Preliminary Design Requirements Argonne Boiling Reactor (ARBOR) Facility (open access)

Preliminary Design Requirements Argonne Boiling Reactor (ARBOR) Facility

From Introduction: "Descriptions of the functional requirements of the facility, together with preliminary concepts of methods for meeting them, are presented in this prospectus."
Date: July 15, 1957
Creator: Fromm, L. W.; Bernsen, S. A.; Bullinger, C. F. & Matousek, J. F.
System: The UNT Digital Library