2020 Census: Sustaining Current Reform Efforts Will Be Key to a More Cost-Effective Enumeration (open access)

2020 Census: Sustaining Current Reform Efforts Will Be Key to a More Cost-Effective Enumeration

Testimony issued by the Government Accountability Office with an abstract that begins "Overall, the U.S. Census Bureau’s (Bureau) planning efforts for 2020 are off to a good start, as the Bureau made noteworthy progress within each of the four lessons learned from the 2010 Census. Still, additional steps will be needed within each of the lessons learned in order to sustain those reforms."
Date: July 18, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
L.A. Courthouse: Initial Project Justification Is Outdated and Flawed (open access)

L.A. Courthouse: Initial Project Justification Is Outdated and Flawed

Testimony issued by the Government Accountability Office with an abstract that begins "Because of delays and cost increases, the General Services Administration (GSA) canceled the authorized 41-courtroom Los Angeles (L.A.), California, courthouse project in 2006. Since then, GSA and the judiciary have been slow to agree upon how to proceed with the project, for which about $366 million in appropriated funds remains available. In 2012, with the judiciary’s support, GSA issued a request for proposal for contractors to design and build a 24-courtoom, 32-chamber courthouse, which would be used in conjunction with 25 existing courtrooms in the Roybal Courthouse. However, this new plan will not address one of the principal justifications for the original project—that the L.A. Court be centralized at one site. Instead, it would increase the distance between the Roybal Courthouse and the planned second court location and the distance to the federal detention center from which prisoners must be transported."
Date: August 17, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Actions to Enforce the Iran Sanctions Act and Implement Contractor Certification Requirement (open access)

Actions to Enforce the Iran Sanctions Act and Implement Contractor Certification Requirement

Correspondence issued by the Government Accountability Office with an abstract that begins "Since the fall of 2010, State has sanctioned 13 foreign firms under the ISA—2 for investments in Iran’s energy sector and 11 for supplying refined petroleum products."
Date: January 24, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Afghanistan Drawdown Preparations: DOD Decision Makers Need Additional Analyses to Determine Costs and Benefits of Returning Excess Equipment (open access)

Afghanistan Drawdown Preparations: DOD Decision Makers Need Additional Analyses to Determine Costs and Benefits of Returning Excess Equipment

Correspondence issued by the Government Accountability Office with an abstract that begins ""
Date: December 19, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Afghanistan Security: Department of Defense Effort to Train Afghan Police Relies on Contractor Personnel to Fill Skill and Resource Gaps (open access)

Afghanistan Security: Department of Defense Effort to Train Afghan Police Relies on Contractor Personnel to Fill Skill and Resource Gaps

Correspondence issued by the Government Accountability Office with an abstract that begins "U.S. government (USG), non-USG coalition, and DOD contractor personnel perform various roles in the ANP training program. These roles include: (1) serving as advisors and mentors to build ministerial capacity in areas such as financial and human resource management at the Afghan Ministry of Interior; (2) serving as mentors and trainers to develop Afghan commanders’ abilities to operate training sites and provide training to ANP recruits in areas such as criminal investigation, weapons, survival skills, and physical fitness; and (3) serving as embedded mentors to help deployed ANP units develop civilian policing skills. DOD contractor personnel also provide maintenance, logistics, and security support at training sites.As of November 2011, about 778 USG, non-USG coalition, and DOD contractor personnel provided ANP training and mentoring at 23 NATO-managed sites. Approximately 66 percent of these trainers and mentors were non-USG coalition personnel, 21 percent were USG personnel, and the remaining 13 percent were DOD contractor personnel. In addition, about 2,825 DOD contractor personnel provided maintenance, logistics, and security services at 12 NATO-managed training sites."
Date: February 23, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Afghanistan Security: Long-standing Challenges May Affect Progress and Sustainment of Afghan National Security Forces (open access)

Afghanistan Security: Long-standing Challenges May Affect Progress and Sustainment of Afghan National Security Forces

