Technical Activities Report for April 1953 (open access)

Technical Activities Report for April 1953

Two xenon extraction runs were made this month. It appears that a small design change in Trap #2 will be necessary so that a dry ice-trichloroethylene slurry can be used for coolant rather than liquid freon. For each of the runs this month the enriched generator was exposed for four hours in the est pile operating at 100 watts. A period of eight hours for cooling and xenon builidup was allowed before the collection and separation runs were started.
Date: May 4, 1953
Creator: Faulkner, J. E.; Davenport, D. E. & Duvall, G. E.
System: The UNT Digital Library