Resource Type
Collection
Serial/Series Title
Atomic Energy Commission Reports
3
Report (U.S. Atomic Energy Commission)
2
AEC research and development report
1
BAW (Series)
1
Babcock & Wilcox Company Reports
1
Civil Effects Test Operations Reports
1
NSRDS-NBS
1
National Bureau of Standards Reports
1
North American Aviation Reports
1
Notes of Monthly Component Test Program Review Meeting Held with SNPO at WANL
1
6 More
Country
98 Matching Results
Results open in a new window/tab.
THE EFFECTS OF AGING ON DISSIMILAR METAL WELDED JOINTS WITH MULTIPASS WELDING OF HASTELLOY X AND HASTELLOY W FILLER METAL
None
Date:
July 1, 1966
Creator:
Ireland, D.R.
Object Type:
Report
System:
The UNT Digital Library
ELK RIVER REACTOR OPERATIONS ANALYSIS PROGRAM. SPENT FUEL SHIPPING CASK CRITICALITY ANALYSIS: TASK 617
None
Date:
July 1, 1966
Creator:
Kendrick, E.D. Jr.
Object Type:
Report
System:
The UNT Digital Library
ETS-1 data acquisition system accuracy test specification
None
Date:
July 1, 1966
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Evaluation of alternate controls for the technology engine
None
Date:
July 1, 1966
Creator:
Kornfeld, E.L.
Object Type:
Report
System:
The UNT Digital Library
Evaluation of process variables in the cation exchange recovery of plutonium from 234-5 building sump water
A previously reported cation exchange process for the recovery of Pu from sump water was studied in order to improve the procedure. The flowsheet calls for adjustment to 0.03M HNO/sub 3/, the addition of NH/sub 4/HSO/sub 3/ for Pu reduction, the addition of Al/sup 3 +/ to complex F/sup -/, followed by passage of the solution through a column of Dowex 50W, X-8 resin. Distribution coefficients were measured between the resin and synthetic sump solutions under a variety of possible simulated flowsheet conditions. By far the highest distribution coefficients were obtained with Pu(III) without the addition of Al. Results with Pu(IV) varied from borderline to unsatisfactory depending on conditions. It is concluded that the process will be satisfactory if the Al addition is eliminated. (JGB)
Date:
July 29, 1966
Creator:
Ryan, J. L.
Object Type:
Report
System:
The UNT Digital Library
Evaluation of test results for strain gages and pressure transducers. Ground test reactor (GTR) irradiation test No. 15
None
Date:
July 1, 1966
Creator:
Sita, E. R.
Object Type:
Report
System:
The UNT Digital Library
Evaluation of Thorium Fuels for the Heavy Water Organic Cooled Reactor
From abstract: "A summary of work done by The Babcock & Wilcox Company to evaluate thorium fuels for the Heavy Water Organic Cooled Reactor (HWOCR)."
Date:
July 1966
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
Exact Semiclassical Calculations of Translational-Vibrational Energy Transfer
We present "exact" calculations, by the semiclassical method, of vibrational excitation of a harmonic diatomic molecule A-B, in its ground vibrational state, upon collinear collision with an atom C. Results are compared with those of first-order quantum mechanical time dependent perturbation methods and those of purely classical methods.
Date:
July 22, 1966
Creator:
Kelley, J. Daniel & Wolfsberg, Max
Object Type:
Report
System:
The UNT Digital Library
Experimental investigations for design of subcritical water-immersed SNAP reactors
None
Date:
July 28, 1966
Creator:
Heneveld, W. H.
Object Type:
Report
System:
The UNT Digital Library
Experimental Radiation Measurements in Conventional Structures: Part 1, Radiation Measurements in Two Two-Story and Three One-Story Typical Residential Structures Before and After Modification
Report discussing the methods, data, and analysis of results for "An experimental study designed to provide a basis for estimating protection against fallout radiation " (p. v) using one- and two-story structures with basements.
Date:
July 1966
Creator:
Burson, Z. G.
Object Type:
Report
System:
The UNT Digital Library
Feasibility Study of a 1000-Mwe Sodium-Cooled Fast Reactor: Volume 1 - Technical and Economic Potential
From abstract: The results of a feasibility study of a 1000-Mwe sodium-cooled fast-reactor are presented.
Date:
July 1966
Creator:
Eggen, D. T.; Cochran, J. C. & Gibson, A. S.