Testimony issued by the Government Accountability Office with an abstract that begins "The Department of Defense (DOD) and the North Atlantic Treaty Organization (NATO) report progress developing capable Afghan National Security Forces (ANSF), but tools used to assess the performance of ANSF units have changed several times. In April 2012, DOD reported progress increasing the number and capability of ANSF, with 7 percent of army units and 9 percent of police units rated at the highest level of capability. GAO has previously found the tools used by DOD and NATO to assess ANSF reliable enough to support broad statements regarding capability. However, issues related to these tools exist. When GAO reported on ANA capability in January 2011, the highest capability rating level was “independent”—meaning that a unit was capable of executing the full spectrum of its missions without assistance from coalition forces. As of August 2011, the highest level had changed to “independent with advisors”—meaning that a unit was capable of executing its mission and can call for coalition forces when necessary. DOD reports, these changes, as well as the elimination of certain requirements for validating units, were partly responsible for the increase in ANSF units rated at the highest …
Date: July 24, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Afghanistan: USAID Oversight of Assistance Funds and Programs (open access)

Afghanistan: USAID Oversight of Assistance Funds and Programs

Testimony issued by the Government Accountability Office with an abstract that begins "The U.S. Agency for International Development (USAID) has experienced systemic challenges that have hindered its ability to manage and oversee contracts and assistance instruments in Afghanistan. Key challenges include gaps in planning for the use of contractors and assistance recipients and having visibility into their numbers. For example, GAO reported in April 2010 that, absent strategic planning for its use of contractors, individual offices within USAID often made case-by-case decisions on using contractors to support contract or grant administration and risks, such as possible conflicts of interest, were not always addressed. While having reliable data on contractors and assistance recipients is a starting point for informing agency decisions and ensuring proper management, GAO has also reported on limitations in USAID’s visibility into the number and value of contracts and assistance instruments in Afghanistan, as well as the number of personnel working under them. USAID, along with other agencies, has not implemented GAO’s recommendation to address such limitations. USAID, however, has taken other actions to mitigate risks associated with awarding contracts and assistance instruments in Afghanistan. In June 2011, GAO reported on USAID’s vendor vetting program, then in its …
Date: June 6, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Agency Operations: Agencies Must Continue to Comply with Fiscal Laws Despite the Possibility of Sequestration (open access)

Agency Operations: Agencies Must Continue to Comply with Fiscal Laws Despite the Possibility of Sequestration

Testimony issued by the Government Accountability Office with an abstract that begins "The Budget Control Act of 2011, amending the Balanced Budget and Emergency Deficit Control Act of 1985, establishes limits on discretionary spending for fiscal years 2012 through 2021. In addition, the Act specifies additional limits on discretionary spending and automatic reductions in direct spending because legislation was not enacted that would reduce projected deficits by at least $1.2 trillion by the end of fiscal year 2021. Among other things, the Budget Control Act requires the Office of Management and Budget (OMB) to calculate, and the President to order, a sequestration of discretionary and direct spending on January 2, 2013, to achieve reductions for that fiscal year."
Date: April 25, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Air Emissions and Electricity Generation at U.S. Power Plants (open access)

Air Emissions and Electricity Generation at U.S. Power Plants

Correspondence issued by the Government Accountability Office with an abstract that begins "Older electricity generating units—those that began operating in or before 1978—provided 45 percent of electricity from fossil fuel units in 2010 but produced a disproportionate share of emissions, both in aggregate and per unit of electricity generated. Overall, in 2010 older units contributed 75 percent of sulfur dioxide emissions, 64 percent of nitrogen oxides emissions, and 54 percent of carbon dioxide emissions from fossil fuel units. For each unit of electricity generated, older units collectively emitted about 3.6 times as much sulfur dioxide, 2.1 times as much nitrogen oxides, and 1.3 times as much carbon dioxide as newer units. The difference in emissions between older units and their newer counterparts may be attributed to a number of factors. First, 93 percent of the electricity produced by older fossil fuel units in 2010 was generated by coal-fired units. Compared with natural gas units, coal-fired units produced over 90 times as much sulfur dioxide, twice as much carbon dioxide and over five times as much nitrogen oxides per unit of electricity, largely because coal contains more sulfur and carbon than natural gas. Second, fewer older units have installed emissions controls, …
Date: April 18, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Air Force and Interior Can Benefit from Additional Guidance When Deciding Whether to Lease or Purchase Equipment (open access)

Air Force and Interior Can Benefit from Additional Guidance When Deciding Whether to Lease or Purchase Equipment

