Design and Operation of a Four-Ton-Per-Hour Gold and Silver Ore-Sampling Plant (open access)

Design and Operation of a Four-Ton-Per-Hour Gold and Silver Ore-Sampling Plant

Report issued by the U.S. Bureau of Mines discussing the operations of silver and gold ore-sampling plants. The facility designs and operation methods are presented. This report includes tables, and illustrations.
Date: June 1936
Creator: Gardner, E. D. & Leddell, W. A.
System: The UNT Digital Library