Tank characterization report for double-shell tank 241-AW-105 (open access)

Tank characterization report for double-shell tank 241-AW-105

One of the major functions of the Tank Waste Remediation System (TWRS) is to characterize wastes in support of waste management and disposal activities at the Hanford Site. Analytical data from sampling and analysis, along with other available information about a tank, are compiled and maintained in a tank characterization report (TCR). This report and its appendices serve as the TCR for double-shell tank 241-AW-105. The objectives of this report are to use characterization data in response to technical issues associated with tank 241-AW-105 waste; and to provide a standard characterization of this waste in terms of a best-basis inventory estimate. The response to technical issues is summarized in Section 2.0, and the best-basis inventory estimate is presented in Section 3.0. Recommendations regarding safety status and additional sampling needs are provided in Section 4.0. Supporting data and information are contained in the appendices. This report supports the requirements of the Hanford Federal Facility Agreement and Consent Order milestone Characterization. information presented in this report originated from sample analyses and known historical sources. While only the results of a recent sampling event will be used to fulfill the requirements of the data quality objectives (DQOs), other information can be used to …
Date: June 5, 1997
Creator: Sasaki, L. M.
Object Type: Report
System: The UNT Digital Library
Conceptual design report, TWRS Privatization phase I, raw and potable water, subproject W-504 (open access)

Conceptual design report, TWRS Privatization phase I, raw and potable water, subproject W-504

This document includes Conceptual Design Report (CDR) for extension of existing Raw and Potable systems from 200-East Area systems to two new private contractor facilities for immobilization and disposal of low-activity waste (LAW). The work will include design and installation of almost 3400 m (11,200 ft) of raw water pipe and 2200 in (7,300 ft) of potable water pipe.
Date: June 5, 1997
Creator: Singh, G.
Object Type: Report
System: The UNT Digital Library
Tank 241-AN-104, cores 163 and 164 analytical results for thefinal report (open access)

Tank 241-AN-104, cores 163 and 164 analytical results for thefinal report

This document is the analytical laboratory report for tank 241-AN-104 push mode core segments collected between August 8, 1996 and September 12, 1996. The segments were subsampled and analyzed in accordance with the Tank 241-AAr-1 04 Push Mode Core Sampling and Analysis Plan (TSAP) (Winkleman, 1996), the Safety Screening Data Quality Objective (DQO) (Dukelow, et at., 1995) and the Flammable Gas Data Quality Objective (DQO) (Benar, 1995). The analytical results are included in a data summary table. None of the samples submitted for Differential Scanning Calorimetry (DSC), Total Alpha Activity (AT), Total Organic Carbon (TOC) and Plutonium analyses (239,240 Pu) exceeded notification limits as stated in the TSAP. The statistical results of the 95% confidence interval on the mean calculations are provided by the Tank Waste Remediation Systems Technical Basis Group in accordance with the Memorandum of Understanding (Schreiber, 1997) and not considered in this report.
Date: June 5, 1997
Creator: Steen, F. H.
Object Type: Report
System: The UNT Digital Library
Investigation of moisture-induced embrittlement of iron aluminides. Final report (open access)

Investigation of moisture-induced embrittlement of iron aluminides. Final report

Iron-aluminum alloys with 28 at.% Al and 5 at.% Cr were shown to be susceptible to hydrogen embrittlement by exposure to both gaseous hydrogen and water vapor. This study examined the effect of the addition of zirconium and carbon on the moisture-induced hydrogen embrittlement of an Fe{sub 3}Al,Cr alloy through the evaluation of tensile properties and fatigue crack growth resistance in hydrogen gas and moisture-bearing air. Susceptibility to embrittlement was found to vary with the zirconium content while the carbon addition was found to only affect the fracture toughness. Inherent fatigue crack growth resistance and fracture toughness, as measured in an inert environment, was found to increase with the addition of 0.5 at.% Zr. The combined addition of 0.5 at.% Zr and carbon only increased the fracture toughness. The addition of 1 at.% Zr and carbon was found to have no effect on the crack growth rate when compared to the base alloy. Susceptibility to embrittlement in moisture-bearing environments was found to decrease with the addition of 0.5 at.% Zr. In gaseous hydrogen, the threshold value of the Zr-containing alloys was found to increase above that found in the inert environment while the crack growth resistance was much lower. By …
Date: June 5, 1997
Creator: Alven, D. A. & Stoloff, N.S .
Object Type: Report
System: The UNT Digital Library
Office of Inspector General report on audit of renovation and new construction projects at Lawrence Livermore National Laboratory (open access)

