Low-Radioactivity-Level Waste Treatment. Part II: Pilot Plant Demonstration of the Removal of Activity from Low-Level Process Wastes by a Scavenging-Precipitation Ion-Exchange Process (open access)

Low-Radioactivity-Level Waste Treatment. Part II: Pilot Plant Demonstration of the Removal of Activity from Low-Level Process Wastes by a Scavenging-Precipitation Ion-Exchange Process

Report documenting the process of decontaminating low-activity fuel waste water via the Scavenging-Precipitation Ion-Exchange process. This includes analyses of the costs of the process as well as a description of the operation of the pilot plant.
Date: May 27, 1963
Creator: Brooksbank, R. E.; Browder, F. N.; Holcomb, R. R. & Whitson, W. R.
System: The UNT Digital Library
Preliminary Solution Critical Experiments for the High-Flux Isotope Reactor (open access)

Preliminary Solution Critical Experiments for the High-Flux Isotope Reactor

Report containing experiments conducted at the Oak Ridge National Laboratory's Critical Experiments Facility. These experiments involved "determining the critical parameters of the assembly with varying amounts of neutron absorber in the D20 reflector, measuring the relative neutron flux distribution for various conditions of reflector poison and fissile solution concentration, determining the ratio of the absolute thermal-neutron flux in the center of the assembly to the power in the fissile solution , and determining the effect on reactivity of reducing the hydrogen density in the central region of the assembly" (p. 1).
Date: June 12, 1963
Creator: Fox, J. K.; Magnuson, D. W. & Gilley, L. W.
System: The UNT Digital Library
Status Report Number Three on Clinch River Study (open access)

Status Report Number Three on Clinch River Study

Report describing the progress made in the Clinch River Study for the period May to October 1961. This report is based off of multiple reports of water sampling conducted across six stations in order to evaluate the safety and radioactive content of the Clinch River.
Date: December 6, 1962
Creator: Morton, R. J.
System: The UNT Digital Library
Evaluation of a Reduced Pressure Backflow Preventer Using Activation Analysis (open access)

Evaluation of a Reduced Pressure Backflow Preventer Using Activation Analysis

Report containing tests performed to evaluate a reduced pressure backflow preventer. This includes preliminary tests, resulting improvements, and final rests. Appendices begin on page 23.
Date: January 1963
Creator: Baird, Justus N., Jr.; Sanford, W. R. & Cristy, G. A.
System: The UNT Digital Library
Specifications and Procedures Used in Manufacturing U₃O₈-Aluminum Dispersion Fuel Elements for Core I of the Puerto Rico Research Reactor (open access)

Specifications and Procedures Used in Manufacturing U₃O₈-Aluminum Dispersion Fuel Elements for Core I of the Puerto Rico Research Reactor

Report containing the description and design of U₃O₈-Aluminum Dispersion Fuel Elements for Core I of the Puerto Rico Research Reactor. Topics include the requirements of core materials, materials specifications, manufacturing procedures, and shipping preparation.
Date: October 21, 1963
Creator: Kucera, W. J.; Leitten, C. F., Jr. & Beaver, R. J.
System: The UNT Digital Library
Evaluation of an Engineering Demonstration of the Modified Zirflex and Neuflex Processes for the Preparation of Solvent Extraction Feeds from Unirradiated Zirconium-Base Reactor Fuels (open access)

Evaluation of an Engineering Demonstration of the Modified Zirflex and Neuflex Processes for the Preparation of Solvent Extraction Feeds from Unirradiated Zirconium-Base Reactor Fuels

Report that investigates the concept of using ammonium fluoride-oxidant systems to dissolve spent U-Zr-Sn reactor fuels in both batch and continuous operation.
Date: March 1964
Creator: Kitts, F. G.
System: The UNT Digital Library
Development of Fabrication Procedures for Core B Fuel Elements for the Enrico Fermi Fast Breeder Reactor (open access)

Development of Fabrication Procedures for Core B Fuel Elements for the Enrico Fermi Fast Breeder Reactor

Report describing the "development procedures for fabricating the proposed Core B fuel element of the Enrico Fermi Fast Breeder Reactor" (p. 1). This includes a description of various components, reactor assembly, and reported conclusions. Appendices begin on page 57.
Date: 1964
Creator: Donnelly, R. G.; Thurber, W. C. & Slaughter, G. M.
System: The UNT Digital Library
Fuel Cycle Costs for a Plutonium Recycle System (open access)

Fuel Cycle Costs for a Plutonium Recycle System

Report containing the estimated costs of the chemical and metallurgical steps in plutonium recycling for large desalination reactors.
Date: January 20, 1964
Creator: Harrington, F. E.; Arnold, E. D.; Brater, D. C.; Douglas, D. A.; Smiley, S. H.; Stockdale, W. G. et al.
System: The UNT Digital Library
The High Flux Isotope Reactor: Volume 2, Selected Construction Drawings (open access)

