Two-Phase Pressure Losses Quarterly Progress Report: Eighth Quarter, November 12, 1963 - February 11, 1964 (open access)

Two-Phase Pressure Losses Quarterly Progress Report: Eighth Quarter, November 12, 1963 - February 11, 1964

Technical report describing that voids were measured in a ½-inch by 1-3/4-inch channel with the S-1 insert (B(0)/B(1) = 0.4, L(0) = 0.1 inch), at 2 inches ahead of the insert (position A), ½-inch past the insert (position B), 5 inches past (position C), and 12 inches past (position D). The conditions were: P – 1000 psia, G = 1.00 x 10(6) lb/h-ft(2), and x = 18.8 percent. Average void and void distribution at position A are the same as for flow in a straight channel. Void distribution at position B shows that the stagnation region downstream of the inserts contains a high fraction of voids. Average void and void distribution at positions C and d show that the two-phase mixture becomes strongly mixed (homogenized) as a result of passing through he contraction-expansion inserts. Distribution at position D approaches the distribution at position A; i.e., the straight channel distribution.
Date: March 1, 1964
Creator: Janssen, E. (Engineer) & Kervinen, J. A.
System: The UNT Digital Library
Hazards Report for the SM-1 Core II With Special Components (open access)

Hazards Report for the SM-1 Core II With Special Components

Abstract: This technical report describes the changes incurred in the SM-1 by the insertion of the SM-1 Core II and special components. The special components consist of impact specimens, a boron gradient rod, SM-2 elements, a PM-1-M element, and high burnup SM-1 Core I elements. The change in hazards, due to operation of SM-1 with Core II and the special components is evaluated. The analysis indicates there is no change in hazards.
Date: March 30, 1961
Creator: Coombe, J.; Lee, D.; Segalman, I. & Robertson, R.
System: The UNT Digital Library
Hazards Report for SM-1 Core II With the SM-1 Core II With the Silver-Cadmium-Indium Control Rod Absorber Section (open access)

Hazards Report for SM-1 Core II With the SM-1 Core II With the Silver-Cadmium-Indium Control Rod Absorber Section

Abstract: In the March-April 1962 shutdown of SM-1 Core II, the SM-28 element will be re-inserted in SM-1 Core II and an SM-1 Core I element will be removed. An SM-1 Core II europium absorber will be replaced by a Ag-Cd-In absorber, and surveillance specimens will be inserted above the core support structure. Analysis of these changes concludes that re-insertion of the SM-2B stationary element and insertion of surveillance specimens do not affect hazards potential previously defined for SM-1. Replacement of the europium absorber by the Ag-Cd-In absorber will have negligible effect on reactivity control worth of the rod. The absorber meat section is encapsulated to prevent exposure of silver alloy to the primary coolant; postulated release of silver due to a cladding defect, after 2 years irradiation in SM-1, would not cause a hazard such as to restrict access to the vapor container. Possibility of steam formation in the air gap between the absorber core and cladding, causing a cladding failure, is remote. Deformation of the absorber section sufficient to cause the rod to stick, would not impair the ability of the other rods to shut down the reactor safely.
Date: March 15, 1962
Creator: Stephenson, L. D.
System: The UNT Digital Library
AEC Fuel Cycle Program Design and Fabrication of Special Assembly 9-L : Irradiation Performance Test of UO2-Cermet Fuel (open access)

AEC Fuel Cycle Program Design and Fabrication of Special Assembly 9-L : Irradiation Performance Test of UO2-Cermet Fuel

Technical report describing a UO2-Mo cermet fuel assembly fabricated for long-term irradiation performance testing in the Vallecitos Boiling water Reactor. The design and fabrication histories of this assembly are described and pre-irradiation data on each individual rod are presented. Molybdenum was added to improve the bulk thermal conductivity of the fuel, so that fuel temperatures would remain comparatively low during high-power level operation of the fuel element. The molybdenum was incorporated into the compacts either as fibers or as a thin coating on individual UO2 particles. Fuel pellets were produced from these materials by vacuum hot pressing. The distribution of the molybdenum in both types of cermet fuels appeared favorable to good heat transfer. The fibers were oriented predominantly in the radial planes of the pellet as a result of the uni-directional compaction during the hot-pressing operation. In the pellets made from the coated particles, a continuous network of molybdenum occurred as a result of the coating welding together during the hot-pressing operation. The test assembly contains eight fuel rods; three contain UO2-Mo cermet, three contain the cermet produced from the coated particles, and two are for reference and contain the conventional sintered UO2 pellet fuel. The nominal outside diameter …
Date: March 1964
Creator: Ogawa, S. Y.
System: The UNT Digital Library
Accurate Nuclear Fuel Burnup Analyses; Ninth Quarterly Progress Report, (December 1963 - February 1964) (open access)

Accurate Nuclear Fuel Burnup Analyses; Ninth Quarterly Progress Report, (December 1963 - February 1964)

