Serial/Series Title
5 Matching Results
Results open in a new window/tab.
Results:
1 - 5 of
5
Effect of Process Variables on Graphite Purity
Results of four experimental heats run at the end of the G-5 contract in the National Carbon Company Clarksburg production furnaces.
Date:
July 20, 1954
Creator:
Riley, W. C. & Corners, A. M.
System:
The UNT Digital Library
Joint Design for Making Root Pass Welds without Filler Material
Investigation to evaluate some of the designs, techniques, and methods for fabrication of a root pass.
Date:
July 9, 1956
Creator:
Lemon, L. C. & Smith, W. R.
System:
The UNT Digital Library
Fabrication of the PRTR Zircaloy-2 High Pressure Process Tubes
Development of a fabrication process and the manufacture of 95 PRTR process tubes demonstrates that the commercial fabrication of high quality Zircaloy-2 pressure tubing is feasible.
Date:
July 31, 1959
Creator:
Knecht, R. L.
System:
The UNT Digital Library
Program Study Report Plutonium Fuel Cycle
From introduction: "The development and demonstration of the natural uranium reprocessed plutonium cycle in power reactors is an important phase of the peaceful applications of nuclear energy."
Date:
July 30, 1956
Creator:
Albaugh, F. W. & Fryar, R. M.
System:
The UNT Digital Library
Standardization and Evaluation of Grain Size Test for Uranium Fuel
Report that "describes the selection of "standard fuel cores for calibrating an ultrasonic tester designated UT-2C" (p. 3) at Hanford Laboratories.
Date:
July 1964
Creator:
Spice, R. D.
System:
The UNT Digital Library