Oak Ridge National Laboratory Vertical Tube Evaporator Pilot Plant Annual Report for Fiscal Year 1970 (open access)

Oak Ridge National Laboratory Vertical Tube Evaporator Pilot Plant Annual Report for Fiscal Year 1970

From Introduction: "This report covers the work done in fiscal 1970 and the small amount of work done in the early part of fiscal 1971; the inclusive dates covered are July 1, 1969 through July 10, 1970. A four effect VTE train operating in the downflow mode. A single effect VTE unit operating in the downflow mode. A mixed phase high pressure water and steam jet compression unit complete with a boiler to supply high pressure motive steam."
Date: October 1970
Creator: Stearns-Roger Corporation
System: The UNT Digital Library
Third Report on Horizontal-Tube Multiple-Effect Process Pilot Plant Tests (open access)

Third Report on Horizontal-Tube Multiple-Effect Process Pilot Plant Tests

From Summary: "This report describes the continuing work on HTME distillation plants, the first portions of which were reported in References 1 and 2. A major purpose in the testing of the three-effect pilot plant was to demonstrate mutiple-effect operability of the the horizontal tube method, when utilizing basically the same construction methods and materials as those proposed for commercial HTME plants."
Date: October 1971
Creator: Matta, G. A.; Karpf, J. Z.; Pascale, A. S. & Cardello, J. A.
System: The UNT Digital Library