General Terms and Conditions for EFP System Demonstration Facility, Specification S-00-001 (open access)

General Terms and Conditions for EFP System Demonstration Facility, Specification S-00-001

None
Date: June 29, 1981
Creator: unknown
System: The UNT Digital Library
Technical evaluation of the station and instrument ground grid systems at the Davis Besse Nuclear Power Station, Unit 1 (open access)

Technical evaluation of the station and instrument ground grid systems at the Davis Besse Nuclear Power Station, Unit 1

This report documents the technical evaluation of the station and instrument ground grid systems at the Davis Besse Nuclear Power Station, Unit 1. The evaluation is to determine that there are no inadvertent ties between the instrument and station ground grid systems, that any identified inadvertent ties are corrected, and to assure that the installation meets design criteria. The information submitted by the licensee indicates that there are no inadvertent ties between the station and instrument ground grid systems and that the installation meets design criteria.
Date: June 29, 1981
Creator: Selan, J.C.
System: The UNT Digital Library