Study of Remote Military Power Applications: Report 5, NORAD (open access)

Study of Remote Military Power Applications: Report 5, NORAD

From introduction: The study is essentially an economic evaluation of the construction and operation of nuclear power plants at several designated military installations where increased power generating capabilities of 5 to 40 mwe may be required by the Government during the period 1963 through 1970.
Date: July 1960
Creator: unknown
System: The UNT Digital Library
Artificial-Recharge Tests in Upper Black Squirrel Creek Basin, Jimmy Camp Valley, and Fountain Valley, El Paso County, Colorado (open access)

Artificial-Recharge Tests in Upper Black Squirrel Creek Basin, Jimmy Camp Valley, and Fountain Valley, El Paso County, Colorado

Abstract: Nine artificial-recharge pits were excavated in the alluvium in upper Black Squirrel Creek basin, Jimmy Campy Valley, and in the alluvium overlying the Widefield aquifer in Fountain Valley. Each artificial-recharge site was instrumented to measure inflow, stage fluctuations, and water-table fluctuations. Artificial-recharge tests conducted in upper Black Squirrel Creek basin indicated that the average adjusted rates of infiltration for the three sites ranged from 1.6 to 2.4 feet (0.5 to 0.7 meter) per day. Tests conducted in Jimmy Camp Valley indicated that the average adjusted rates of infiltration for the two sites ranged from 3.8 to 24.7 feet (1.2 to 7.5 meters) per day. Tests conducted on the Widefield aquifer indicated that the average adjusted rates of infiltration for four sites ranged from 2.3 to 12.9 feet (0.7 to 3.9 meters) per day.
Date: July 1977
Creator: Emmons, Patrick J.
System: The UNT Digital Library