SM-1 Research and Development Program : Final Report on Fission Product Activity in the SM-1 Primary Coolant, Task XIII (open access)

SM-1 Research and Development Program : Final Report on Fission Product Activity in the SM-1 Primary Coolant, Task XIII

Abstract: Fission product measurements were made on the SM-1 primary coolant. The airborne activity observed during the sampling of the primary system was identified. An analysis was made on the primary coolant for alpha activity and on the secondary water for fission production iodine.
Date: June 30, 1959
Creator: Hasse, Robert A.
System: The UNT Digital Library
Final Report on Design Tests PR-50 and PR-51: Reactor Piping Seal Testing and Reactor Piping Structural Integrity (open access)

Final Report on Design Tests PR-50 and PR-51: Reactor Piping Seal Testing and Reactor Piping Structural Integrity

A test program conducted to develop high integrity piping and seal components for Plutonium Recycle Test Reactor installation. Methods of preventing leakage of costly D2O coolant and maintaining operational safety were investigated.
Date: June 26, 1959
Creator: Jackson, P. M.
System: The UNT Digital Library