Office of Inspector General report on audit of renovation and new construction projects at Lawrence Livermore National Laboratory

The Oakland Operations Office (Oakland) is responsible for acquiring facilities needed to satisfy mission needs and to do so at the least cost to the Department of Energy (Department). The objective of the audit was to determine if proposed renovation and new construction projects at the Lawrence Livermore National Laboratory (Livermore) met mission needs while minimizing cost to the Government. In pursuing three projects, estimated to cost over $78 million, Livermore had not demonstrated that it had selected the best alternatives for meeting the Department`s needs while minimizing cost. Livermore was able to pursue these projects because Oakland did not ensure that the laboratory had performed cost and benefit analyses of all alternatives. Further, Oakland did not establish benchmarks to assess the reasonableness of the total costs of designing, constructing, and managing these projects. As a result, it was likely that the Department was spending more than necessary on renovation and new construction projects at Livermore. Although the projects met mission needs, it was recommended that the Manager, Oakland: (1) require Livermore to perform analyses of expected costs and benefits for alternatives; (2) evaluate the adequacy of Livermore`s cost and benefit analyses of alternatives; (3) establish benchmarks based on industry …
Date: June 5, 1997
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Conceptual design report, TWRS Privatization Phase I, Liquideffluent transfer systems, subproject W-506 (open access)

Conceptual design report, TWRS Privatization Phase I, Liquideffluent transfer systems, subproject W-506

This document includes Conceptual Design Report (CDR) for providing liquid effluent lines for routing waste from two Private Contractor (PC) facilities to existing storage, treatment, and disposal facilities in the 200-East Area.
Date: June 5, 1997
Creator: Singh, G.
Object Type: Report
System: The UNT Digital Library
Technical oversight for installation of TNX piezometers, Final Report (open access)

Technical oversight for installation of TNX piezometers, Final Report

Science Applications International Corporation was tasked under subcontract C002025P to provide technical oversight for the drilling of one pilot borehole, and the drilling and installation of five piezometers in the TNX Area Swamp. The work was performed in accordance with the Statement of Work in Task Order Proposal No. ER39-129 dated August 6, 1996. This report describes the activities associated with the performance of the task.
Date: June 5, 1997
Creator: Pidcoe, W.W. Jr.
Object Type: Report
System: The UNT Digital Library
DOE integrated safeguards and security (DISS) system a nation-wide distributed information system for personnel security (open access)

DOE integrated safeguards and security (DISS) system a nation-wide distributed information system for personnel security

DISS uses secure client-server and relational database technology across open networks to address the problems of security clearance request processing and tracking of security clearances for the Department of energy. The system supports the entire process from data entry by the prospective clearance holders through tracking of all DOE clearances, and use of standard DOE badges in automated access control systems throughout the DOE complex.
Date: June 5, 1997
Creator: Block, B.
Object Type: Article
System: The UNT Digital Library
Fabrication process for the PEP II RF cavities (open access)

Fabrication process for the PEP II RF cavities

This paper presents the major steps used in the fabrication of the 26 RF Cavities required for the PEP-II B-factory. Several unique applications of conventional processes have been developed and successfully implemented: electron beam welding (EBW), with minimal porosity, of .75 inch (19 mm) copper cross-sections; extensive 5-axis milling of water channels; electroplating of .37 inch (10 mm) thick OFE copper; tuning of the cavity by profiling beam noses prior to final joining with the cavity body; and machining of the cavity interior, are described here.
Date: June 5, 1997
Creator: Franks, R.M.; Rimmer, R.A. & Schwarz, H.
Object Type: Article
System: The UNT Digital Library
Conceptual design report, TWRS Privatization Phase I, site development and roads, subproject W-505 (open access)