Correspondence issued by the Government Accountability Office with an abstract that begins "Contracting officials from Air Force and Interior generally did not perform lease versus purchase analyses for selected contracts. Based on contract file reviews and discussions with contracting officials, we found that analyses were not performed and that contracting officials had not considered the alternative acquisition method for 24 of the 32 selected contracts. For the 8 contracts with lease versus purchase analyses, 5 were documented in the contract files and 3 were performed but were not documented, according to contracting officials. In most cases, contract files did not contain basic information to make lease or purchase decisions, such as the length of time the equipment would be used. Even files containing documentation of analyses generally did not address the full range of criteria specified in the FAR. For example, the analyses typically lacked a discussion of the financial and operating advantages of alternate approaches that would help contracting officials determine the appropriate acquisition method. Contracting officials noted that their decision to lease or purchase equipment often depends on the nature of the requirement, such as a short-term need for equipment, based on documents or other correspondence from the …
Date: February 7, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Air Passenger Screening: Transportation Security Administration Needs to Improve Complaint Processes (open access)

Air Passenger Screening: Transportation Security Administration Needs to Improve Complaint Processes

Testimony issued by the Government Accountability Office with an abstract that begins "In summary, TSA receives thousands of air passenger screening complaints through five central mechanisms, but does not have an agencywide policy, consistent processes, or a focal point to guide receipt and use of such information. Also, while the agency has several methods to inform passengers about its complaint processes, it does not have an agencywide policy or mechanism to ensure consistent use of these methods among commercial airports. In addition, TSA's complaint resolution processes do not fully conform to standards of independence to ensure that these processes are fair, impartial, and credible, but the agency is taking steps to improve independence. To address these issues, we made four recommendations to TSA with which the agency concurred, and it indicated actions it is taking in response. Finally, TSA officials stated that the agency is undertaking efforts to focus its resources and improve the passenger experience at security checkpoints by applying new intelligence-driven, risk-based screening procedures, including expanding its Pre✓™ program. TSA plans to have this program in place at 35 airports by the end of the calendar year and estimates that it has screened more than 4 million passengers …
Date: November 29, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Arlington National Cemetery: Actions Needed to Ensure Lasting, Positive Changes in Contracting and Management (open access)

Arlington National Cemetery: Actions Needed to Ensure Lasting, Positive Changes in Contracting and Management

Testimony issued by the Government Accountability Office with an abstract that begins "GAO identified 56 contracts and task orders that were active during fiscal year 2010 and the first three quarters of fiscal year 2011 under which contracting offices obligated roughly $35.2 million on Arlington’s behalf. These contracts supported cemetery operations, construction and facility maintenance, and new efforts to enhance information-technology systems for the automation of burial operations. The Army has taken a number of steps since June 2010 at different levels to provide for more effective management and oversight of contracts, establishing new support relationships, formalizing policies and procedures, and increasing the use of dedicated contracting staff to manage and improve its acquisition processes. However, GAO found that ANCP does not maintain complete data on its contracts, responsibilities for contracting support are not yet fully defined, and dedicated contract staffing arrangements still need to be determined. The success of Arlington’s acquisition outcomes will depend on continued management focus from ANCP and its contracting partners to ensure sustained attention to contract management and institutionalize progress made to date. GAO made three recommendations to continue improvements in contract management. The Department of Defense (DOD) partially concurred and noted actions in progress …
Date: February 3, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Arlington National Cemetery: Actions Taken and Steps Remaining to Address Contracting and Management Challenges (open access)

Arlington National Cemetery: Actions Taken and Steps Remaining to Address Contracting and Management Challenges

Testimony issued by the Government Accountability Office with an abstract that begins ""
Date: January 25, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Aviation Safety: FAA Has An Opportunity to Enhance Safety and Improve Oversight of Initial Pilot Training (open access)

Aviation Safety: FAA Has An Opportunity to Enhance Safety and Improve Oversight of Initial Pilot Training

A statement of record issued by the Government Accountability Office with an abstract that begins "FAA’s pilot training requirements for certification of commercial pilots are not aligned with airline operations or emphasize skills that airlines consider important for greater aviation safety."
Date: March 20, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Aviation Safety: FAA Is Taking Steps to Improve Data, but Challenges for Managing Safety Risks Remain (open access)

Aviation Safety: FAA Is Taking Steps to Improve Data, but Challenges for Managing Safety Risks Remain

