:
July 7, 1944
Creator:
Venable, I. B.
System:
The UNT Digital Library
Metallurgical Project Technical Division Program Authorizations
None
Date:
April 7, 1944
Creator:
Cooper, C. M.
System:
The UNT Digital Library