Conceptual design report, TWRS Privatization Phase I, site development and roads, subproject W-505

This document includes Conceptual Design Report (CDR) for the site development, construction of new roads and improvements at existing road intersections, habitat mitigation, roadway lighting, and construction power needed for the construction of two Private Contractor (PC) Facilities. Approximately 50 hectare (124 acres) land parcel, east of the Grout Facility, is planned for the PC facilities.
Date: June 5, 1997
Creator: Singh, G.
Object Type: Report
System: The UNT Digital Library
Office of Inspector General report on audit of proposal to acquire land at the Fernald Environmental Management Project (open access)

Office of Inspector General report on audit of proposal to acquire land at the Fernald Environmental Management Project

The US Department of Energy (Department) obtained an appraisal and developed a cost estimate to acquire 78 to 100 acres of privately-held land adjoining the Fernald Environmental Management Project (FEMP) as an additional buffer for a waste disposal facility. The objective of this audit was to determine whether the proposed purchase of land was essential to support the site`s mission. The Department obtained an appraisal and developed a cost estimate to acquire the additional land without confirming that av lid need for the land existed. If the land is acquired, the Department could spend between $655,000 and $2.2 million unnecessarily. Additionally, the Department could incur unnecessary maintenance and security costs to maintain the land after acquisition. It was recommended that the Manager, Ohio Field Office, dismiss the proposal to acquire the additional land. Management agreed with the recommendation, stating that the acquisition could not be justified at this time. However, management did not agree with the finding that the Department obtained an appraisal and developed a cost estimate without confirming that a valid need for the land existed. Management stated that the appraisal and cost estimate were principal and necessary to determining whether a need for the land existed. It …
Date: June 5, 1997
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Probability analysis of MCO over-pressurization during staging (open access)

Probability analysis of MCO over-pressurization during staging

The purpose of this calculation is to determine the probability of Multi-Canister Overpacks (MCOs) over-pressurizing during staging at the Canister Storage Building (CSB). Pressurization of an MCO during staging is dependent upon changes to the MCO gas temperature and the build-up of reaction products during the staging period. These effects are predominantly limited by the amount of water that remains in the MCO following cold vacuum drying that is available for reaction during staging conditions. Because of the potential for increased pressure within an MCO, provisions for a filtered pressure relief valve and rupture disk have been incorporated into the MCO design. This calculation provides an estimate of the frequency that an MCO will contain enough water to pressurize beyond the limits of these design features. The results of this calculation will be used in support of further safety analyses and operational planning efforts. Under the bounding steady state CSB condition assumed for this analysis, an MCO must contain less than 1.6 kg (3.7 lbm) of water available for reaction to preclude actuation of the pressure relief valve at 100 psid. To preclude actuation of the MCO rupture disk at 150 psid, an MCO must contain less than 2.5 kg …
Date: June 5, 1997
Creator: Pajunen, A.L.
Object Type: Report
System: The UNT Digital Library
Analysis of Enriched Uranium and Weapons Plutonium Reloads for PWRs Using BRACC (open access)

Analysis of Enriched Uranium and Weapons Plutonium Reloads for PWRs Using BRACC

Comparisons of the multicycle results demonstrate that the correlation coefficients based on the CASMO3 data were implemented correctly and that the Linear Reactivity Model is acceptably accurate for missed reloads containing both uranium and weapons plutonium fuel. The expanded set of correlation coefficients make BRACC a useful tool for performing multi-cycle in-core fuel management studies of PWR cores containing weapons plutonium.
Date: June 5, 1997
Creator: Alonso, G. & Parish, T. A.
Object Type: Article
System: The UNT Digital Library