Testimony issued by the Government Accountability Office with an abstract that begins "The Federal Aviation Administration (FAA) uses data reactively and proactively to prevent accidents and manage safety risks. For instance, since 1998, FAA has partnered with the airline industry to identify precursors and contributing factors, and ensure that efforts to improve safety focus on the most prevalent categories of accidents and formulate an intervention strategy designed to reduce recurrences. Although FAA plans to continue using data reactively to understand the causes of accidents and incidents, as part of its adoption of Safety Management Systems (SMS), it is shifting to a proactive approach in which it analyzes data to identify and mitigate risks before they result in accidents."
Date: April 25, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Aviation Security: 9/11 Anniversary Observations on TSA's Progress and Challenges in Strengthening Aviation Security (open access)

Aviation Security: 9/11 Anniversary Observations on TSA's Progress and Challenges in Strengthening Aviation Security

Testimony issued by the Government Accountability Office with an abstract that begins "The Transportation Security Administration (TSA) has taken actions to validate the science underlying its behavior-based passenger screening program, the Screening of Passengers by Observation Techniques, or SPOT, program, but more work remains. GAO reported in May 2010 that (1) TSA deployed SPOT before first determining whether there was a scientifically valid basis for using behavior and appearance indicators to reliably identify passengers who may pose a risk; and (2) it is unknown if the SPOT program has ever resulted in the arrest of anyone who is a terrorist, or who was planning to engage in terrorist related activity, although there is other evidence that terrorists have transited through SPOT airports. GAO recommended in May 2010 that the Department of Homeland Security (DHS) convene an independent panel of experts to review the methodology of the ongoing validation study on the SPOT program to determine whether it is sufficiently comprehensive to validate the program. DHS concurred and subsequently revised its validation study to include an independent expert review. DHS's study, completed in April 2011, found that SPOT was more effective than random screening to varying degrees; however, DHS noted limitations …
Date: September 11, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Aviation Security: Status of TSA's Acquisition of Technology for Screening Passenger Identification and Boarding Passes (open access)

Aviation Security: Status of TSA's Acquisition of Technology for Screening Passenger Identification and Boarding Passes

Testimony issued by the Government Accountability Office with an abstract that begins "In summary, TSA has completed its initial testing of the CAT/BPSS technology and has begun operational testing at three airports. We found the project’s associated life cycle cost estimate to be reasonably comprehensive and well documented, although we are less confident in its accuracy due to questions about the assumed inflation rate. In addition, we could not evaluate its credibility because the current version does not include an independent cost estimate or an assessment of how changing key assumptions and other factors would affect the estimate. Our past work has identified three key challenges related to TSA’s efforts to acquire and deploy technologies to address homeland security needs: (1) developing and meeting technology program requirements, (2) overseeing and conducting testing of new screening technologies, and (3) developing acquisition program baselines to establish initial cost, schedule, and performance parameters."
Date: June 19, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Biosurveillance: Observations on BioWatch Generation-3 and Other Federal Efforts (open access)

Biosurveillance: Observations on BioWatch Generation-3 and Other Federal Efforts

Testimony issued by the Government Accountability Office with an abstract that begins "The Department of Homeland Security (DHS) and the White House have acted to strengthen biosurveillance consistent with prior GAO recommendations made from December 2009 through October 2011.In August 2012, DHS issued a strategic plan for its National Biosurveillance Integration Center (NBIC) that officials say was written in coordination with federal partners and designed to respond to GAO’s December 2009 findings that NBIC did not have key resources to carry out its mission, in part due to collaboration issues it faced. In July 2012, the White House released the National Strategy for Biosurveillance, which describes guiding principles, core functions, and enablers for strengthening biosurveillance. In June 2010, GAO recommended a national biosurveillance strategy to provide a unifying framework for building and maintaining a national biosurveillance capability. In October 2011, GAO also recommended the strategy account for the need to leverage resources and respond to challenges while partnering with nonfederal entities. The July 2012 strategy partially responds to the issues GAO called for such a strategy to address, but does not fully address them, as discussed below. A strategic implementation plan is to be published within 120 days of strategy …
Date: September 13, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Border Patrol Strategy: Progress and Challenges in Implementation and Assessment Efforts (open access)

Border Patrol Strategy: Progress and Challenges in Implementation and Assessment Efforts

