Microwave-vacuum drying system (MIVAC). Progress report No. 4 (open access)

Microwave-vacuum drying system (MIVAC). Progress report No. 4

Progress in developing a microwave-vacuum system (MIVAC) for drying grain at a commercial grain handling and storage facility is reported. During this period the dryer was redesigned from 48 kW size to 12 kW, components were fabricated and assembled, and performance testing with corn drying was begun. (LCL)
Date: June 30, 1978
Creator: Wear, F. C.
Object Type: Report
System: The UNT Digital Library
Process heat reactor design and analaysis. Quarterly progress report, April 1-June 30, 1978 (open access)

Process heat reactor design and analaysis. Quarterly progress report, April 1-June 30, 1978

This report summarizes the third quarter FY-1978 results of concept design studies at General Atomic Company (GA) for an 842-MW(t) VHTR utilizing an intermediate helium heat transfer loop to provide thermal energy for the production of reducing gas (H/sub 2/ + CO) by steam-reforming a light hydrocarbon. Basic carbon sources may be coal, residual, or oil shale. The report summarizes the various plant configurations selected for the study and presents the conceptual plant layout drawings. Results of design studies on the intermediate heat exchanger are also presented. The status of the performance/optimization code development is discussed, and completion of the core auxiliary cooling system study is summarized.
Date: June 30, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Multi-use geothermal energy system with augmentation for enhanced utilization. Non-electric application of geothermal energy in Susanville, California. Second quarterly technical report, April 1-June 30, 1978 (open access)

Multi-use geothermal energy system with augmentation for enhanced utilization. Non-electric application of geothermal energy in Susanville, California. Second quarterly technical report, April 1-June 30, 1978

The objectives of this study are to determine the economic and technical feasibility of using the low to moderate temperature geothermal resource in the Susanville anomaly in a district heating/cooling system for public or private users and in a Park of Commerce developed in conjunction with the resources development. The Susanville resource temperature is known to be a minimum of 150/sup 0/F and is projected to be a maximum of 239/sup 0/F. Because these factors all contribute to major capital outlays, design approaches have been studied which will permit economical utilization of the resource regardless of the outcome of the drilling. The system selected will depend on the result of the drilling program. This study presents a data base on systems for the temperature range from 150 to 239/sup 0/F. The results of the engineering and economic study currently indicate the region and conditions for economic feasibility. Based on a predicted fuel inflation rate of 7% and a municipal bond interest rate of 10%, the development of the Susanville Geo-Heating District is economically feasible over the entire range of anticipated reservoir conditions. Under conditions of high well costs ($130 to $175 thousand dollars per well) and low resources temperature (150 …
Date: June 30, 1978
Creator: Cunnington, G.R. & Olson, G.K.
Object Type: Report
System: The UNT Digital Library
Reliability based investigation of design factors (open access)

Reliability based investigation of design factors

Second-moment probabilistic techniques are used to formulate structural resistances and loads and to derive reliability-based safety, load, and strength factors for design. Existing concepts of the second-moment reliability theory have been extended to the practical case of multiple load combinations. This development consistently includes the stochastic character of loads and the unpredictable nature of their combinations. For this purpose, a new technique for the evaluation of load combinations is presented, whereby the moments of the extreme of combined loads is obtained in terms of the moments of individual loads and parameters describing their random fluctuations in time. Reliability-based safety, load, and strength factors are derived in terms of the acceptable level of risk, the coefficients of variation of the loads and resistance, uncertainties associated with errors in modeling and estimation, and a set of parameters describing the stochastic nature of loads and their combinations.
Date: June 30, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Mechanical Engineering Department quarterly review, April--June 1978 (open access)

Mechanical Engineering Department quarterly review, April--June 1978

The review is presented in sections on x-ray spectrograph development, sampling of gases in a post shot cavity, oil shale retort heat losses, development of an automated thermocouple, seismic engineering, testing fuel rod casks, and nuclear materials control. A separate abstract was prepared for each section. (JRD)
Date: June 30, 1978
Creator: Stone, R.G. & Bathgate, M.B. (eds.)
Object Type: Report
System: The UNT Digital Library
Measurement of acidity and density of plutonium solutions (open access)

Measurement of acidity and density of plutonium solutions

The solutions were analyzed for acidity and total Pu concentration at ambient temperature while the density was determined at 25, 35, 45, and 60/sup 0/C. From least squares fitting, it was found that the density could be computed to within 1% of the experimental value using the equation D = 1 + 0.0477(H/sup +/) - 4.25 x 10/sup -3/ (H/sup +/)/sup 2/ + 1.477 x 10/sup -3/ (Pu) - (T - 25)/1000. (DLC)
Date: June 30, 1978
Creator: Hofstetter, K.J.; Bowers, D.L. & Kemmerlin, R.P.
Object Type: Report
System: The UNT Digital Library
Texas Attorney General Opinion: H-1200 (open access)