Object Type:
Report
System:
The UNT Digital Library
Fields Produced by Elliptical Current Sheets
None
Date:
July 1, 1966
Creator:
Beth, R. A.
Object Type:
Report
System:
The UNT Digital Library
FISSION CROSS SECTION OF $sup 241$Pu FROM 0.01 ev TO 0.5 ev
None
Date:
July 1, 1966
Creator:
Watanabe, T.
Object Type:
Report
System:
The UNT Digital Library
Fundamental Investigation of Liquid-Metal Lubricated Journal Bearings. Quarterly Technical Report No. 7, April 1-July 1, 1966. Report No. RS-487
None
Date:
July 1, 1966
Creator:
Burton, R. A. & Hsu, Y. C.
Object Type:
Report
System:
The UNT Digital Library
Generalized Hartree-Fock Calculation for Zr^90 using an Effective Interaction
None
Date:
July 22, 1966
Creator:
Waghmare, Y.R.; Shakin, C.M. & Svenne, J.P.
Object Type:
Report
System:
The UNT Digital Library
Growth of Phase Space in High Intensity Proton Beams Due to Nonuniform Radial Charge Distribution
None
Date:
July 28, 1966
Creator:
Turner, C. M. & Bennett, G. W.
Object Type:
Report
System:
The UNT Digital Library
Guidebook for Field Trips to the Nevada Test Site
This report was formed after the study of the Nevada Test Site to examine parts of the thick miogeosynclinical section of the Paleozoic rocks and post-Paleozoic structural features for the sole purpose of determining the walking stops for future field trips to the test site.
Date:
July 21, 1966
Creator:
Christiansen, Robert L.; Poole, F. G.; Barnes, Harley; Orkild, Paul P.; Byers, F. M., Jr.; Carr, Wilfred James et al.
Object Type:
Report
System:
The UNT Digital Library
Hanford Atomic Products Department. Monthly report, June 1966
The programmed long outage which started May 1 was concluded on June 6. During this outage, the sixth heat exchanger cell was tied in, the auxiliary steam boiler was completely overhauled, four steam generators were equipped with isolation valves, extensive replacements of the process tube resistance temperature detectors were made, the reactor was re-orificed, a leaking reactor gas seal was repaired, extensive preventive maintenance was done, and numerous smaller pieces of work were accomplished. After startup, testing of the WPPSS generating station equipment was resumed. Electric power up to 320 Mw was generated, generator trip-offs were executed, and data on the reactor plant response were taken. Both the generating station and the reactor plant behaved excellently. The sixth cell installations performed as designed. Electrical power generation is now limited to about 400 Mw by the unavailability of a step down transformer on the BPA system at Vantage. Elevation of the generated power level to the rated 800 Mw will be possible in the early autumn when transformer delivery is expected by BPA. Three scrams from relatively low power levels occurred during the June 6 startup, which may be regarded as being associated with returning the plant to service after a …
Date:
July 10, 1966
Creator:
unknown
Object Type:
Report
System:
The UNT Digital Library
High-Energy Particle Data. Volume 4. Range-Momentum and Dp/Dx Plots of Charged Particles in Matter
None
Date:
July 1, 1966
Creator:
Trower, W. P.
Object Type:
Report
System:
The UNT Digital Library
High-Energy Particle Data. Volume Ii. Range-Energy and De/Dx Plots of Charged Particles in Matter
None
Date:
July 1, 1966
Creator:
Trower, W. P.
Object Type:
Report
System:
The UNT Digital Library
High-Temperature Testing and Evaluation of Graphite Helical-Screw Expanders and Compressors
None
Date:
July 6, 1966
Creator:
Wells, W. M.; Hanner, D. W.; McElroy, J. L. & Robinson, E.
Object Type:
Report
System:
The UNT Digital Library
IMPROVED POSTIRRADIATION STRESS-RUPTURE PROPERTIES OF HASTELLOY X-280
None
Date:
July 1, 1966
Creator:
Levy, I.S.
Object Type:
Report
System:
The UNT Digital Library
Leachability of Alumina Calcine Produced in the Idaho Waste Calcining Facility
None
Date:
July 1, 1966
Creator:
Paige, B. E.
Object Type:
Report
System:
The UNT Digital Library
Neutron-Proton Elastic Scattering From 1 to 6.3 Gev
None
Date:
July 1, 1966
Creator:
Kreisler, M. N.
Object Type:
Report
System:
The UNT Digital Library