The objective of the Accurate Nuclear Fuel Burnup Analyses program is to develop more accurate methods for burnup analysis for general use than the current method of analysis of Ca-137 or Sr-90. The program will require from three to five years of effort.
Date: March 1, 1964
Creator: Rider, B. F.; Peterson, J. P., Jr.; Ruiz, C. P. & Smith, F. R.
System: The UNT Digital Library
Preliminary Technical Report SM-1 Core III with Type 3 Elements (open access)

Preliminary Technical Report SM-1 Core III with Type 3 Elements

Abstract: This preliminary technical report covers design of the SM Type 3 element, its use .in.. SM-1 Core III, and planned use in the Type 3 Core for PM-2A. The Type:3 element characteristics are compared with Type 1 (SM-1 Core I) element nuclear, metallurgical, thermal and hydraulic characteristics and fabrication. The effect of using the Type 3 element in SM-1 Core III and. its planned use in a Type 3 Core for PM-2A is discussed with regard to operation, shielding, reactor safety and all conceivable special problems.
Date: March 30, 1962
Creator: Inglima, J. N.; Beam, R. H.; Davidson, S. L. & Edgar, E. C.
System: The UNT Digital Library
PL-3 Phase I Task 3 Research and Development Report (open access)

PL-3 Phase I Task 3 Research and Development Report

Abstract: This technical report summarizes the results of research and development tasks performed during Phase I of this contract and presents recommendations for future development work. Work is reported in the areas of plant assembly and relocation, housings and footings, waste heat dissipation, instrumentation, refueling systems, waste disposal, shielding, core nuclear thermal and hydraulic studies, gaseous waste processing (BWR), and critical experiments on a 5 x 5 array of Type 3 fuel elements.
Date: March 12, 1962
Creator: Humphries, G. E.
System: The UNT Digital Library
Startup Testing of the PM-2A Nuclear Power Plant (open access)

Startup Testing of the PM-2A Nuclear Power Plant

Abstract: A detailed description of the PM-2A reactor, primary system and instrumentation is presented. A general description of the secondary system and plant arrangement at Camp Century, Greenland is included. The results of the startup physics, shielding, thermal and hydraulics and radiochemistry test are presented. the analysis performed on the shielding and thermal and hydraulic tests is included. The shielding problem at startup and the shielding modification made to the plant are described along with the radiation measurements made in these areas.
Date: March 31, 1962
Creator: McCool, W. J.; Ryan, R. M.; Richards, W. M. S.; Bradley, P. L.; Stephenson, L. D. & Cox, J. F.
System: The UNT Digital Library
SM-1 Reactor Vessel Closure Stud Investigation (open access)

SM-1 Reactor Vessel Closure Stud Investigation

Abstract: This report presents metallurgical .analyses and corrosion tests conducted to determine :causes of failure of two SM- 1 reactor vessel studs due to fracture in the threaded areas, after 23 months' operation (March 1959). Conclusions of corrosion tests are: (1) failure of the studs was caused by stress corrosion cracking, (2) contributing factors to failure of the studs were improper control of heat treatment of the studs and absence of treatment for stress relief after thread grinding operation.
Date: March 23, 1962
Creator: Reali, D. L.
System: The UNT Digital Library
Shielding Measurements at the SM-1 Reactor : June 1961 (open access)

Shielding Measurements at the SM-1 Reactor : June 1961

Abstract: Neutron flux and gamma radiation measurements through the SM-1 primary shield were made at the startup of Core II in June 1961. They extend previous measurements (APAE-35) both vertically and horizontally in the primary shield and in the rod drive pit. Dose rate measurements on spent fuel elements under water are also reported.
Date: March 16, 1962
Creator: Moote, F. G. & Obrist, C. H.
System: The UNT Digital Library
Zero Power Experiments for the SM-1 Core II : Task XV (open access)

Zero Power Experiments for the SM-1 Core II : Task XV

Abstract: An element by element reactivity check for SM-1 Core II fuel elements and control rod absorber sections was performed and the burnable nuclear poison loading in the SM-1 Core II stationary fuel elements was established. An approach to criticality of the SM-1 Core II was performed by the inverse multiplication method and the critical rod bank position obtained as a function of fuel loading up to the full SM-1 Core II loading. Maximum and minimum core reactivity measurements were obtained by selective loading of stationary fuel elements and the total "excess K" for the core established. Power distribution measurements in the region of the core-reflector interface and the fuel-absorber interface in the control rod assemblies were performed. The effectiveness of europium flux suppressors in the top of control rod fuel elements and the power peaking in stationary elements adjacent to water gaps in control rod assemblies were measured. Survey measurements established the worth of spiking cold clean SM-1 cores with SM-2 elements, and of water holes in the SM-1 core which might be utilized as flux traps for materials irradiation.
Date: March 15, 1960
Creator: Robinson, R. A.; Weiss, S. H.; McCool, W. J. & Schrader, E. W.
System: The UNT Digital Library