Texas Attorney General Opinion: H-1200

Document issued by the Office of the Attorney General of Texas in Austin, Texas, providing an interpretation of Texas law. It provides the opinion of the Texas Attorney General, John L. Hill, regarding a legal question submitted for clarification; Payment of the court reporter's salary for the 31st Judicial District.
Date: June 30, 1978
Creator: Texas. Attorney-General's Office.
Object Type: Text
System: The Portal to Texas History
Radioisotope Distribution Program Progress Report for April 1978 (open access)

Radioisotope Distribution Program Progress Report for April 1978

None
Date: June 30, 1978
Creator: Lamb, E.
Object Type: Report
System: The UNT Digital Library
Metal vapor excimer laser. Quarterly progress report for period February 1, 1978--April 30, 1978 (open access)

Metal vapor excimer laser. Quarterly progress report for period February 1, 1978--April 30, 1978

Major effort was expended in the final assembly of the gain experiment apparatus; this phase had been delayed by some magnet and discharge tube problems which have now been solved. The addition of the discharge circuitry, now underway, is the last step before gain and discharge tests. The metal testing oven is complete and preliminary tests are underway which show encouraging results concerning the compatibility of mercury vapor and Inconel and 316 SS. Some initial modeling was done with the Boltzmann/kinetics code which demonstrates CdHg production efficiency as a function of E/N.
Date: June 30, 1978
Creator: Kovacs, M.A. & Jacobs, J.H.
Object Type: Report
System: The UNT Digital Library
Hanford and Columbia River Basin Basalts: x-ray characterization before and after hydrothermal treatment (open access)

Hanford and Columbia River Basin Basalts: x-ray characterization before and after hydrothermal treatment

Results are presented of a project to obtain quantitative data to assist in the evaluation of basalts as a nuclear repository host rock, in particular those basalts underlying the Hanford reservation. The two basalts studied are the U.S. Geological Survey's standard Basalt Columbia River-1 (BCR-1) and a section of core from Hanford Drill Hole DDH-3 (A2120/3320). It was found that the principal minerals of Basalts BCR-1 and DDH-3 are still present after hydrothermal treatment up to 400/sup 0/C. No new phases have been observed, with the exception of one in the longest run, 300/sup 0/C for 56 days. There is not enough of this phase present to give positive identification in the bulk powder diffractogram. The spinel magnetite-ulvoespinel was observed to change oxidation state under some conditions. Because uranium and plutonium are both far more soluble in the +6 state than in the +4 state, the oxidation state of the system basalt + waste + water is important. The basalt is in enormous excess and contains both ferrous and ferric iron in its spinels and in augite. Together they should be the principal influence on the oxidation state of the system. Several further X-ray measurements would be useful: first, examination …
Date: June 30, 1978
Creator: Barnes, M.
Object Type: Report
System: The UNT Digital Library
Quality assurance program description for shipping packages of radioactive material (open access)

Quality assurance program description for shipping packages of radioactive material

This quality assurance plan describes the quality assurance program at the Pacific Northwest Laboratory (PNL), for shipping packages of radioactive material. The purpose of this report is to describe how PNL will comply with the Code of Federal Regulations, Title 10, Part 71, Appendix E. In compliance with the instructions from the Nuclear Regulatory Commission (NRC), the 18 criteria from Appendix E are covered.
Date: June 30, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Migration of iron, nickel, cobalt and chromium associated with silver brazing during ceramic-to-metal joining (open access)

Migration of iron, nickel, cobalt and chromium associated with silver brazing during ceramic-to-metal joining

During the study of bond strengths of ceramic-to-metal seals under various brazing conditions, it was observed that the strength was affected by the length of time that the braze material was in the liquid state. Brazing times as short as 10 min sometimes adversely affected the strength of the seal. Photomicrographs of a typical weak bond clearly show silver braze penetration deep in the metallizing layer after 10 min at 20/sup 0/C above the melting point of the braze. A reaction layer was also observed in the photomicrographs. Considerable iron has migrated from the Kovar pin through the silver braze and formed an interface between the silver braze and the molybdenum metallizing material. Significant concentrations of cobalt and nickel were also found in the reaction zone, indicating a diffusion reaction of Kovar through the silver. Further investigations showed that while braze durations as short as 1 min at 20/sup 0/C above the liquid temperature gave much stronger bonds than 10 min did, significant migration of material was evident. In view of the significant migration of both the pin alloy and the braze material, it was concluded that brazing time and temperature should be minimized to achieve maximum bond strength.
Date: June 30, 1978
Creator: Etter, D.E.; Egleston, E.E. & Jaeger, R.R.
Object Type: Report
System: The UNT Digital Library
Vertical dispersion correction (open access)