The High Flux Isotope Reactor: Volume 2, Selected Construction Drawings

Report containing a series of drawings detailing the Oak Ridge National Laboratory's high flux isotope reactor, its surroundings, and its systems.
Date: August 1964
Creator: Binford, F. T.; Cramer, E. N. & Cramer, E. N.
System: The UNT Digital Library
Analytical Chemistry Division Annual Progress Report, December 31, 1960 (open access)

Analytical Chemistry Division Annual Progress Report, December 31, 1960

Report presenting research and development papers from the Oak Ridge National Laboratory's Analytical Chemistry Division.
Date: 1961
Creator: Oak Ridge National Laboratory
System: The UNT Digital Library
Analytical Chemistry Division Annual Progress Report, May 20, 1970 (open access)

Analytical Chemistry Division Annual Progress Report, May 20, 1970

Report presenting research and development papers from the Oak Ridge National Laboratory's Analytical Chemistry Division.
Date: September 1970
Creator: Oak Ridge National Laboratory
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1962 (open access)

Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1962

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile, low-power, nuclear power plant for Military field operation.
Date: August 17, 1962
Creator: Aerojet-General Corporation
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program Monthly Progress Report: April 1959 (open access)

Army Gas-Cooled Reactor Systems Program Monthly Progress Report: April 1959

Abstract: This monthly progress report covers the activities of the Army Gas-Cooled Reactor System Program for April 1959. The program includes a water-moderated heterogeneous reactor (Gas-Cooled Reactor Experiment I), a graphite-moderated homogeneous reactor (Gas-Cooled Reactor Experiment II), a mobile gas-cooled reactor (ML-1), and the coordination of the Gas Turbine Test Facility. [It reports] the progress of each project, the associated tests and data evaluation, the applicable design criteria, and the fabrication of reactor components" (p. 1).
Date: May 25, 1959
Creator: Aerojet-General Corporation
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: July 1 - September 30, 1963 (open access)

Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: July 1 - September 30, 1963

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Date: November 15, 1963
Creator: Aerojet-General Corporation
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: July 1 - December 31, 1959 (open access)

Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: July 1 - December 31, 1959

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Date: February 15, 1960
Creator: Aerojet-General Corporation
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1960 (open access)

Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1960

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Date: July 31, 1960
Creator: Aerojet-General Corporation
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: July 1 - December 31, 1960 (open access)

Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: July 1 - December 31, 1960

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Date: February 22, 1961
Creator: Aerojet-General Corporation
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963 (open access)

Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Date: February 15, 1963
Creator: Aerojet-General Corporation
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: July 1 - September 30, 1964 (open access)

Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: July 1 - September 30, 1964

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Date: November 13, 1964
Creator: Aerojet-General Corporation
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1964 (open access)

Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1964

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Date: February 15, 1965
Creator: Aerojet-General Corporation
System: The UNT Digital Library
Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1959 (open access)

Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: January 1 - June 30, 1959

Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile, low-power, nuclear power plant for Military field operation.
Date: July 31, 1959
Creator: Aerojet-General Corporation
System: The UNT Digital Library
The ORNL GCR-3, a 750-Mw(e) Gas-Cooled Clad-Fuel Reactor Power Plant : A Joint Design Study (open access)

The ORNL GCR-3, a 750-Mw(e) Gas-Cooled Clad-Fuel Reactor Power Plant : A Joint Design Study

Report documenting the design of the Oak Ridge National Laboratory Gas-Cooled Clad-Fuel Reactor Power Plant. This includes design criteria and parameters, costs, and descriptions of systems.
Date: 1963
Creator: Oak Ridge National Laboratory
System: The UNT Digital Library
Gas-Cooled Fast Reactor Concepts (open access)

Gas-Cooled Fast Reactor Concepts

Report describing the performance characteristics of gas-cooled fast reactors, which compare well with those of sodium-cooled fast reactors. With oxide fuel and helium, CO2, and SO2 coolant at pressures of 1000 to 1500 psia, the reactors have slightly higher breeding ratios than comparable sodium-cooled reactors.
Date: September 1964
Creator: Oak Ridge National Laboratory. Reactor Division. Gas-Cooled Reactor Project.
System: The UNT Digital Library
The High Flux Isotope Reactor: Volume 1, A Functional Description (open access)

The High Flux Isotope Reactor: Volume 1, A Functional Description

Report containing a description of the Oak Ridge National Laboratory's High-Flux Isotope Reactor (HFIR) and its operation.
Date: May 1964
Creator: Binford, F. T. & Cramer, E. N.
System: The UNT Digital Library