Collection
Serial/Series Title
Degree Department
Degree Level
Country
States
Decade
Month
Language
5,459 Matching Results
Results open in a new window/tab.
prev
Results:
5,449 - 5,459 of
5,459
Vibration and Collapse Testing of SM-2 Fuel Elements : January 1959 to January 1960
Experiments were conducted on SM-2 fuel elements to ascertain if flow-induced fuel plate vibrations are an inherent operating characteristic.
Date:
July 5, 1960
Creator:
Morehouse, D. J. & Christenson, J. A.
Object Type:
Report
System:
The UNT Digital Library
SM-2 Single Element Final Test Report
This report gives results of single element low pressure flow testing conducted on an SM-2 control rod assembly and stationary fuel element
Date:
October 28, 1960
Creator:
Krause, P. S.
Object Type:
Report
System:
The UNT Digital Library
Thermal Stress Testing of SM-2 Fuel Elements : Final Report January 1, 1959 to July 1, 1960
Thermal stress testing was performed on portions of reactor fuel elements.
Date:
September 20, 1960
Creator:
Christenson, J. A. & Kortheuer, J. D.
Object Type:
Report
System:
The UNT Digital Library
Summary of Reactor Design Information from Three Years Operation of a Small PWR
Reactor design information obtained from three years' operation of a small pressurized water reactor, the SM-1 (formerly APPR-1), presented and discussed
Date:
September 9, 1960
Creator:
Gallagher, J. G.
Object Type:
Report
System:
The UNT Digital Library
Structural Testing of SM-2 Fuel Elements
Ability of the originally designed SM-2 stainless steel fuel elements, of both tungsten inert gas (TIG) and electrical resistance welded construction, to withstand static transverse pressure gradients of normal reactor operation was investigated
Date:
September 29, 1960
Creator:
Coleman, F. G., Jr. & Herbert, R. J.
Object Type:
Report
System:
The UNT Digital Library
SM-1 Research and Development Quarterly Report : April 1 to June 30, 1960
This report covers research conducted at the SM-1 and highlights progress made in plant water chemistry and health physics practices and progress on individual tasks and test are reported
Date:
September 20, 1960
Creator:
Bergman, C. A.
Object Type:
Report
System:
The UNT Digital Library
Nuclear Analysis of Various Spert-III Critical Experiments
The calculational models employed in the nuclear analysis of the SM-2 were applied to various critical experiments performed upon the SPERT-III core
Date:
April 27, 1961
Creator:
Paluszkiewica, S.
Object Type:
Report
System:
The UNT Digital Library
Activity Build-Up Control by High pH Coolant : A Literature Survey
A survey was made of unclassified literature dealing with the control of activity buildup in pressurized water reactors by high pH coolants
Date:
January 23, 1961
Creator:
Bergen, C. R.
Object Type:
Report
System:
The UNT Digital Library
Preliminary Report of Uranium Favorability of the San Rafael Swell Area, East-Central Utah
Preliminary copy of a report on uranium availability in the San Rafael Swell Area in Utah in addition to supplementary data containing locations of mines, test wells and geologic maps of the San Rafael Swell Area.
Date:
October 1977
Creator:
Mickle, David G.; Jones, C. A.; Gallagher, G. L.; Young, Patti. & Dubyk, W. S.
Object Type:
Report
System:
The UNT Digital Library
The Design, Installation, and Testing of the Gas-Cooled Reactor UO₂ Irradiation Experiment at the NRTS
Report regarding sixteen experiments performed with a miniature re-entrant gas loop. Includes design problems and difficulties encountered, as well as their solutions.
Date:
September 8, 1961
Creator:
Porter, E. H.
Object Type:
Report
System:
The UNT Digital Library
Uranium Favorability of the San Rafael Swell Area, East-Central Utah
Purpose and scope: The purpose of this study was to delineate new areas favorable for uranium exploration in the San Rafael Swell region of east-central Utah. Emphasis was placed on the sandstone and siltstone members of the lower Chinle Formation (Triassic) and on the Salt Wash and Brushy Basin Members of the Morrison Formation (Jurassic). The White Rim Sandstone (Permian) was also studied, but not extensively. This project began in January 1976 and was completed in March 1977. Field work was conducted during the five-month period from February through June 1976.
Date:
October 1977
Creator:
Mickle, David G.; Jones, C. A.; Gallagher, G. L.; Young, Patti. & Dubyk, W. S.
Object Type:
Report
System:
The UNT Digital Library