Vertical dispersion correction

A method for correcting the vertical dispersion is proposed in which the vertical closed orbit is primarily displaced at locations where the sextupole chromaticity correctors are placed in order to generate the skew quadrupole fields needed to correct the vertical dispersion. The results of a computer simulation study indicate that this method is feasible for ISABELLE, where a maximum displacement of the vertical closed orbit of about 2.0 mm is required.
Date: June 30, 1978
Creator: Parzen, G
Object Type: Report
System: The UNT Digital Library
Western Gas Sands Project status report (open access)

Western Gas Sands Project status report

A summary is presented of the progress of government sponsored projects undertaken to increase gas production from low permeability gas sands of the western United States during May, 1978. Background information is given in the September 1977 Status Report, NVO/0655-100. The Department of Energy's (DOE) Nevada Operations Office (NVO), is finalizing a Request for Proposal (RFP) covering Technical and Administrative Support for the Project Manager for FY79. C. H. Atkinson, the Western Gas Sands Project (WGSP) Manager, was an observer of the third MHF treatment of Mobil Research and Development Corporation's well No. F-31-136. The fracture was performed on May 10, 1978. R. L. Mann of CER Corporation, met with Dr. Steve Holditch of Texas A and M University to discuss the utilization of the PDP 11/10 computer to be installed in the Mobile Well Test Facility. The USGS is continuing geological and geophysical studies in the four primary study areas. Two flights were made in preparation for low-level olique photography. The Bartlesville Energy Research Center (BERC) and participating National Laboratories, funded by DOE, are continuing their work in the area of research and development. The emphasis is on the development of new tools and instrumentation systems, rock mechanics, mathematical …
Date: June 30, 1978
Creator: Atkinson, C.H.
Object Type: Report
System: The UNT Digital Library
Analysis of No. 2 heating oil prices for the 1977--78 heating season (open access)

Analysis of No. 2 heating oil prices for the 1977--78 heating season

The factual findings of DOE's Office of Fuels Regulation regarding No. 2 heating oil price data for the 1977-1978 heating season are presented. OFR's analysis was based on data gathered by the Energy Information Administration (EIA) in connection with the current program to monitor the prices of home heating oil. Results show that the average price paid by residential customers increased 5.2%; the average increase in the prices wholesalers charged other wholesalers and retailers was 1.6%; the average increase in prices that wholesalers paid refiners was 1.4%; and the refiner index was marginally exceeded twice during the heating season and, on average, refiner prices to wholesalers were below the guideline. Information is included on retail, wholesale, and refiners gross margins and on analytic constraints. (JRD)
Date: June 30, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library
Texas Register, Volume 3, Number 48, Pages 2215-2268, June 30, 1978 (open access)

Texas Register, Volume 3, Number 48, Pages 2215-2268, June 30, 1978

A weekly publication, the Texas Register serves as the journal of state agency rulemaking for Texas. Information published in the Texas Register includes proposed, adopted, withdrawn and emergency rule actions, notices of state agency review of agency rules, governor's appointments, attorney general opinions, and miscellaneous documents such as requests for proposals. After adoption, these rulemaking actions are codified into the Texas Administrative Code.
Date: June 30, 1978
Creator: Texas. Secretary of State.
Object Type: Journal/Magazine/Newsletter
System: The Portal to Texas History
Final Report: Intermediate-Depth Hole No. 1-78-U1 (open access)

Final Report: Intermediate-Depth Hole No. 1-78-U1

During the period May 28, 1978 to June 30, 1978, an intermediate depth heat flow borehole (1-78-Ul) was completed on the Socorro Prospect, New Mexico. Rock types encountered in the hole ranged from unconsolidated Quaternary alluvium to clays and dense volcanic rocks. Depth of the hole was 1360 feet with the major drilling problems being sticky clays and hard rock. The geothermal gradient measured in this borehole was 2.46 F/100 ft with an average thermal conductivity of 5.9 mcal/cm-sec- C. The calculated heat flow value is 2.7 HFU (1 HFU = 1 {micro}cal/cm{sup 2}-sec). The linearity of the gradient for this hole suggests that heat transport in the shallow subsurface penetrated by the borehole is predominantly by conduction. Based on published data as well as the results of the present survey, a value of about 2.5 HFU is probably representative of the background heat flow in the area of the Socorro Prospect. A surface heat flow of 2.5 HFU implies partial melting in the lower crust and upper mantle beneath the Prospect but does not necessitate the presence of an economic geothermal deposit.
Date: June 30, 1978
Creator: unknown
Object Type: Report
System: The UNT Digital Library