Testimony issued by the Government Accountability Office with an abstract that begins "GAO’s prior work has highlighted progress and challenges in various areas related to Border Patrol’s implementation of its 2004 National Strategy, which could provide insights as Border Patrol transitions to its 2012 Strategic Plan. Border Patrol officials stated that the 2012 Strategic Plan will rely on Border Patrol and federal, state, local, tribal, and international partners working together to use a risk-based approach to secure the border, and include the key elements of “Information, Integration, and Rapid Response” to achieve objectives. These elements were similar to those in the 2004 Strategy and GAO’s past work highlighted the progress and challenges the agency faced obtaining information necessary for border security; integrating security operations with partners; and mobilizing a rapid response to security threats. Border Patrol successfully used interagency forums and joint operations to counter threats, but challenges included assessing the benefits of border technology and infrastructure to, among other things, provide information on situational awareness. For example, in May 2010 GAO reported that the Department of Homeland Security’s (DHS) U.S. Customs and Border Protection (CBP) had not accounted for the effect of its investment in border fencing and infrastructure …
Date: May 8, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Border Security: Observations on Costs, Benefits, and Challenges of a Department of Defense Role in Helping to Secure the Southwest Land Border (open access)

Border Security: Observations on Costs, Benefits, and Challenges of a Department of Defense Role in Helping to Secure the Southwest Land Border

Testimony issued by the Government Accountability Office with an abstract that begins "The National Defense Authorization Act for Fiscal Year 2011 mandated that GAO examine the costs and benefits of an increased Department of Defense (DOD) role to help secure the southwest land border. This mandate directed that GAO report on, among other things, the potential deployment of additional units, increased use of ground-based mobile surveillance systems, use of mobile patrols by military personnel, and an increased deployment of unmanned aerial systems and manned aircraft in national airspace. In September 2011, GAO reported that DOD estimated a total cost of about $1.35 billion for two separate border operations—Operation Jump Start and Operation Phalanx—conducted by National Guard forces in Title 32 status from June 2006 to July 2008 and from June 2010 through September 30, 2011, respectively. Further, DOD estimated that it has cost about $10 million each year since 1989 to use active duty Title 10 forces nationwide, through its Joint Task Force-North, in support of drug law enforcement agencies with some additional operational costs borne by the military services. Agency officials stated multiple benefits from DOD’s increased border role, such as assistance to the Department of Homeland Security (DHS) …
Date: April 17, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Bureau of the Public Debt: Areas for Improvement in Information Systems Controls (open access)

Bureau of the Public Debt: Areas for Improvement in Information Systems Controls

Correspondence issued by the Government Accountability Office with an abstract that begins "During our fiscal year 2011 audit, we identified eight new general information systems control deficiencies related to access controls, configuration management, and segregation of duties. We made nine recommendations to address these control deficiencies. In a separately issued Limited Official Use Only report, we communicated to BPD management detailed information regarding our findings and related recommendations."
Date: May 24, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Cancellation of the Army's Autonomous Navigation System (open access)

Cancellation of the Army's Autonomous Navigation System

Correspondence issued by the Government Accountability Office with an abstract that begins "Almost all ANS hardware and most software development were completed prior to its cancellation, according to the Army and GDRS. The software for the most advanced capabilities was not completed, which potentially presented the greatest complexities. GDRS had demonstrated many of ANS’s capabilities to some extent, including its capability to avoid obstacles and follow a leading vehicle through varying terrain. ANS had not yet progressed to the independent testing phase, however. In cancelling ANS and MM-UGV, the Army estimated that approximately $2.5 billion in planned funding for fiscal years 2013 to 2017 could be made available for other Army efforts. According to Army officials, the government owns the work completed on ANS to date."
Date: August 2, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Civil Rights: Additional Actions in Pigford II Claims Process Could Reduce Risk of Improper Determinations (open access)

Civil Rights: Additional Actions in Pigford II Claims Process Could Reduce Risk of Improper Determinations

Correspondence issued by the Government Accountability Office with an abstract that begins ""
Date: December 7, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library
Coast Guard: Mission Performance Challenged by the Declining Condition and Rising Costs of its Legacy Vessel Fleet (open access)

Coast Guard: Mission Performance Challenged by the Declining Condition and Rising Costs of its Legacy Vessel Fleet

Testimony issued by the Government Accountability Office with an abstract that begins "From fiscal years 2005 through 2011, the physical condition of the Coast Guard's legacy vessels was generally poor. A primary Coast Guard measure of a vessel's condition--the operational percent of time free of major casualties--shows that the high endurance cutters, medium endurance cutters, and patrol boats generally remained well below target levels from fiscal years 2005 through 2011."
Date: September 20, 2012
Creator: United States. Government Accountability Office.
System: The UNT Digital Library